Stanpro Easy Out SLG-2L

EIN Stanpro SLG 2L

September 1, 2022

The SLG-2L series for commercial applications features a plastic battery unit designed to provide an economical and versatile solution to emergency lighting needs, all in a compact size. The SLG-2L unit is configured with 6V dc and two LED lamps of 2W each, and offers over 4 hours of run time as a stand-alone unit.

  • 120/347 60 Hz VAC input, field selectable
  • High-efficiency, fast-recovery, precision-controlled charging system
  • Push Button Momentary Test Switch
  • Diagnostic/Driver LED for CA ENABLE and CHARGE
  • Fully automatic current-limited charger: line interlock, low voltage protection
  • Protection against voltage reductions and short circuits
  • Sealed lead acid battery, maintenance free
  • Standardized 20 gauge steel white powder coat finish
  • CSA logo meets C22.2 141-15 standards

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    May 1, 2026 CAF-FCA welcomes the federal government’s strong focus on skilled trades in the 2026 Spring Economic Update, including new investments in apprenticeship pathways, financial supports, and employer incentives. These measures reflect long standing priorities advanced by employers and partners across the country. The Canadian Apprenticeship Forum (CAF-FCA) welcomes the Government of Canada’s renewed Read More…

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…