Schneider Electric: New Micro Data CentreSolutions Respond to Processing Speed and Other Challenges

Micro Data Centre

Schneider Electrichas launcheda new micro data centre solution portfolio for customers who need to reduce latency and quickly add capacity while ensuring a secure and easy to manage environment. Delivered in a single enclosure, the benefits of the new micro data centre solutions include power, cooling and management software to support a self contained, secure computing environment.

“Through this new offer, Schneider Electric is addressing the latency, bandwidth and processing speed challenges customers are facing with the growth of connected devices and data applications,” says Dave Johnson, Senior Vice President, Data Centre Solutions, Schneider Electric. “We are already seeing the emergence of edge applications in retail and industrial applications, and we believe the need for edge computing will only grow as the Internet of Things expands into commercial applications.”

Schneider Electric’s micro data centre physical infrastructure solutions include the enclosure, uninterruptible power supply (UPS), power distribution, management software (DCIM), environmental monitoring, cooling and security – all tested, assembled, packaged and then shipped together in a factory environment.

Solutions include:
• SmartBunker SX: traditional for IT rooms
• SmartBunker CX: optimized for office environments
• SmartBunker FX: ruggedized for any environment
• SmartShelter: multi-rack, ruggedized for any environment

The company lists key solutions benefits as:
• simplified management
• high levels of security
• optimized installation and operating cost
• configured, delivered and installed in the shortest possible time
• reliability via standardization and factory testing

“Localized or micro data centers are a fact of life, but by applying a self-contained, scalable and remotely managed solution and process, CIOs can reduce costs, improve agility and introduce new levels of compliance and service continuity,” says David Cappuccio, vice president, distinguished analyst and chief of research for the Infrastructure teams at Gartner. “Creating micro data centres is something companies have done for years, but often in an ad-hoc manner. By partnering with vendors, and creating a consistent and standardized architecture, enterprises can regain control of these critical assets, and increase the ability to rapidly introduce site-specific services, while reducing risks and operational costs, and improving service levels.” (1)

The new micro data centre solutions are now available in North America and will release globally during 2015. Each solution has specific options available and can be customized upon request. Find out more:http://www.schneider-electric.us/en/solutions/system/s4/data-center-and-network-systems-micro-data-center/.

(1)Gartner, “Apply a Self-Contained Solution to Micro Data Centres”, David Cappuccio, 26 January 2015. Document #G00268769.

 

Related Articles


Latest Articles

  • EFC: The Voice of Standards and Code Development

    EFC: The Voice of Standards and Code Development

    July 30, 2025 By Electro-Federation Canada Electro-Federation Canada (EFC) plays a vital role in shaping the regulatory and technical landscape of Canada’s electrical and automation sectors. Through active participation on key strategic and technical committees, EFC represents the collective interests of its members and ensures that the development of standards and codes is informed by… Read More…

  • Bold, Programmable Lighting Upgrade Helps Draw Visitors to Chinook Centre in Calgary

    Bold, Programmable Lighting Upgrade Helps Draw Visitors to Chinook Centre in Calgary

    July 30, 2025 Chinook Centre Can Now Brightly Celebrate Local Events, Holidays & Causes with New Thematic Exterior LED Lighting  The CF Chinook Centre (more commonly known as Chinook Centre) was always destined to be a major destination point for Calgary. Opened in 1965, it is conveniently located near the city center and is only 20 minutes from… Read More…

  • Electrical Devices GFCI Safety Outlet Sold at Home Hardware Recalled due to Fire Hazard

    Electrical Devices GFCI Safety Outlet Sold at Home Hardware Recalled due to Fire Hazard

    July 25, 2025 Product: Electrical Devices GFCI Safety Outlet sold at Home Hardware Issue: Consumer products – Fire hazard What to do: Immediately stop using the recalled products, contact Unison Ridge for instructions on how to uninstall and return them to any Home Hardware store for a refund. This recall involves three white coloured models… Read More…

  • Grounded in Ontario: Episode 18 – Meter Bases – Bonding, Safety, and Section 10 Changes

    Grounded in Ontario: Episode 18 – Meter Bases – Bonding, Safety, and Section 10 Changes

    July 24, 2025 ESA Technical Advisor, Trevor Tremblay, reveals how meter bases can go from  simple to seriously risky if installed incorrectly. As code enforcement around meter bases ramps up, contractors must stay sharp, read all rules carefully (especially those “notwithstanding” clauses), and double-check labeling. With the right education and planning, the transition can be… Read More…


Changing Scene

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…

  • Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    July 22, 2025 Building-Integrated Photovoltaics (BIPV) manufacturer, Mitrex proudly announces that its transformative SunRise Residential project in Edmonton, Alberta, has earned the Guinness World Record for the largest solar panel mural globally. This landmark project showcases Mitrex’s innovative BIPV solar panels, blending cutting-edge solar technology with vibrant cultural artistry to redefine sustainable architecture. Sustainable Architecture with BIPV Spanning over 30,000 square feet, the Mitrex eFacade PRO plus… Read More…

  • Nexans Unveils a Cable Made with 100% Recycled Materials

    Nexans Unveils a Cable Made with 100% Recycled Materials

    July 24, 2025 Nexans has reached a major milestone in its sustainability journey by developing a prototype cable made entirely from recycled materials — a first in the company’s history. This innovation combines technical performance, industrial feasibility, and a drastically reduced environmental footprint, marking a decisive step forward in circular economy. A cross-continental success story… Read More…

  • EFC Welcomes New Manufacturer Member: MGM Transformers

    EFC Welcomes New Manufacturer Member: MGM Transformers

    July 24, 2025 Since 1974, MGM Transformers has produced tough and trusted transformers designed to get the job done right. As a leading manufacturer, the company employs a highly experienced and dedicated engineering team that excels in custom designs. MGM Transformers is committed to excellent quality and service, offering industry-leading lead times and exceptional customer service. MGM Transformers specializes… Read More…