Eaton Exceeds Waste Reduction Goals

Eaton

Aug 20, 2018

Eaton has beaten its 2017 waste reduction goals by reducing its worldwide landfilled waste by 44%, keeping 1,098 metric tons of waste out of landfills.

As reported in a recently published sustainability report, 100 Eaton facilities worldwide have achieved zero waste-to-landfill milestone. This includes Eaton’s Mississauga, Ontario facility.
An Eaton facility is designated as a zero waste-to-landfill site when it consistently achieves a diversion rate of 98% through recycling, reuse, composting or incineration (when the heat generated is collected and used to create more energy than required for incineration).

In 2010, Eaton committed to reducing waste to landfill by 30%, indexed to sales, by 2015. The company significantly beat that goal through its zero waste-to-landfill program, which has engaged employees in sustainability and removed waste and greenhouse gases (GHG) from landfills in local communities. It also supports operational excellence and manufacturing efforts by focusing on redesigning processes to eliminate waste.

Eaton encourages its facilities to achieve zero waste-to-landfill as part of their waste management program and also as a means to reduce the release of GHG associated with landfills, especially methane, a GHG 20 times more potent than carbon dioxide.

Eaton facilities participating in zero waste-to-landfill

• emphasize source reduction by reducing the total amount of waste generated and, where possible, by removing waste streams entirely

• identify new suppliers, where possible, to divert remaining waste streams from a landfill. Zero-waste sites typically deploy a combination of recycling, re-use, composting and incineration (with energy recovery)

• engage employees to cultivate a culture where diverting waste from landfill is standard practice. Activities such as “dumpster dives,” suggestion boxes, games and prizes help to encourage participation

• capitalize on efficiencies of scale. Best practices are shared among sites in specific regions or with similar operations. In North America, for example, our waste management broker helps identify common solutions for all our sites in the region

Internal audits are conducted to ensure site compliance with the zero waste-to-landfill program benchmarks. Audits include validation of diversion rates, diversion methods and reported data.
All Eaton sites must manage waste responsibly in accordance with regulations and the company’s internal EHS Management (MESH) standards, including identifying all waste streams and creating waste minimization plans.

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric has announced the company has rebranded as Bernie’s Electric Supplies Ltd, a nod to their founder. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values that have guided the company for nearly 50 years. As we grow and evolve, this name Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…