FLO Brings its Fastest Level 2 EV Charger to North America

EIN Flo Core MAX 400

March 24, 2022

As part of its participation in the National Automobile Dealership Association (NADA) annual trade show in Las Vegas, FLO is officially introducing the CoRe+ MAX charger, its fastest, most versatile level 2 EV charger destined for North American businesses.

Building on FLO’s best-selling commercial CoRe+ model, the CoRe+ MAX version offers the same clever versatility and customization up to 80 AMPs. It delivers a maximum power output of 19.2 kW, making it the most powerful level 2 charger available in the North American market.

“We strive to build the most robust and reliable chargers on the market because we know that our commercial and fleet customers depend on those features every day,” said Nathan Yang, Chief Product Officer at FLO. “Our original CoRe+ product has met the highest standards of dependability for years, thanks to its rugged design and capacity to withstand extreme weather conditions, making it a highly successful product in its own right. Now, we have created the Core+ MAX, which builds upon the very best features of its predecessor to offer even more impressive power and versatility.”

“We believe there is a growing need for adaptable commercial chargers given the broad array of EVs coming to market in the near future. Owners can limit the maximum available amperage to charge light duty electric vehicles and pick-up trucks during the day while later increasing capacity to charge larger vehicles, such as electric school buses, overnight. At a quarter of the cost of a typical DCFC charger, the CoRe+ MAX offers great value, while giving fleet operators a solution that will remain relevant for many years to come,” said Yang.

The CoRe+ MAX charger has been installed on a pilot basis in multiple locations in Canada and in the United States in the last 12 months and has already been adopted by established fleet managers. The product is also entirely compatible with other FLO chargers as part of networked installations. The CoRe+ MAX is currently in production for the Canadian market and items can already be ordered by site hosts wanting to build or expand their EV charging installations.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    May 1, 2026 CAF-FCA welcomes the federal government’s strong focus on skilled trades in the 2026 Spring Economic Update, including new investments in apprenticeship pathways, financial supports, and employer incentives. These measures reflect long standing priorities advanced by employers and partners across the country. The Canadian Apprenticeship Forum (CAF-FCA) welcomes the Government of Canada’s renewed Read More…

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…