EFC’s Distribution Transformer Business Section Members Announce That The Ontario Ministry of Energy is Proposing to Amend O. Reg 509/18

EFCLogo 400x275

August 18, 2022

After several meetings with EFC’s Distribution Transformer Business Section members, including a recent meeting that included representation from members of the Utilities Standard Forum (USF), EFC is pleased to announce the Ontario Ministry of Energy is proposing to amend O.Reg 509/18.

EFC received the following communication:

“The Ontario Ministry of Energy is proposing to amend Ontario’s Energy and Water Efficiency Regulation (O. Reg. 509/18 under the Electricity Act, 1998) with changes affecting 18 products, including liquid-filled distribution transformers. Currently, O.Reg. 509/18 requires that liquid-filled distribution transformers sold in Ontario and manufactured prior to January 1, 2023 meet efficiency minimums specified in CSA C802.1-13, Minimum efficiency values for liquid-filled distribution transformers, while those manufactured on or after January 1, 2023 must meet efficiency requirements specified by the United States Department of Energy (DOE) (see Schedule 6, paragraphs 7 and 8 in O.Reg. 509/18 for these requirements).

In response to concerns raised through Electro-Federation Canada about industry and local distribution companies not being able to prepare for this change due to ongoing supply chain issues and delays in transformer shipments, we are proposing in this amendment to continue to allow manufacturers to meet the existing C802.1-13 requirements as an alternative compliance option. However, we are proposing to do that by adopting an ambulatory reference to the CSA standard in the regulation, so that any future changes to the standard are automatically incorporated into O.Reg. 509/18 requirements. In addition, the Proposal will provide additional flexibility for manufacturers who are already meeting DOE standards, so they will also meet Ontario’s requirements.”

On August 10, 2022, the Proposal to amend O.Reg. 509/18 was posted on the Environmental Registry of Ontario (ERO) and Regulatory Registry (RR) for a 45-day public review period (see Proposal to amend O.Reg. 509/18 under the Electricity Act, 1998 (“Efficiency Regulation”) | Environmental Registry of Ontario). EFC will be submitting comments as advised by the members of our Wire & Cable section.  

Source

Related Articles


Latest Articles

  • The Inaugural EFC Award of Excellence Presented to Keith Rodel, Hubbell Canada

    The Inaugural EFC Award of Excellence Presented to Keith Rodel, Hubbell Canada

    November 29, 2022 On November 10, 2022, Keith Rodel, from Hubbell Canada, was presented with the first EFC Award of Excellence. This award is a peer recognition to a retired member of the Electro-Federation of Canada who has made an outstanding contribution to the industry in standards and regulations. Hubbell Canada’s Frank Magisano, Director of… Read More…

  • New Report Explores Proven Practices for Building a Circular Economy in Canada

    New Report Explores Proven Practices for Building a Circular Economy in Canada

    November 29, 2022 Canada ranks among the top waste-producing countries around the world.By 2050, annual global waste generation is projected to grow by 70 per cent and consumption demands are estimated to require the resources of three Earths. CSA Public Policy Centre‘s new report, Rounding the Corner: Towards a Circular Economy in Canada, highlights how transitioning to… Read More…

  • Agents of Change: Bridging the Gap Between Talk and Action

    Agents of Change: Bridging the Gap Between Talk and Action

    This article is a summary of EHRC’s Agents of Change panel, Bridging the Gap Between Talk and Action. The annual event hosted by EHRC at the Toronto Reference Library is a two-day event designed to promote diversity, equity, and inclusion in the electricity industry. Read More…

  • Recap from EFC’s12th Annual Future Forum

    Recap from EFC’s12th Annual Future Forum

    November 25, 2022 On November 17, 2022, Electro-Federation Canada (EFC) virtually organized the 12th Annual Future Forum themed “Innovation During Disruptive Times: Finding the crossroads between talent and technology,” together with the 9th Annual Marketing Awards Presentation: Celebrating Innovation Excellence. This year, over 100 members experienced a reformatted program that brought together marketing and supply… Read More…


Changing Scene

  • IBEW President Lonnie R. Stephenson Retires, Kenneth W. Cooper Named New President

    IBEW President Lonnie R. Stephenson Retires, Kenneth W. Cooper Named New President

    November 29, 2022 International Brotherhood of Electrical Workers President Lonnie R. Stephenson is retiring, effective Jan. 4, bringing an end to a nearly five-decade active career in the union. “It’s been the honor of my life to serve the members of the greatest union in the world and advance the cause of trade unionism in… Read More…

  • Eddy Group Announce Branch Manage for New Charlottetown Branch

    Eddy Group Announce Branch Manage for New Charlottetown Branch

    November 25, 2022 Eddy Group Limited has announced Emily VanToever as the Branch Manager at their new location in Charlottetown, PEI, which is scheduled to open in early 2023. Emily begins her new position on Monday, November 21, 2022, and will report to Richard Barker, Corporate Sales Manager. “Emily comes to Eddy Group Ltd. from… Read More…

  • IDEAL Virtual Electrician Experience

    IDEAL Virtual Electrician Experience

    November 25, 2022 The IDEAL Virtual Electrician Experience (IVEE) is a free interactive virtual reality app that’s perfect for people who want to learn more about the electrical industry. The app for Oculous Meta Quest 2 headsets gives you a virtual, hands-on look at what it takes to be an electrician. Go HERE for more information Read More…

  • BJ Electric Supplies Announces Retirement of Kevin Gutsch

    BJ Electric Supplies Announces Retirement of Kevin Gutsch

    November 25, 2022 BJ Electric Supplies has announced the retirement of a member of its executive team, Kevin Gutsch, Vice-President of Operations, on or before November 30th, 2022. “Kevin began his career with BJ Electric Supplies on November 20, 1979. His first position was picking orders as a warehouse worker. After enthusiastically taking on whatever… Read More…