Case Study: Social Housing Tenants Save 50% on Energy Consumption

EIN Bruce Mitsubishi Case study 400

 July 29, 2021

The Challenge

Located in Kincardine, Ontario, the Bruce County Housing Co-op is a government-owned social housing complex. It’s made up of sixteen similar townhouses each with two storeys plus a basement, most of which were still using the original, inefficient furnaces that were installed when the complex was built in the 1980s.

When the complex received a government grant to improve their infrastructure, they knew upgrading their heating would be a smart investment. Since the tenants pay their own hydro, an energy-efficient system was a must. As most of the units did not have air conditioning, it would be a bonus to have a system with cooling capabilities.

However, because AC would be an additional expense to the tenant, it was essential that the system be efficient in both heating and cooling. Other key factors to consider were a low initial capital cost, operating system cost, as well as a quick and simple retrofit.mr slim

The Solution

Mitsubishi Electric’s Zuba Central heat pumps because the equipment met the job specification as per the client’s requirement. Tony Ban, the Housing Facilities Manager for the Corporation of the County of Bruce, also confirmed that the two mechanical consultants said no HVAC system compares to Mitsubishi Electric.

“The existence of ductwork, combined with the costly electric furnace systems, made the Mitsubishi Electric Zuba Central Heat Pumps an attractive option” explains Tom Melanson, Territory Manager, Mits AirConditioning Inc. who worked on the successful bid for the project.

The Zuba Central system is the perfect solution for our cold Canadian climate. Performing best at low temperatures, it provides 80% of its rated heat at -25⁰C, meaning it operates superior to other central heat pumps. Thanks to this much heat being generated efficiently at low temperatures, the inefficient backup electric heaters will rarely be used, if at all. The Zuba Central also provides efficient cooling.

The Results

Retrofit times were very quick, with each heat pump taking only one day to install. This helped keep initial capital costs in check and minimized disruption and inconvenience for the tenants. Since the installation was approximately 18 months ago and a larger time period is needed to gauge the long-term results, limited data is available.

However, since units are individually metered it is possible to get an indication. Initial readings indicate a total energy consumption savings of about 50%. Ban conforms this, saying: “tenants love it — their hydro bills were decreased by more than 50%.”outdoor

Summary

Distributor

Mits Airconditioning Inc. Missisauga, Ontario

HVAC Contractor

Montgomery Industrial Services Wingham, Ontario

Location

Kincardine, Ontario

Location

Kincardine, Ontario

Industry

Residential

Size

Approx.1200 square feet/unit

Challenge

The government-owned social housing complex needed an energy-efficient modern upgrade to their existing heating solution – electric furnaces.

Selection Criteria

Energy Efficiency

Cost-effective up-front and in the long run

Quick and simple retrofit

Could fit into existing duct work

Air conditioning included

Design/Engineering Solution

Mitsubishi Electric Outdoor unit models: 16 x PUZ-HA36NHA (Zuba Central)

Mitsubishi Electric Indoor unit models: 16 x PVA-A36AA 16 x EH10-MPA-L 10kW (Electric Heater)

All Touchscreen Wi-Fi Thermostats

Results

50% reduction on heating bills, on average

Energy efficient models provided lower heating costs with a bonus of air conditioning

Seamless integration of models into homes.

This case study was publish with permission by Mitsubishi Electric 

Source

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…