In this article: Section 44 — Theatre Installations. The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Rule 44-000 Scope states that Section 44 is a supplementary or amendatory section of the code and applies to electrical equipment and installations in buildings or parts thereof that are used for dramatic, operatic, motion picture or other shows. It should be noted that, because of rapid advances in the theatre industry, some rules in this section may refer to electrical equipment that may be obsolete. The CEC Handbook provides additional notes and diagrams to better explain this section.

The section is divided into five parts:

• General rules, which applies to all theatre installations
• Fixed stage switchboards
• Portable switchboards on stage
• Fixed stage equipment
• Portable stage equipment

General

Rule 44-100 Travelling shows requires that a permit must be obtained before any electrical equipment is used for the initial performance of a travelling theatre company, circus, or other type of travelling show, even if held in a theatre. This ensures that a qualified person oversees the installation.

Rule 44-102 Wiring method requires that all wiring, in the stage, stage wing areas, orchestra pits and projection booths must be in rigid metal conduit, electrical metallic tubing, mineral-insulated cable, flexible metal conduit, armoured cable, lead-sheathed armoured cable, aluminum-sheathed cable, or copper-sheathed cable. Note that surface raceways are not permitted on the stage side of the proscenium wall. Flexible cord or cable is permitted in accordance with rules 44-252, 44-320, 44-350, and 44-354 of this section and other wiring must be in accordance with Section 12 or Section 76. The proscenium is the frame separating the stage from the audience.

Rule 44-104 limits the number of border, stage pocket, or remote control circuit conductors to the requirements of rule 12-910. In addition, the fill of conductors is limited to 20% of the cross-sectional area of auxiliary gutters or metal wireways.

Rule 44-106 permits aisle light circuits to supply up to 30 - 25 watt lights.

Fixed stage switchboards

Rules 44-200 and 44-202 require fixed stage switchboards to

• be dead front
• have mechanical protection above the switchboard covering the full length as well as the space between the board and the wall behind
• have exposed live parts on the back of the board enclosed by the walls of the building, by wire mesh grilles, or by other acceptable methods
• have a self-closing door at the entrance of the enclosure

Rule 44-204 specifies that only externally operated enclosed switches shall be used.

Rule 44-206 requires that a pilot lamp

• protected by a 15 amp or less overcurrent device
• connected ahead of any master switch

be included in every switchboard enclosure that is connected to the circuit supplying the switchboard.

Rule 44-208 specifies that the fuse(s) for switchboards can be either plug or cartridge type but must be provided with an additional separate enclosure.

Rule 44-210 requires that an overcurrent device be connected in the ungrounded conductor of each circuit leaving the switchboard. Notwithstanding Rule 30-104, a 120-volt luminaire may be protected by an overcurrent device rated up to 100 A.

Rule 44-212 governs the installation of lighting dimmers and requires that

• they must be completely disconnected from the supply when they are in the open position
• resistance type dimmers that do not open the circuit may be connected in a grounded neutral conductor
• all current-carrying parts of dimmers must be enclosed to prevent accidental contact

Rule 44-214 requires that stage and gallery pockets, which are receptacles in the performance space used to power stage lighting, be controlled from the switchboard.

Rule 44-216 provides that, due to the high heat and vibration that may be associated with switchboards, some additional requirements that conductors must have are

• insulation suitable for the temperatures involved and not less than 125°C
• an ampacity concurrent with the switch or overcurrent device to which they are connected
• bushed holes where they pass through a metal enclosure
• wire strands soldered together fastening under a clamp or binding screw
• soldered into a lug or connected to a solderless lug, where the conductor is No.8 AWG or larger
Portable switchboards on stage

Rule 44-250 provides that portable switchboards must be constructed in substantial enclosures, which may be open during operation, if there are no exposed live parts except on dimmer faceplates.

Rule 44-252 requires that portable switchboards be supplied from an externally operated, enclosed, fused master switch within the switchboard that

• is supplied by a flexible cord or cable, type S, SO, or ST, that has sufficient ampacity to carry the total load current of the switchboard
• arranged to cut off current from all apparatus within the enclosure, except the pilot light
• has an ampere-rating of the fuses not greater than the total load current of the switchboard

Fixed stage equipment

Rule 44-300 specifies that footlights be installed in individual outlet boxes, where wired in rigid metal conduit or EMT, or in a metal trough to ensure bonding continuity.

Rule 44-302 provides minimum thickness of not less than

• 0.78 mm thick for metal work for footlights, borders, proscenium sidelights, and strips
• 0.53 mm thick for metal work of bunches and portable strips

Rule 44-304 requires that terminals of lampholders have a clearance of a minimum of 13mm from the metal trough.
Rule 44-306 calls for suitable guards to protect borders, proscenium sidelights and strips from mechanical damage and accidental contact with combustible material.
Rule 44-308 specifies that suspended luminaires in borders and strips must be electrically and mechanically safe.
Rule 44-310 — because of possible severe vibration, conductor terminations at lampholders need to have a positive and reliable connection by soldering or suitable solderless connections.
Rule 44-312 identifies that mogul lampholders need to be double walled with adequate ventilation between the walls.
Rule 44-314 requires that conductors supplying field assembled foot, border, proscenium, and portable strip luminaires must have insulation rating suitable for the high operating temperatures involved and not less than 125 °C.
Rule 44-316 reiterates that branch circuit overcurrent protection for footlights, border lights, and proscenium sidelights must be consistent with Rule 30-104.
Rule 44-318 states that pendant lights containing lamps with more than 100-watt capacity need to be provided with a minimum 13mm mesh guard to contain and prevent falling glass.
Rule 44-320 specifies that flexible cord or cable supplying border lights must be

• S, SO, or ST type
• fed from points on the grid iron or from other acceptable overhead points, but not from side walls
• arranged so that clamps and binding screws are free from strain
• provided with a metal bushing where passing through a metal or wooden enclosure
• located to permit convenient access to terminals or binding posts inside the switchboard enclosure

Rule 44-322 addresses the flexibility of wiring for arc pockets, which are receptacles that supply carbon-arc lighting fixtures.
Rule 44-324 states that at least one receptacle installed in gallery pockets be rated not less than 30 amps for use by higher capacity lighting equipment.
Rule 44-326 specifies that arc and incandescent receptacles cannot be interchangeable, and receptacles and plugs intended for the connection of

• arc lamps must be rated not less than 35 A and be supplied by a minimum No. 6 AWG copper conductor
• incandescent lamps be rated not less than 15 A and be supplied by a minimum No.12 AWG copper or No. 10 AWG aluminum conductor

Rule 44-328 requires that curtain motors must be the enclosed type.
Rule 44-330 governs the control and operation of flue dampers, which are located above the stage to allow smoke to exit in case of fire. Where stage flue dampers are released by an electrical device, it must be

• held in the closed position and automatically released on power interruption
• controlled by at least two single-pole switches enclosed in self-closing but unlocked or latched metal boxes, one located at the electrician’s station, and the other as per rule 28-604
• rated for full circuit voltage, with minimal circuit resistance, and located in a protective metal box in the loft above the scenery

Portable stage equipment

Rule 44-350 requires that electrical fixtures attached to scenery must be securely fastened and supplied with flexible cord or cable suitable for hard usage, and selected in accordance with Rules 4-012 and 4-040. In addition, bushings must be used where stems of fixtures extend through the scenery.
Rule 44-352 directs where festooned lighting is used that the joints be staggered and that guards or shades be used to prevent contact with combustible material.
Rule 44-354 states that supply conductors for arc lamps, bunches, or other portable equipment must be approved for extra-hard usage. Other miscellaneous portable equipment may be other than extra-hard usage. The supply conductors must all selected as per rules 4-012 and 4-040.
Rule 44-356 requires that special stage effects portable equipment must be acceptable to the local AHJ and located to prevent flames, sparks or hot particles from contacting combustible material.
In the next installment, we will discuss Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and Life Safety Systems.

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA

** Note the CEC Handbook is also published by CSA.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

 

Changing Scene

  • Prev
  After 31 years of service with Rexel Canada, Rachelle Caron, General Manager, Westburne ...
  With a growing demand for non-polluting, energy efficient vehicles, ElectraMeccanica ...
  Mark Lloyd and the Board of Directors of the Electrical Contractors Association of ...
Rittal Systems Canada, the world’s largest and most trusted manufacturer of enclosures, ...
  CNBC has announced it has teamed up with a leader in digital transformation of energy ...
  Stephen Welby has been hired as IEEE’s next executive director and chief operating ...
  Schneider Electric has announced that Susan Uthayakumar will become Country ...
  Electro-Federation Canada (EFC) and its members are proud to support Canadian university ...
  In the context of the energy transition currently unfolding where reducing greenhouse gas ...
  Nova Scotia Power plans to put the power in our customers’ hands by introducing ...

 

Electricians Provide Assistance in TD Centre's 50th Anniversary Illumination Project

Contractors Guild, Ainsworth, Symtech, Plan and ACML donated their services to temporarily reconfigure the buildings' automated lighting systems, while a crew of staff and volunteers worked to open and close blinds on over 6,000 windows across the TD Centre's five towers to create the message "Less is more or" in 100-foot-tall lights.

A media statement called it the largest public art project of its kind undertaken anywhere in the world.

Read more: Electricians Provide Assistance...

 

Codes and Regulations Brought to You by the CSA Group

  • Prev
In this article: Section 58 — Passenger Ropeways and Similar Equipment. Rule 58-000 ...
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...
  In this article: Section 40 — Electric cranes and hoists. The CE Code is a ...

CSA

 

By William (Bill) Burr

In this article: Section 56 — Optical fibre cables. Section 56 is a supplementary or amendatory section of the code and applies to the installation of optical fibre cables in conjunction with all other electrical systems. Rule 56-002 provides a special terminology definition for an Optical Fibre Cable — a cable consisting of one or more optical fibres that transmits modulated light for the purpose of control, signalling or communications.

Rule 56-102 outlines that there are three types of optical fibre cables.



Tools for the Trade

  • Prev
  Stripping and crimping device, 100 - 240 V input voltage, for insulated ferrules with a ...
Professional all-in-one cutter/stripper for coaxial and twisted pair cables     ...
  Klein Tools' Coax Explorrer 2 tests coaxial cable and maps up to 4 locations   ...
  Ideal Industries' T-14 wire stripper s are ideal for all professionals working within the ...
  The ATS850 conveyor eliminates all types of electro static discharge requirements. ...
  Lorik Tool & Automation has the experience and ability to manufacture a variety of ...
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...
  This new lock box is ideal for group lockout situations with multiple isolation points ...

Latest Articles

Has no content to show!

Wind Farm

 

Wind technicians have been working to keep Canada’s turbines turning for a long time now.

TransAlta’s Cowley Ridge Wind Farm was one of the first commercial facilities in the country with the original technicians back in 1993 describing their experiences of being “up so high” and that “there was nothing like it.”

Sitting on 25 meter tall lattice work towers, these machines were less than a third of the height of most tubular wind turbine towers today. However, many of the same skills learned on these first sites are still relevant today even though the technology has certainly progressed.

Read More: The Road Behind and the Road Ahead... 

 

 

 

Product News

  • Prev
  STANDARD has revised its pricing for the LED RetroKit to compete on the market! Call your ...
  STANDARD’s LED Outdoor Bollards are perfect for lighting pathways and entryways, ...
  STANDARD’s LED Ceiling Luminaire and Shade combination can be the finishing touch ...
  The STANDARD 4-foot LED Shoplight delivers 4 000 lumens of brilliant white light of the ...
  Brady has announced the launch of the Wraptor A6500 Printer Applicator. This new ...
  Emerson has announced major upgrade of its Appleton Mercmaster LED series, the most ...
  3M Electrical insulating tape has a high puncture, abrasion and cut-through resistance ...
  With its precision, reliability and ease of use, the Fluke 3000 FC Wireless Multimeter is ...
  This range of high performance power meters and analysers can be used to measure simple ...
  Schneider's PowerLogic is a remote terminal unit for data acquisition and integrated ...

 

Copper $US Dollar price per pound

Gordon M

 Gordon MacDonald is a cheerful, driven individual who loves to be challenged, a trait that suits him well as a lighting specialist overseeing retrofit projects for Rexel in New Brunswick and P.E.I. He also has had a unique introduction to the field he now works in. 

Gordon was born and raised in Moncton, New Brunswick and has lived there for most of his life. He has an incredibly busy home life that extends to his children, stepchildren and grandchildren. Beyond family life he enjoys “playing guitar and piano, going target shooting, cooking BBQ, trying new foods and learning new things.”

How One Hospital Is Improving Patient Care with Advanced Analytics Demand for healthcare is outstripping capacity, but Toronto’s Humber River Hospital has a solution: a digital Command Centre powered by GE’s Wall of Analytics. As populations grow and age, many hospitals are being stretched past their limits. Rather than apply temporary or partial fixes to address the challenges that underlie this busy, acute care hospital, Toronto’s Humber River Hospital has chosen to implement a holistic, state-of-the-art hospital command centre that will enable it to achieve radical gains in quality and efficiency.

The hospital partnered with GE Healthcare Partners to conceive, design and build the new 4,500 square-foot command centre, a cornerstone of which will be GE’s Wall of Analytics that processes real-time data from multiple source systems across the hospital.

Read more: How One Hospital is ...

 

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
2016 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil