Working among the electrical components in an enclosure comes with inherent risks. The power in any one enclosure can range from 2kw up to 200kw depending on the power density. One of the most common and dangerous risks is an arc flash (or flashover).

When an explosive release of energy erupts from a phase-to-phase or phase-to-ground arc fault, the results range from devastating to deadly. This air to ground electrical explosion is a critical concern.

The destructive force of an arc flash

The dangers from an arc flash are all too well known. When metal expands and vaporizes at the fault, it causes extreme heating of the air, upwards of 10,000°C/18,032°F. The concussive pressure wave can knock personnel off their feet; the ultraviolet light flash can cause blindness; the sound blast, deafness; and the molten metal and heat can cause second and third degree burns. The specific death toll has been estimated to be up to 1-2 people every day worldwide.

An arc flash can result from unsafe work procedures, accidental contact, or more systemic problems such as corrosion of components and connections or insulation failure. Arc flash prevention should be incorporated into any application from the beginning of the design process.

Minimizing arc flash exposure

Design and retrofit approaches can limit exposure by using components installed outside the enclosure to permit qualified personnel in personal protective equipment (PPE) to service equipment inside without opening the enclosure door. Interface flaps and window kits permit data retrieval, equipment monitoring or routine maintenance to be performed from outside. Collapsible fold down shelves be raised for use with laptops and monitoring equipment. External data pockets can hold wiring diagrams, operation manuals and other documents.

Arc flash protection

Sometimes components must be accessed from inside the enclosure. For example, Rittal’s arc flash solution keeps high and low voltage equipment within the confines of their own respective enclosures. Low voltage enclosures house equipment that is used for programming, data acquisition and system adjustment.

High voltage components are isolated within their own disconnect enclosure, while line side power is segregated within the power isolation enclosure. A partition wall acts as a barrier to high voltage line side power. An interlocking door system ensures that the high voltage enclosure cannot be opened while the disconnect switch is in “ON” position.

For additional safety, all interlocked doors and master door must be closed in order to re-energize the enclosure. This removes potential for accidental contact with the inline power when the disconnect enclosure is put in a safe power-off position, and locked and tagged out.

Minimizing exposure to line side power can help protect personnel from accidents. A qualified person wearing PPE and following appropriate safe work practices can perform visual inspections and tasks, such as diagnosis, testing, troubleshooting and voltage measurement with the door open even when the main enclosure is energized.

Safety is always your priority, so download Rittal’s Arc Flash and How to Prevent it free whitepaper for the first step towards arc flash prevention: http://info.rittalenclosures.com/arch-flash-lp-0.

Steve Sullivan is a training manager with Rittal. This article was first published online as a blog: http://blog.rittalenclosures.com/blog/author/steve-sullivan-training-manager.

 

Related Articles


Latest Articles


Changing Scene

  • Skills Ontario Supports Ontario’s Investments in Skilled Trades in Budget Announcement

    Skills Ontario Supports Ontario’s Investments in Skilled Trades in Budget Announcement

    March 28. 2024 As demand for skilled trades professionals rises, Skills Ontario is commending the government for continued investments in skilled trades and technology programing, working to address the shortfall and need to build the workforce of the future in Ontario.  The skilled trades shortage is costing Ontario approximately $25 billion in foregone GDP. A… Read More…

  • IVRY Launches 7 New VR Lessons

    IVRY Launches 7 New VR Lessons

     IVRY Technologies, a division of IDEAL Electrical, is launching seven new virtual reality (VR) lessons in Canada as part of its Virtual Electrical Training (VET) Series 2 training module. The cutting-edge training will serve as a learning resource for International Brotherhood of Electrical Workers (IBEW) training centers across Canada. Read More…

  • PEI Budget 2024 Signals Continued Focus on Healthcare, Housing and Affordability for all Islanders 

    PEI Budget 2024 Signals Continued Focus on Healthcare, Housing and Affordability for all Islanders 

    March 28, 2024 Hon. Jill Burridge, Minister of Finance, presented government’s 2024-25 operating budget to the legislative assembly, outlining $3.2 billion in investments for Prince Edward Island with a continued focus on healthcare, housing and affordability measures. “This budget signals where we’re headed as a province and shows Islanders where we will be making key… Read More…

  • BC’s Budget 2024 Prioritizes Actions for Low-Carbon Economy

    BC’s Budget 2024 Prioritizes Actions for Low-Carbon Economy

    March 28, 2024 Josie Osborne, Minister of Energy, Mines and Low Carbon Innovation, and Brittny Anderson, MLA for Nelson-Creston, met with community climate leaders in Nelson to discuss how Budget 2024 can help support people in the region to transition to a low-carbon economy and meet shared CleanBC goals. “Our government’s budget this year reflects the… Read More…