New Cementex Arc Rated Face Shields

EIN Cementex AFS 180 Face Shield

October 5, 2022

Cementex highlights the Cementex 17 Cal/cm2 Arc Rated Face Shield (AFS-180) with hard hat. The AFS-180 features a molded shape to provide minimal distortion with exceptional Visible Light Transfer (VLT). This face shield will be included in the Category 2 Contractor, UltraLite and Feature Series PPE kits. They are in stock and available to ship immediately.

Cementex Arc Rated Face Shields are made of durable polycarbonate with anti-fog and scratch resistant coatings. The long length, chin cup, and sides provide superior coverage and protection around energized equipment. The brow shield deflects impact of Arc Blast and the translucent sides and chin cup provide improved peripheral vision.

This face shield meets the requirements of: NFPA 70E, CSA Z462, ASTM F2178, ANSI Z87.1, ANSI Z89.1, and CSA Z94.1.

The AFS-180 Face Shield is available for purchase through Cementex distributors. For more information about Cementex’s industry-leading products, visit www.cementexusa.com or call 1-800-654-1292.

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene