Canadian Electrical Industry News Week

 

Canadian Electrical CodeJune 12, 2017

By William (Bill) Burr

In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and Life Safety Systems. The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.


Rule 46-000 Scope states that Section 46 is a supplementary or amendatory section of the code and applies to the installation, operation and maintenance of emergency power supply and unit equipment intended to provide power to life safety systems, exit signs, and illumination of exit signs in the event of failure of the normal power supply in cooperation with the requirements of the National Building Code of Canada. Appendix B and the CSA CEC Handbook provide additional explanations and diagrams.


Rule 46-002 provides some special terminology for this section and defines emergency power supply, life safety systems and unit equipment in accordance with the terms in the National Building Code of Canada.


The section is divided into 4 parts:

• general rules, which applies to all emergency power supplies and unit equipment
• emergency power supplies
• unit equipment
• exit signs


General


Rule 46-100 specifies that an emergency power supply, including unit equipment, must have adequate capacity for all the equipment that is connected to it in case of a normal power failure.
Rule 46-102 requires that complete instructions for operation, care and monthly testing be posted, under glass, and on the premises, in conformance with the National Building Code of Canada.
Rule 46-104 states that, where batteries are used as the emergency power supply, they must be maintained in proper condition and fully charged.
Rule 46-106 specifies that emergency lights must be on a dedicated emergency circuit, with no other lamps connected to it, and need to be arranged so that the area covered is illuminated even if any one lamp fails.
Rule 46-108 outlines the wiring method for all conductors, with a few exceptions as noted below, required for life safety systems, emergency power supplies, exit signs, and between unit equipment and remote lamps. In addition to the methods outlined in this rule, the National Building Code of Canada or provincial building codes must be referenced for additional requirements for fire protection of conductors that may apply. For additional information see Appendix B and G.

These methods include:
• metal raceway of the totally enclosed type
• cable having a metal armour or sheath
• rigid non-metallic conduit
• electrical non-metallic tubing imbedded in at least 50mm of poured concrete or masonry

Exceptions to this rule include:
• conductors installed in buildings of combustible construction where rules 12-506 to 12-520 apply and may be run as NMSC or in totally enclosed non-metallic raceway
• use of flexible cord and attachment plug for unit equipment in accordance with Rule 46-304(3)
In addition, the above noted conductors must be kept separate from all other conductors and equipment, with the exception of transfer switches and exit and emergency lights with two sources of supply. Also, the supply for any other electrical equipment that is not part of the “life safety system” must not enter any busway, splitter, or other enclosure that is part of the emergency power supply as per rule 46-208.
Emergency power supply
Rule 46-200 notes that Rules 46-202 to 46-212 apply only to central standby power sourced emergency power supplies.

Rule 46-202 outlines that emergency power supplies, in conformance with the National Building Code of Canada, must consist of:
• an automatically rechargeable storage battery with sufficient capacity to maintain at least 91% of full load voltage for a minimum of 30 minutes, or
• an automatically and failure-free starting and transferring generator conforming to CSA C282 with sufficient capacity to carry the full load of the emergency power supply

Note that where storage batteries are used they should not be automobile or lead acid batteries unless they are of the totally enclosed glass-jar type, except by special permission granted under rule 2-030.
Rule 46-204 reaffirms that all power, control and communication conductors required for emergency power supply and installed outside the generator room, must, as per the requirements of the National Building Code of Canada, be protected against fire exposure to maintain continued operation.

Rule 46-206 specifies that an automatic transfer switch, solely accessible to authorized persons, that actuates upon failure of the normal power supply, must control the emergency power supply. Where an area is adequately illuminated by daylight and artificial light is only needed at night, an automatic light-actuated device may be used to control emergency illumination separately in this area.

Rule 46-208 requires that the overcurrent protection for an emergency power supply needs to be coordinated with OC devices, for feeders and circuits supplying life safety and other emergency power supply equipment, to provide selective operation in the event of a fault. These overcurrent devices must be accessible to authorized persons only.

Rule 46-210 outlines that all emergency power supplies need to be equipped with audible and visual trouble signal devices that
• warn of the normal source current failure
• indicate exit signs or life safety systems are supplied from the emergency power supply
• are wired so that they can be silenced, but continually show a red warning or trouble light
• when the system is returned to normal, continue to audibly indicate the need to restore or automatically reset the silencing switch to normal

Rule 46-212 specifies that remote lamps, located some distance from the power supply, must have a voltage drop limited to 5% of applied voltage.

Unit equipment
Rule 46-300 outlines that Rules 46-302 to 46-306 apply to unit equipment for emergency lighting only, as defined in Appendix B.
Rule 46-302 requires the bottom enclosure of unit equipment to be mounted at least 2 meters above the floor where practicable. Note that the definition of practicable includes the synonym “feasible”.

Rule 46-304 specifies the requirements that the supply connections for unit equipment include:
• permanent connection, if the voltage exceeds 250 volts or 24 amps
• flexible cord and attachment plug located 2.5 metres above the floor and within 1.5 metres of the unit equipment, where the ratings above are not exceeded
• automatic actuation upon failure of the normal lighting power supply to the area covered
Rule 46-306 provides the requirements for remote lamps to unit equipment and requires that
• the voltage drop of conductors be limited to 5% of the marked output voltage of the unit equipment
• remote lamps be included in the list of lamps provided for that unit
• the number of lamps connected to a single unit not exceed the power output rating of the unit for the duration of the emergency period
Exit signs

Rule 46-400 requires that exit signs be
• connected to a dedicated circuit, except where connected to a circuit supplying emergency lighting in the same area
• illuminated by an emergency power supply, where emergency lighting is required by the National Building Code of Canada. Note that the NBC requires that exit signs be illuminated continuously, so no switch, time clock, or other disconnecting means may be inserted in the circuit


In the next instalment, we will be discussing Section 50 — Diagnostic Imaging Installations. (Note: Sections 48 and 50 have been deleted in the 23rd Edition)
* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA
** Note the CEC Handbook is also published by CSA.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

 

Grimard is more competitive and produces estimates 3X faster with Procore

Procore

When the pandemic lockdowns started in March of 2020, Grimard (an electrical contractor) had to decide whether to shut down its operations entirely or implement a new platform with people who were now freely available for work.

Once they implemented Procore, they found a way to efficiently communicate with stakeholders and offer full transparency in terms of project costs and planning. It also allowed Grimard to utilize historical data to make project estimates more accurate. Grimard was able to streamline its bidding process, which made it more attractive to potential clients and helped the business grow.

 

Read More


2021 Canadian Electrical Code Overview of Changes

EIN CSA Group Logo 2022 400CSA C22.1:21, Canadian Electrical Code, Part I contains many updates and changes that are potentially significant to electrical professionals. This online, self-guided course provides the key changes and impacts to the industry presented in an easy-to-follow format.

 Designed for professionals with a good working knowledge of the Code and who solely need the key changes including general updates or those made for clarification, safety, and new products and systems. Key changes due to Rule relocation or deletion are also noted.

This course may help save valuable time to help keep electrical projects safe and in compliance. This training is developed with input from a broad cross-section of electrical industry experts and with cooperation from all provinces, territories and several key jurisdictions across Canada. 

Read More


Changing Scene

  • Prev
Schneider Electric has announced the appointment of Frederick Morency as Vice President, ...
Canada announced an investment of nearly $15.5 million from the federal government for ...
Liteline are very excited to announce that Liteline Corporation has acquired Contraste Lighting. ...
E.B. Horsman & Son (EBH) has announced their Victoria branch has moved to a new location as ...
Canada’s Building Trades Unions has been selected as an intermediary for the Apprenticeship Service ...
More skilled trades workers can seek certification in Nova Scotia with changes the Province is ...
Procore Technologies, Inc. has announced it is working with Amazon Web Services (AWS) to ...
The federal governemnt has officially launched a call for proposals (CFP) for the  ...
The Electrical Contractors Association of BC (ECABC) has announced the impending departure of ...
The Minister of Employment, Workforce Development and Disability Inclusion, Carla Qualtrough was at ...

Sponsored Content

Brady Product Spotlight: Grip, Grab and Identify

PB-BradyGrip-200.jpgTired of guessing a cable bundle’s identity? Deciphering handwritten wire markers? If you’ve got too much detective work, here’s a way to solve it: BradyGrip Print-on Hook Material featuring VELCRO Brand Hook.

It’s the EASY way to ID wire and cable bundles. Just print and place. In an instant, your toughest ID work is done. Thanks to a Brady and Velcro Companies partnership, this one-of-a-kind material sports a printable front and grippy back – just the right combo for challenging datacom, electrical, construction and medical jobs.

Learn More HERE


 

Yukon Canada

Communities across the North and Arctic are prioritizing cleaner, more reliable energy sources, as they continue to feel the impacts of climate change. By investing in renewable energy initiatives that support energy independence and economic development, we can keep our air cleaner and build resilient, healthy communities for everyone to call home, all while creating good-paying, sustainable jobs and lowering harmful greenhouse gas (GHG) emissions.

The Yukon is leading the country in its pursuit of cleaner energy and climate change initiatives. 

 

 

Read more


 

Linde

Linde announced it has inaugurated the world's first hydrogen refueling system for passenger trains in Bremervörde, Germany.

Linde’s hydrogen refueling system, which it built, owns and operates, will refuel 14 hydrogen-powered passenger trains, enabling each train to run for 1,000 km emission-free on a single refueling. It has a total capacity of around 1,600 kg of hydrogen per day, making it one of the largest hydrogen refueling systems ever built. Linde’s future-ready hydrogen refueling system has been designed and constructed with the ability to integrate future on-site green hydrogen generation. The new hydrogen trains will replace existing diesel-powered trains.

Read More

 


 

Chris Lane

The Continental Automated Buildings Association (CABA) Board is pleased to announce the appointment of Chris Lane of Johnson Controls to the CABA Board of Directors. As Director of Product Management for Building Automation System (BAS) products at Johnson Controls, Lane leads a team of product managers responsible for designing the strategy and direction for Johnson Controls’ global portfolio of BAS products. 

"I’m honored to have the opportunity to join CABA’s board and support their vision to empower connectivity among people, spaces and technology,” said Lane. 

 

Read More


 

Canadian Electrical Contractor Discussion Group: Can You Count the Deficiencies?

EIN CECD 400Have you ever been called to fix the work of a 'handyman'?

"Was supposedly done by a"certified ' electrician....told the homeowner that he got a $266 permit....no record at TSBC. Can you count the deficiencies?"

"There is a second panel change in the triplex also.......even more deficiencies. Think the guy was a glorified handyman. Ones not obvious: 240 BB heat hooked up 120....drier on 2p20....range on 2p50....water heater fed with 2c14 Bx on 2p15."

Go HERE to join the discussion

 


 

Latest Articles

  • Prev
ABB is investing US $13 million in its Installation Products Division Iberville manufacturing ...
The Canadian Apprenticeship Forum (CAF-FCA) and its partners – the Canadian Construction ...
The inaugural cohort of the Canadian Apprenticeship Forum’s (CAF-FCA) National Leadership Program ...
The Manitoba government invites the public to participate in the development of the Apprenticeship ...
Rule 70-000 notes that this is a supplementary or amendatory section of the code and applies to the ...
As Canada’s energy sector works towards a net-zero carbon economy, the passion and drive of the ...
The Government of Canada has announced the Call for Proposals for the Union Training and Innovation ...
Effective October 1, 2022 the Canadian Electrical Code, Part I, 25th Edition, Safety Standard for ...
The Canadian Apprenticeship Service (CAS) is a new Federal initiative where Small and Medium-sized ...
HellermannTyton announces HelaGuard Double-Slit Corrugated Conduit. The two-piece solution features ...

Grimard is more competitive and produces estimates 3X faster with Procore

Procore

When the pandemic lockdowns started in March of 2020, Grimard (an electrical contractor) had to decide whether to shut down its operations entirely or implement a new platform with people who were now freely available for work. Once they implemented Procore, they found a way to efficiently communicate with stakeholders and offer full transparency in terms of project costs and planning. It also allowed Grimard to utilize historical data to make project estimates more accurate. Grimard was able to streamline its bidding process, which made it more attractive to potential clients and helped the business grow.

Read More


 



 

HellermannTyton Double Slit Conduit

HellermannTyton announces HelaGuard Double-Slit Corrugated Conduit. The two-piece solution features one semi-circular tube that snaps over another to envelop a wire or cable bundle. This makes it possible to add flexible corrugated protection to wiring that is already connected on both ends.

Standard conduit requires installers to guide cabling into and through the length of tubing. That is less of an issue at the time of manufacture. But if the ends of the wire are soldered to a terminal or otherwise inaccessible, non-slit conduit – and even single-slit conduit – can be tedious or impossible to apply.

 

 

Read More


 

Greenlee Mobile Bending Table

By Blake Marchand

For the new Bending Table for Greenlee® 881 Series Benders, Greenlee Tools, Inc. set out to improve ergonomics and product security.  Previously, contractors usually had to disassemble their bender unit for relocation off the jobsite due to it being harder to secure on the jobsite. New anti-theft features incorporated into the bending table product design allowed the cart and its accessories to be more fully locked. 

This increases contractor productivity by helping reduce the need for tedious setup and tear down of the bender due to off-jobsite storage. Greenlee wanted to make the Mobile Bending Table as versatile as possible and intentionally designed it to fit through most 32” wide doors.  

Read More


 

Siemens PBSI Sept1 GIF fire test


DCC-11 EV Energy Management System

DCC-11, manufactured by Thermolec, is an energy management system designed to allow the connection of an EV charger to the main feeder of a panel without affecting the load calculation. 

HOW IT WORKS 

  1. DCC does a real-time reading of the total power consumption of a home or condo electrical panel;

  2. It detects when the total power consumption of the main circuit breaker exceeds 80% and temporarily de-energizes the charger.

 

 

Read More


 

 

Klein Tools Knee Pads

Klein Tools introduces Lightweight and Heavy Duty Knee Pad sleeves, both of which feature a compact design for all day comfort and protection.

Knee Pad Sleeves

  • Lightweight and Heavy Duty Knee Pad Sleeves can be worn under or over pants for all day wear.
  • Unique design keeps knee pads close to the body for a second-skin fit allowing for agility when working in tight spaces.
  • Lightweight, breathable mesh back to keep you cool and comfortable.
  • Elastic cuff with slip-resistant silicone helps knee pads stay in place.

 

Read More


 

 

Sponsored Content

Fire Protection for Lithium-ion Battery Energy Storage Systems

PB-1-LithiumIonBatteryEnergyStorage-200.jpg

Lithium-ion storage facilities contain high-energy batteries combined with highly flammable electrolytes. In addition, they are prone to quick ignition and explosion in a worst-case scenario. Such fires can have a significant financial impact on organizations. Rapid detection of electrolyte gas particles and extinguishing are the key to a successful fire protection concept. Since December 2019, Siemens has been offering a VdS-certified fire protection concept for stationary Li-ion battery storage systems.

Click HERE to learn more.


Peers & Profiles

  • Prev
Watt’s the Word is a recently launched Electrical Industry Podcast hosted by Zack Hartle and ...
Allana Kellett-Jamieson loves working in the electrical sector and is proud of the great focus ...
As the head of ABB Canada's electrification business unit, Éric Deschênes is no newcomer to the ...
Karen Pullen knows what it’s like to be the only woman on a construction site, and as a proud ...
As of February 2021, Martin Stephenson is the new President and CEO of Signify Canada.   ...
EngWorks was formed in 2004 as an electrical engineering and consulting firm by Allan Bozek, “After ...
Headquartered in Concord, Ontario, Mercury Lighting services national retail, ...
Among the recipients of the 2021 Clean50 Awards announced last month is Carolina Gallo, Vice ...
Sarah Silverstein is a principal with Liteline along side her two brothers Mark and Daniel. ...
As a 34-year-old female owner of an electrical contracting business, Danielle Gray may be unique. ...


sdgs poster 936 enBy Blake Marchand

With many organizations, governments and policymakers finding it challenging to implement the UN Sustainable Development Goals (UN SDGs) , CSA Group has developed a methodology for mapping CSA standards to UN Sustainability Goals (SDGs) aimed at demonstrating how organizations, governments and policymakers can use CSA standards as an effective tool in developing and implementing their SDG strategies. The methodology was developed as part of a research project initiated by CSA Group, completed in collaboration with University of Guelph, Niagara College and the Toronto Metropolitan University. To support the methodology, CSA Group also launched an interactive searchable database that allows standards users to quickly find out how and where CSA standards support specific UN SDG targets.

The 2030 Agenda for Sustainable Development was adopted by all UN member countries in 2015. The agenda includes 17 UN Sustainable Development Goals that aim to promote and provide strategies to improve health, education, inequality, and the economy while prioritizing climate change and the environment. 

Read More


 

EIN 21 TSBC EJTC 400Effective October 1, 2022 the Canadian Electrical Code, Part I, 25th Edition, Safety Standard for Electrical Installations, Canadian Standards Association Standard C22.1-21 is adopted as the BC Electrical Code. All electrical work that is subject to the BC Electrical Code must be in compliance with the updated edition effective November, 30, 2022. 

All code-related information bulletins and directives that have been issued to date remain in effect. All potentially impacted information bulletins and directives will be reviewed for consistency with the new code edition and revised if necessary. 

Read More


 

Copper $US Dollar price per pound

Kerrwil Publications Great Place to Work. Certified December 2019 - December 2020

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2022 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil