FortisBC and Tyee Homes Achieve Net-Zero ready with Passive Solar and High-Efficiency Gas Equipment

December 12, 2022

An award-winning home builder, Tyee Homes, has set a new bar for energy efficiency in residential construction, completing a new development with a home that reached the highest level of the B.C. Energy Step Code. The home, located within a seven-unit duplex development in Kimberley, B.C., achieved Step 5, of the Energy Step Code by incorporating passive solar design, a high level of airtightness and high-efficiency natural gas combination space and water heating system. Information from a case study of this home, as well as similar case studies from across the province, will help inform how new homes can reach the higher step codes and help advance climate action goals.

“The Kimberley project will really help move us forward in understanding the best approaches for energy-efficient residential construction, especially given its location in one of B.C.’s colder regions,” said Tanya Rumak, program manager, conservation and energy management at FortisBC. “Continuing to improve the energy efficiency of new construction, along with the work we are doing to decarbonize the gas system, means that our customers have more options available in how to achieve climate reduction goals.”

Traditionally a custom home builder, this was one of Tyee Homes’ first builder development projects. With 18 years of experience building in the Kootenays, they’re interested in finding the most practical and cost-effective ways to meet the highest level of the Step Code. They got involved in the study by working closely with an energy advisor to incorporate passive solar design and a high-level of airtightness.

“We’re extremely passionate about providing quality energy-efficient homes for our customers,” said Carl Lauren, owner of Tyee Homes. “Many of our customers are looking for homes that are more environmentally friendly and less expensive to operate. They enjoy the comfort of natural gas for space and water heating, and like that the equipment can be used with renewable energy sources to help reduce greenhouse gas emissions.”

Tyee Homes focused on the building envelope first, using off-the-shelf products such as SIGA building wrap and tape to ensure high-levels of airtightness. To maximize results, they thoroughly inspect the air sealing before it is covered with rigid insulation and cladding. By using this approach, they achieved air tightness levels of approximately 0.7 air changes per hour, with the equivalent leakage area of approximately 5.2 inches by 5.2 inches, which is approximately the size of a half sheet of letter-sized paper. The leakage area can be compared to a window that is left open at all times–the smaller the area, the less heat will escape from the home. For comparison, the equivalent leakage area in a typical Step 3 home is approximately 12.5 inches by 12.5 inches.

In addition to incorporating combination boilers for space and water heating, the home features in-floor radiant heating on both levels – a standard for all Tyee Homes due to its high energy efficiency, ease of use and improved comfort. Moving forward, Tyee Homes plan to continue to work with an energy advisor to see what design modifications can be made to meet Step 5 in all of their units.

Through the combined efforts of passive solar design, improved building envelope and high-efficiency mechanical systems, the completed home was found to be 37 per cent more efficient than a typical new home. The home also achieved significant energy savings, using roughly a third of the gas of the average B.C. home annually. For homeowners looking to further decarbonize their home, Renewable Natural Gas1 is a low-carbon option that can be used with existing natural gas equipment.

FortisBC has long supported builders through financial incentives, mainly through its New Home Program. It’s continued to evolve the program to prepare builders to meet and exceed the B.C. Building Code requirements.

In addition to working with Tyee Homes, FortisBC completed six additional studies with builders in Campbell River, Quesnel, Maple Ridge and North Vancouver. Working together with builders has helped create a better understanding of the tactics needed to reduce the total energy requirements of new homes across different regions of the province.

The provincial government is targeting that by 2032, all new Part 9 residential buildings will achieve Step 5 and meet net-zero energy ready requirements. Read the full case studies to see how FortisBC is helping home builders achieve Step 5.

Source

Related Articles


Latest Articles

  • ESA Provides an Update on its New Self-Serve Licensing Platform

    ESA Provides an Update on its New Self-Serve Licensing Platform

    March 27, 2026 In October 2025 Electrical Safety Authority (ESA) officially launched its new self-serve licensing platform, a modern system designed to transform how Master Electricians (MEs) and Licensed Electrical Contractors (LECs) manage their licensing needs. The platform replaces paper-based processes and provides a centralized, web-based experience for renewing and applying for licences, paying fees Read More…

  • BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    March 27, 2026 Starting April 1, 2026, our battery rebate offer is changing. The offer will include: Applications submitted before April 1, 2026, will be reviewed under the current rebate amounts. New requirement for working with contractors Beginning June 1, 2026, solar and battery installations must be completed by a Home Performance Contractor Network (HPCN) member to Read More…

  • CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    March 27, 2026 Canadian electrical regulators have identified that the online sales of unapproved consumer electrical products are of a serious concern, and with the growing number of online marketplaces globally there is likely a higher volume of unapproved, or non-compliant, consumer electrical products available for purchase to Canadian consumers. In 2025, Canadian Standards Association Read More…

  • Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    March 27, 2026 By Electro-Federation Canada The rapid growth of e-commerce has transformed how Canadians purchase electrical products, but it has also introduced new safety risks. EFC members have been raising concerns for several years about the increasing availability of unsafe and unapproved electrical products sold online, often without clear evidence of certification or compliance with Canadian requirements. To Read More…


Changing Scene

  • Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    March 27, 2026 — Skills Ontario welcomes the 2026 Ontario Budget: A Plan to Protect Ontario, released today by the Ontario Government and Minister of Finance Peter Bethlenfalvy, and applauds the continued commitment to investing in skilled trades, technologies, and workforce development. Skills Ontario was pleased to see the government maintain and strengthen its support Read More…

  • Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    April 27, 2026 Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system. Smart load management systems continuously monitor total building energy Read More…

  • Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    March 25, 2026 Gescan, a Sonepar Company, is proud to highlight its continued commitment to supporting communities across Saskatchewan through their meaningful alliance with George Gordon Developments Ltd. (GGDL). With a strong focus on community development, workforce participation and inclusive growth, Gescan is working closely with GGDL to create training, employment and business opportunities for Saskatchewan residents. These efforts are particularly focused on supporting individuals Read More…

  • Electric Avenue Launches Incentive Program for EV Charging Installers

    Electric Avenue Launches Incentive Program for EV Charging Installers

    March 23, 2026 Halifax-based EV charging solutions provider Electric Avenue has announced the official launch of its new Contractor Incentive Program, a first-of-its-kind initiative in the EV charging industry, built exclusively for contractors who have completed the company’s Installer Certification course. The program rewards certified installers for every verified and networked installation they complete, offering cash Read More…