In this article: Section 42 — Electric welders. The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Rule 42-000 Scope — states that Section 42 is a supplementary or amendatory section of the code and applies to the installation of electric welders. The CEC Handbook provides additional notes and diagrams to better explain this section. There are two main types of welders: arc and resistance welders. Arc welders use a sacrificial rod to weld the metal target material together. Resistance welders fuse the metal target material together. Arc welders are divided further into transformer and motor-generator types.

Rule 42-002 Special terminology — contains definitions for special terms that apply to section 42 that are not defined in Section 0 such as: actual primary current, duty cycle, and rated primary current. These terms will be important when calculating the ampacity of the supply conductors for welders.

Rule 42-004 Receptacles and attachment plugs — outlines that, where receptacles are installed for the plug and cord-connection of a portable welder, the ampacity rating of the overcurrent protection for the circuit can be more than the rating of the receptacle, but the receptacle must have a rating equal to or greater than the ampacity of the supply conductors for the welder. This is important because the high instantaneous inrush start-up current of the welder will exceed the branch circuit conductor ampacity. This prevents nuisance tripping.

Transformer arc welders

Rule 42-006 Supply conductors — provides the factors in determining the ampacity of supply conductors for transformer type arc welders. The ampacity depends on the duty cycle of a single welder, as in sub-rule (1) and the demand factors where a group of welders are supplied by one circuit as in sub-rule (2). The CEC Handbook contains Tables 42-1 and 42-2, which show the correlation between duty cycle and demand factor and determination of the demand factor for multiple welder installations.

Rule 42-008 Overcurrent protection for transformer arc welders — specifies the factors to be used in calculating the rating of circuit overcurrent protection per the ampacity of supply conductors and welders as in sub-rule (1). Sub-rule (2) outlines the factors in calculating the rating of the overcurrent protection for the supply conductors using Tables 1,2,3, or 4. Sub-rule (3) provides the factors in calculating the rating of the overcurrent protection for a feeder supplying a group of transformer arc welders.

Rule 42-010 Disconnecting means — requires that where there is no integral disconnect on the welder, one must be provided to disconnect the supply conductors, and it must have sufficient current rating capacity to accommodate the overcurrent protection.

Motor-generator arc welders

Rule 42-012 Conductors, protection, and control of motor-generator arc welders — specifies that the rules of Section 4 and Section 28 generally apply to the determination of supply conductor ampacity, and selection of protection and control. The CEC handbook outlines methods of calculation of duty-related demand factors through Table 42-1, 42-2 and 42-3.

Resistance welders

Rule 42-014 Supply conductors for resistance welders — provides the factors in determining the ampacity of supply conductors depending on the primary current or duty cycle of either an individual seam resistance welder or an automatically fed resistance welder. Table 42-4 in the CEC Handbook shows the relationship between duty cycle and demand factors.

Rule 42-016 Overcurrent protection — specifies the factors in determining the rating of the overcurrent protection based on the rated primary current of the welder and the allowable ampacity of the supply conductors based on Tables 1,2,3 or 4. The CEC Handbook outlines methods of calculation of duty related demand factors through Tables 42-3 and 42-4. For determining the rating of overcurrent Protection for a group of resistance welders use the factors contained in rule 42-014.

Rule 42-018 Control of resistance welders — requires that a resistance welder have a disconnecting switch or circuit breaker rated for the capacity of the supply conductors to isolate the welder from the supply circuit.

Rule 42-020 Nameplate data for resistance welders — requires data specific to the resistance welder be provided on the nameplate, including rated KVA at 50% duty cycle, maximum and minimum open-circuit secondary voltage, short circuit current, and the throat and gap setting.

In the next installment, we will be discussing Section 44 — Theatre installations

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA

** Note the CEC Handbook is also published by CSA.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.


The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA
William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

 

A key component of any electronic or electrical system is the cable assembly/cable harness, yet it typically is one of the last components to be addressed. When designing a system the cable assembly should be addressed as early in the design stage as possible to allow for the best design to be ...

Changing Scene

  • Prev
  Siemens Canada has appointed Faisal Kazi as President & CEO of Siemens Canada ...
  This acquisition builds on Danatec’s 30+ year history of delivering regulated ...
  This year, Nova Scotia Power is investing nearly $4 million dollars to ensure the hydro ...
  The Port of Montreal estimates that the shore power project will eliminate 2,800 tonnes ...
  The next chapter in Allanson International’s partnership with the Impact Centre has ...
  The Irma Energy Connection between Irma Wind Farm and Alberta Electric System Operator ...
  Until recently, keeping track of this number has been a matter of simply adding new ...
  Electricity Human Resources Canada (EHRC), in partnership with the Government of ...
  “Electric vehicles are the future, and we want to help make Nova Scotia ready for ...
The SmartFlower is more compact and attractive than traditional solar panels. The face of the ...

Clean Energy 

Canada and Sweden are setting up a new global Technology Collaboration Program (TCP) under the International Energy Agency (IEA) to promote leadership roles for women in clean energy.

The establishment of the Clean Energy Education and Empowerment TCP (C3E TCP) was announced during the recent 8th Clean Energy Ministerial (CEM8) meeting in Beijing. It builds on the successful C3E initiative created by member governments of the CEM in 2010. Shown in photo: Jim Carr, Minister of Energy, Canada (left), and Ibrahim Baylan, Minister for Policy Coordination and Energy, Sweden.

 

Read More: Advancing Women in Clean Energy 

Codes and Regulations Brought to You by the CSA Group

  • Prev
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...
  In this article: Section 40 — Electric cranes and hoists. The CE Code is a ...


Tools for the Trade

  • Prev
  Greenlee has taken their standard storage boxes to the next level with the limited ...
  The SureTest circuit analyzers "look behind walls" to identify wiring problems that can ...
  The Ideal Dispenser is equipped with high-quality adhesive and 3 mil thickness that ...
  The Adjustable cable stripping tool has an intuitive blade design that allows users to ...
  The SIMpull CoilPAK completes the SIMpull Circuit Management System, taking heavy, ...
  The Javelin is a new product that makes drilling holes through stud walls easier. ...
  Focus is one of the most important aspects of thermography, and an out of focus image can ...
  Ideal Precision Levels are designed for both conduit and regular level applications. The ...
  The ET130 is an easy-to-use precision light meter with single-handed operation to monitor ...

Latest Articles

  • Prev
A key component of any electronic or electrical system is the cable assembly/cable harness, yet it ...
Canadian municipalities issued $8.1 billion worth of building permits in June, up 2.5% from May and ...
Ottawa and its surrounding area has become one of Ontario’s fastest growing cities because ...
I first met Mike Byam at the 2017 Ideal Supply northern trade show in Barrie, Ontario, and have ...
In this article: Section 54 — Community Antenna Distribution and Radio and Television ...

Low-Voltage TrendsThe shift from electrical to digital systems, and the emerging low-voltage power options to supply them, may be the biggest change the electrical industry has seen in the last 100 years. This transition is having significant impact on every aspect of the traditional electrical channel, from product conception, production, sales, delivery and installation.Equipping the channel to embrace emerging technologies, specifically those related to low-voltage direct current (LVDC) power developments,* and opportunities derived from LVDC systems, is the purpose of this research study by Electro-Federation Canada.

Read More 

Product News

  • Prev
  The Thinline BLTL suspended is ideal for architectural, commercial, and retail lighting ...
  Nemalux GSLEDIP48 (46.19” [1173 mm]) fixtures are durable and robust with a ...
  The eel UltraThin LED Recessed Luminaire fits where no other recessed fixture can… ...
  iCANview Remote Scene Control Software (iCANview-SC) is ideal for supervisory offices and ...
  The L194T8 is a 19-watt linear LED lamp is UV and IR radiation free, minimizing ...
  The Eiko LED HID replacement is a great energy saving LED for various ...
  The StanPro CLR-L is a retrofit plate that comes complete with an IP68 rated LED module ...
  The ESA Series of adjustable and wall-wash lighting, with impressive lumen packages ...
  The Audacy Light Sensors detect ambient light in a designated space and send measurements ...
GRAFIK T is the latest innovation in Lutron’s CL family of products. The simple, ...

Peers & Profiles

  • Prev
Mike Marsh, President and CEO of SaskPower, has been a leading figure in Saskatchewan’s ...
Gordon MacDonald is a cheerful, driven individual who loves to be challenged, a trait that suits ...
  Most of us have a difficult enough time managing one job and a home life. However, some ...
  Since 2012 Barnstormer has advanced the abilities of their brewery with the installation ...
  Electrical Industry Canada was recently given the unique opportunity to see ...
  Vickery Electric has been providing electrical services to the Whitby area since 1923, ...
Safety standards in the electrical industry are constantly evolving, which requires that ...
Newman Electric was founded in 1995 and has established itself as a leading electrical contractor ...
Schneider Electric, a global specialist in energy management and automation, today announced ...
New York City’s Queens-Midtown tunnel is the latest lighting project to be undertaken by ...

Panel Builder

Is your business involved in the design, specification, build, installation and commissioning of control panels and systems? If yes, take the survey to receive a $5 Tim Horton's e-gift card.

Kerrwil Publications Limited, in conjunction with its soon to be launched Panel Builder Insights Newsletter, beginning in October 2017, is surveying the Canadian Panel Building sector. In this regard, we have a few basic questions we hope you can answer. For your time, we are offering a Tim Horton’s e-gift card valued at $5 (e-gifts will be sent to your email within 24-48 hrs of survey completion). The survey should take no more than 5-10 minutes.

 Take the survey here: https://www.surveymonkey.com/r/Panelbuilder

Subscribe to Panel Builder Insights at, http://subscribe.panelbuildersystemsintegrator.ca/

 

Copper $US Dollar price per pound

Electrical Industry Newsweek

This special weekly newsletter has the broadest reach of those that are involved in all aspects of the electrical industry including electrical construction and maintenance professionals and electrical specifying engineers across Canada. EIN is designed to provide electrical professionals’ insight and intelligence on those developments in the industry that effect design, specification, installation of electrical equipment. From corporate news to new technologies and insightful opinions EIN will become your first read in the electrical industry in Canada. Published weekly – every Tuesday
Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
2016 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil