Case Study: Social Housing Tenants Save 50% on Energy Consumption

EIN Bruce Mitsubishi Case study 400

 July 29, 2021

The Challenge

Located in Kincardine, Ontario, the Bruce County Housing Co-op is a government-owned social housing complex. It’s made up of sixteen similar townhouses each with two storeys plus a basement, most of which were still using the original, inefficient furnaces that were installed when the complex was built in the 1980s.

When the complex received a government grant to improve their infrastructure, they knew upgrading their heating would be a smart investment. Since the tenants pay their own hydro, an energy-efficient system was a must. As most of the units did not have air conditioning, it would be a bonus to have a system with cooling capabilities.

However, because AC would be an additional expense to the tenant, it was essential that the system be efficient in both heating and cooling. Other key factors to consider were a low initial capital cost, operating system cost, as well as a quick and simple retrofit.mr slim

The Solution

Mitsubishi Electric’s Zuba Central heat pumps because the equipment met the job specification as per the client’s requirement. Tony Ban, the Housing Facilities Manager for the Corporation of the County of Bruce, also confirmed that the two mechanical consultants said no HVAC system compares to Mitsubishi Electric.

“The existence of ductwork, combined with the costly electric furnace systems, made the Mitsubishi Electric Zuba Central Heat Pumps an attractive option” explains Tom Melanson, Territory Manager, Mits AirConditioning Inc. who worked on the successful bid for the project.

The Zuba Central system is the perfect solution for our cold Canadian climate. Performing best at low temperatures, it provides 80% of its rated heat at -25⁰C, meaning it operates superior to other central heat pumps. Thanks to this much heat being generated efficiently at low temperatures, the inefficient backup electric heaters will rarely be used, if at all. The Zuba Central also provides efficient cooling.

The Results

Retrofit times were very quick, with each heat pump taking only one day to install. This helped keep initial capital costs in check and minimized disruption and inconvenience for the tenants. Since the installation was approximately 18 months ago and a larger time period is needed to gauge the long-term results, limited data is available.

However, since units are individually metered it is possible to get an indication. Initial readings indicate a total energy consumption savings of about 50%. Ban conforms this, saying: “tenants love it — their hydro bills were decreased by more than 50%.”outdoor

Summary

Distributor

Mits Airconditioning Inc. Missisauga, Ontario

HVAC Contractor

Montgomery Industrial Services Wingham, Ontario

Location

Kincardine, Ontario

Location

Kincardine, Ontario

Industry

Residential

Size

Approx.1200 square feet/unit

Challenge

The government-owned social housing complex needed an energy-efficient modern upgrade to their existing heating solution – electric furnaces.

Selection Criteria

Energy Efficiency

Cost-effective up-front and in the long run

Quick and simple retrofit

Could fit into existing duct work

Air conditioning included

Design/Engineering Solution

Mitsubishi Electric Outdoor unit models: 16 x PUZ-HA36NHA (Zuba Central)

Mitsubishi Electric Indoor unit models: 16 x PVA-A36AA 16 x EH10-MPA-L 10kW (Electric Heater)

All Touchscreen Wi-Fi Thermostats

Results

50% reduction on heating bills, on average

Energy efficient models provided lower heating costs with a bonus of air conditioning

Seamless integration of models into homes.

This case study was publish with permission by Mitsubishi Electric 

Source

Related Articles


Latest Articles

  • Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    June 23, 2025 Virtual Training for Electricians (VET) is now available at many IBEW Canada Training Centres nationwide — and more are coming online soon! Whether your centre is already equipped or in the process of setting up, this is a game-changing opportunity you won’t want to miss. Need assistance? Contact the NETCO team. What… Read More…

  • Designing for Demand: The Role of Transformers in a Resilient EV Future

    Designing for Demand: The Role of Transformers in a Resilient EV Future

    June 23, 2025 Transformers in the EV Charging Boom: Are We Ready for the Load? As electric vehicles (EVs) continue their rapid rise, one question looms over the energy sector, municipalities, and developers alike: Is our infrastructure truly ready for the surge in demand? From city streets to highway rest stops, new EV chargers are… Read More…

  • The Time is Now: An Industrial Energy Efficiency Action Plan

    The Time is Now: An Industrial Energy Efficiency Action Plan

    June 23, 2025 In a whitepaper released on June third, ABB has set out the scale of the challenge facing the global industrial sector and emphasizes the critical role of industrial energy efficiency in meeting rising energy demand while strengthening energy security & affordability and driving industrial competitiveness. With 45% of the world’s electricity converted… Read More…

  • Multi-Family Construction Intentions Weigh Down Residential Sector

    Multi-Family Construction Intentions Weigh Down Residential Sector

    June 23, 2025 In April, the total value of building permits issued in Canada decreased by $829.6 million (-6.6%) to $11.7 billion. British Columbia (-$1.2 billion) led this decrease in construction intentions, which was mitigated by Ontario (+$299.3 million). On a constant dollar basis (2023=100), the total value of building permits issued in April fell by 6.6% from the previous… Read More…


Changing Scene

  • Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    June 23, 2025 In an effort to provide essential resources to individuals and families in need in the GTA, EFC members once again stepped up to support Haven on the Queensway, a community resource centre in Etobicoke, ON. Earlier this year, Haven secured a new, larger location nearby its existing facility to meet growing demand… Read More…

  • Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    June 23, 2025 Metalumen Manufacturing, Inc. is pleased to welcome NRG INTENSI-T as its new sales agency for the Quebec region. This partnership strengthens regional support and reflects a shared commitment to innovation and excellence. Since 1977, Metalumen has been designing, engineering, and manufacturing lighting products that blend functionality with design, offering luminaires tailored to… Read More…

  • IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    June 23, 2025 Conduit bending – one of the hardest skills for professional electricians to master – is now easier than ever to learn, thanks to a first-of-its kind partnership between BILT, an app that has revolutionized step-by-step interactive instructions for DIYers and IDEAL Electrical, a 108-year old manufacturer of electrical tools and supplies for professional electricians…. Read More…

  • Introducing the New WAGO App: Your Jobsite Sidekick

    Introducing the New WAGO App: Your Jobsite Sidekick

    WAGO at your fingertips — scan the QR to get the app now. Stay connected with WAGO wherever you go. Download the WAGO App to access product details, documentation, configuration tools, as well as local distributors — all from your mobile device. Scan the QR code to get started on the App Store or Google… Read More…