Canadian Electrical Industry News Week

May 26, 2019

Title 24Government-mandated policies such as California’s Building Code, Title 24 have been instrumental in identifying new ways to reduce energy consumption. Title 24 requires that, by 2030, all new nonresidential construction must meet zero net energy requirements, which means a building cannot emit more energy than it produces. Additionally, Title 24 compliance may be required in existing non-residential buildings in the event of certain lighting alterations. According to the California Energy Commission, standards like Title 24 and other energy efficiency efforts have helped keep the state’s per capita electricity use flat over the last 40 years.

A new document published by UL provides audit instructions, responsibilities of the manufacturer, and technical requirements for the certification of electric signs to the California Energy Commission (CEC) 2016 Building Energy Efficiency Standards Title 24, Part 6 of the California Code of Regulation. Here’s a sampling of the requirements.

Responsibilities of the manufacturer

  • UL markings: restrict the use of markings that reference Title 24 to those products that are found by the manufacturer’s own inspection to comply with the requirements in this document. The use of such markings is further limited by the agreements that have been executed by the subscriber and UL.

  • Access to facilities: during hours in which the factory is in operation, permit the field representative access to any portion of the premises where the product or components thereof are being fabricated, processed, finished or stored. The field representative shall be permitted to audit, prior to shipment, any product bearing or intended to bear markings referencing Title 24 as indicated in this document. If product disassembly is required, the manufacturer shall undertake it.
  • Resolution of non-conformances: perform a root cause analysis of nonconforming test results reported by UL in order to determine and implement appropriate corrective actions. Upon request, the manufacturer shall submit the findings of their analysis and action plan for review and/or monitoring by UL.

Manufacturer’s technical representative (MTR) 

Each manufacturer shall designate and maintain at least one representative that meets the criteria of a manufacturer’s technical representative for energy certification of electric signs to Title 24. To qualify, this individual shall successfully complete the UL University Online curriculum for Title 24 Energy Certification.

Compliance to this requirement will be verified by the UL representative by requesting the Certificate of Completion of the required UL University Sign Course for the designee(s).

Compliance assessment process 

The manufacturer is responsible for conducting and documenting the compliance assessment process on a Master Compliance Record (MCR) for all products intended to bear the UL Title 24 mark.

The compliance evaluation is a review of the sign construction in accordance with all applicable requirements and a determination of compliance with those requirements.

1. Required documentation for each sign or sign construction will include the completion of the Master Compliance Record or MCR. A copy of this document is attached as Exhibit A. This form may be completed and stored electronically or in paper form.

2. For multiple signs identical in construction or for a family of similar signs, the documentation needs only to reference a representative sign or signs. Documented records shall be maintained for each product, group, or family of signs that bear the UL Listing Mark.

Responsibilities of the field representative

  • Audits: perform in-factory audits to review samples of signs bearing, or intending to bear, the UL Title 24 energy efficiency mark. Additionally, the field representative is to audit records of past production if production is not available.
  • MTR verification: during each Factory Visit, the UL field representative will verify the manufacturer has a qualified “manufacturer’s technical representative” that meets the requirements specified in the “Responsibilities of the manufacturer” section above. The manufacturer will be issued a document from UL University indicating successful completion of the course. This document is to be kept on file by the manufacturer to facilitate MTR verification by the field representative.
  • Instructions for inspection reports: an inspection report is to be completed for the energy inspection and a copy is to be provided to the sign manufacturer. A separate inspection is to be completed for the energy audit; reports are not to be combined with the safety inspection.
  • Instructions for variation notices (VNs): any nonconformance to the technical or documentation requirements found during the audit is to be documented on a variation notice. Corrective action is to be taken by the manufacturer if a sign displaying, or intended to display, the Title 24 Energy Certification mark does not conform to the requirements contained in this document.

Technical requirements — general

Sign lighting energy standards apply to both indoor and outdoor signs and contain two different prescriptive compliance options:

  • Option A: maximum allowed lighting power (also referred to as the watts per square foot approach)
  • Option B: Specific lighting source approach.

Either approach may be utilized to determine compliance.

Approach 1. maximum allowed lighting power approach (watts per square foot approach)

Maximum allowed lighting power approach specifies a maximum lighting power that can be installed, expressed in W/ft2 of sign area. Signs cannot exceed the following power limits:

  • Internally Illuminated – shall not exceed 12 W/ft2
  • Externally Illuminated – shall not exceed 2.3 W/ft2

Steps to determining compliance using the maximum allowed lighting power approach 

1. Determine if the is sign internally or externally illuminated.

2. Calculate area of the sign face.

  • For double-face signs, only one side is used for the calculation
  • For changing message boards use the area of the message board face

3. Determine the total input wattage of the sign.

  • For neon, fluorescent, HID and LED signs use the input amperage (A) multiplied by the input volts (V) of all ballasts or transformers; or the marked input wattage rating (if available).
  • For incandescent signs use the wattage specified on the sign re-lamping label.
  • For changing message boards use the input volts x amps and the area of the board face.

4. Divide the input watts by the calculated sign face area (square ft.).

  • Internally Illuminated – shall not exceed 12 W/ft2
  • Externally Illuminated – shall not exceed 2.3 W/ft2

Approach 2. specific lighting source approach

The specific lighting source approach specifies that signs illuminated exclusively with efficient lighting sources (e.g. electronic ballasts, high efficiency lamps, efficient power supplies and efficient transformers) comply with the energy requirements, regardless of the power consumed.

  • Internally Illuminated – shall not exceed 12 W/ft2
  • Externally Illuminated – Shall not exceed 2.3 W/ft2

The document also identifies light sources to be used with the specific lighting source approach and ;provided a sample master compliance record

See the full document here: industries.ul.com/wp-content/uploads/sites/2/2015/03/Title-24-Brochure.pdf.

Find out more about Title 24: www.energy.ca.gov/title24/

Photo source: Luca Bravo on Unsplash

Changing Scene

  • Prev
The BCEA's Woman's Network THRIVE Summit is taking place on October 4th at the Executive Inn ...
NSI Industries has announced the acquisition of electrical products manufacturer Bridgeport ...
The National Electrical Trade Council (NETCO)—jointly sponsored by International Brotherhood ...
IDEAL Electrical has launched its fourth annual national competition to find the best ...
IDEAL Industries Canada has announced the appointment of Sean Bernard as Regional Sales Manager to ...
In his new role as Stelpro's Vice-President, Sales and Business Development, ...
The Support Equity and Under-Represented Groups project will address the under-representation of ...
Show your support by sharing a photo or experience of how a lineworker has made an impact in your ...
Eleven highly accomplished Hamiltonians are being honoured by Mohawk College as Distinguished ...
Canada’s Minister of Natural Resources recently announced the Governor in Council has ...

Electrician Forum Brought to you by Schneider Electric

As industry experts you know the products you use everyday better than anyone and should have input on what information you receive about products and what could improve them.

Therefore, we want your insight on the biggest challenges or issues you face when installing loadcentres, breakers (CAFI, GFI's…) and other surge protection devices. We ask that you do not provide product specific details but rather your general issues and concerns or any questions that have come to mind while working with these product types. Provide us with your valued expert insight into the issues you have faced so manufacturers can better inform you about the installation and use of these products. Lets generate some discussion that will help guide the Industry.

Make your comments  HERE

 

ABB PortalThe ABB eFinder portal simplifies the process of locating inventory from ABB’s selection of products used for connection and transmission of electrical power. Customers may now search online for ABB Installation Products and can purchase them from the distributor who has the products in stock. Once the product is located, the customer may buy it from the distributor by connecting directly to the distributor’s e-commerce page and placing the products in an online shopping cart for the final purchase transaction.

 

 

 

Read More

 

 

 

Codes and Regulations Brought to You by the CSA Group

  • Prev
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
In this article: Tables — Part B. This section of the Code contains 99 tables of essential ...
In this article: Section 58 — Passenger Ropeways and Similar Equipment. Rule 58-000 ...
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...

 

PolycarbonateElectronic waste is a huge issue, with Statista estimating nearly 50 million metric tons were generated globally last year alone.* Some of the materials traditionally used in LED lamp and luminaire components contribute to e-waste, and the industry is seeking more sustainable material alternatives. Thermally conductive (TC) polycarbonates, like those from Covestro, can replace aluminum in heat sinks, providing just such a replacement option. (The back enclosure of the A.L.P. Lighting Recruit wall mount fixture, shown in photo, is injection moulded from Makrolon TC polycarbonate.)

 

Read More 

Latest Articles

  • Prev
Pick up a newspaper or scan your preferred electronic newsfeed and you’ll likely see a series ...
Britech Corp, one of Canada’s largest heating cable companies has signed a formal agreement ...
Electrical enclosures serve to protect electrical devices from adverse environmental influences, ...

 

White PaperBy Steven Carlini, Schneider Electric

Internet use is trending towards bandwidth-intensive content and an increasing number of attached “things.” At the same time, mobile telecom networks and data networks are converging into a cloud computing architecture. To support needs today and tomorrow, computing power and storage is being inserted out on the network edge in order to lower data transport time and increase availability. Edge computing places data acquisition and control functions, storage of high bandwidth content, and applications closer to the end user. This white paper explains the drivers of edge computing and explores the various types of edge computing available.

Read More

 

 

Tools for the Trade

  • Prev
  IDEAL Industries has introduced Combination Drill Taps to its tool lineup. Combining the ...
  Stripping and crimping device, 100 - 240 V input voltage, for insulated ferrules with a ...
Professional all-in-one cutter/stripper for coaxial and twisted pair cables     ...
  Klein Tools' Coax Explorrer 2 tests coaxial cable and maps up to 4 locations   ...
  Ideal Industries' T-14 wire stripper s are ideal for all professionals working within the ...
  The ATS850 conveyor eliminates all types of electro static discharge requirements. ...
  Lorik Tool & Automation has the experience and ability to manufacture a variety of ...
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...

Project DotWhether sitting in a second-floor meeting space, or entering the lobby, it’s impossible not to notice the playful lighting fixtures at Dot Foods, Inc. At night, even passers-by can enjoy the circular fixtures that are visible through the two-storey pane glass windows of its Mt. Sterling, Illinois location.

Dot Foods is the largest food industry redistributor in the U.S. and has been expanding and renovating throughout its headquarters over a couple of years. The main lobby area is the latest to get an upgrade, and as the first point of contact for many entering the facility it had to leave an instant impression.

 

 

Read More

 

Product News

  • Prev
One of the core requirements of flexible production is the ability to quickly install machines and ...
EarthTronics introduces its new Slim LED Recessed Downlight Series designed for energy efficiency ...
Luminaire manufacturers’ efforts to deliver consistent, quality light across their luminaire ...
Cree Lighting, a company of IDEAL INDUSTRIES, recently announced the availability of its new Stylus ...
Weidmuller has launched its new INSTA-POWER product series. The single phased, primary switching ...
Ocal PVC-coated conduit and fittings represent a complete corrosion protection package for your ...
The new 60 Watt LED Work Light is ideal for any construction site or environment in need ...
EcoGen's Flexible Neon Series is suitable for both exterior and interior applications on ...
Create fresh luminaire forms, geometric or organic patterns, distinctive angles and intersections ...
Toshiba International Corporation has successfully secured a patent for the design of ...

 

Strip LightsEcoGen's Flexible Neon Series is suitable for both exterior and interior applications on residential or commercial buildings. The use of LED supposed to lights is quickly rising in terms of building design on a global level. These simple lights are more efficient, greater and are easy to install. When it comes to LED Flexible Strip lighting, you have a number of different options available and when it  comes to the time to decide, which one is best for you, there are different things that should be considered.

 

 

 

Read More

 

 

Peers & Profiles

  • Prev
Ouellet Electric Heating began humbly in 1960 with Charles-Emile Ouellet, who started manufacturing ...
Justin Harris is a Programmer/Electrician for COREngineering, a New Brunswick based mechanical ...
Bill Maki is an Electrical Engineer from Thunder Bay, Ontario working as a Control Systems ...
Benedict Electrical Contracting Limited is a locally owned and operated family business in Owen ...
Spark Power Corp. is one of North America’s leading independent providers of integrated ...
Marcia Ranger is a master construction and maintenance electrician, as well as a college professor ...
Con’s Electric Company Limited was established in 1985. Based in Timmins Ontario, only 700 ...
Mark Unsworth is an electrical engineer with over 35 years of experience in project management, ...
Manygo Ho is an electrical designer with AECOM’s Buildings and Places group. Manygo designs ...
Don Neigel is Manager of the CSA-certified panel shop at Delta, BC’s Optimil Machinery. ...

Copper $US Dollar price per pound

Electrical Industry Newsweek

This special weekly newsletter has the broadest reach of those that are involved in all aspects of the electrical industry including electrical construction and maintenance professionals and electrical specifying engineers across Canada. EIN is designed to provide electrical professionals’ insight and intelligence on those developments in the industry that effect design, specification, installation of electrical equipment. From corporate news to new technologies and insightful opinions EIN will become your first read in the electrical industry in Canada. Published weekly – every Tuesday
Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2019 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil