Single Phase AC Energy Meter for Level 1 and 2 EV Charging

September 28, 2023

Single Phase AC Energy Meter for Level 1 and 2 EV Charging
Carlo Gavazzi is pleased to announce the launch of our EM511 Series Single Phase Energy Meters, which are simple, intuitive, self-contained, easy-to-install, remotely accessible energy meters suitable for load balancing in EV charging or PV storage applications.

They are ideally designed for 1-phase energy metering for Level 1 and 2 EV charging applications.

The EM511 is a bidirectional 1-phase energy meter with a backlit 9-digit display. Its energy measurement is bi-directional, thus enabling the separate measurement of imported and generated energy, even in fiscal applications such as in vehicle-to-grid (V2G) technology.

The EM511 Energy Meters reduce commissioning time thanks to a quick setup procedure. In addition to energy meters, electrical variables, and total harmonic distortion, the EM511 provides useful information for the maintenance team, such as run-hour meters and total operating time.

The EM511 Series has been designed to meet the requirements of energy analysis in Industrial and Building automation energy efficiency applications, for MID fiscal cost sharing, cost allocation and power metering.

Main technical features include:
  • EM511: Class 1 (kWh) according to EN62053-21, class 2 (kVARh) according to EN62053-23
       – Class B (kWh) according to EN50470-3
       – Current inputs: direct connection up to 45 A
  • Instantaneous variables readout: (max 5+3) DGT, energy readout: 9 (6+3) DGT
  • Voltage inputs: 120 to 240 V with self-power supply
  • Current and voltage THD (up to 15th harmonic)
  • Energy measurements (imported/exported): total and partial kWh, kVARh, and kVAh
  • Run hour meters (relevant to both imported/exported energy: 8+2 DGT). Total operating time
  • Digital input for remote contact monitoring, tariff management, partial meter start/stop, or partial meter reset
  • Digital output (O1 version), or RS485 Modbus (S1 version) or M-Bus (M1 version)
  • Alarm management
  • Programmable display and slide show function
  • cULus approval; MID certification (PF version), Swiss MID certification (SF version)

The EM511 Series Energy Meters are available from Carlo Gavazzi’s network of sales offices and distributors across the Americas.

Source

Related Article

Two and Three-Phase Compact Power Supplies Available at Carlo Gavazzi

Carlo Gavazzi is pleased to announce the launch of our EM511 Series Single Phase Energy Meters, which are simple, intuitive, self-contained, easy-to-install, remotely accessible energy meters suitable for load balancing in EV charging or PV storage applications. They are ideally designed for 1-phase energy metering for Level 1 and 2 EV charging applications.

Related Articles


Latest Articles

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…


Changing Scene

  • Modernizing Canada’s Energy Efficiency Act to Improve Affordability and Competitiveness

    Modernizing Canada’s Energy Efficiency Act to Improve Affordability and Competitiveness

    December 8, 2025 Amendments to modernize the Energy Efficiency Act have been introduced in the Senate. First passed in 1992, the Act aims to reduce the overall energy consumption of energy-using products and allow consumers to make informed purchasing decisions. Since 1995, Canadian households, businesses and industries have saved over $110 billion as a result of regulations… Read More…

  • B.C.’s Economy Shows Resilience Despite Global Trade Volatility

    B.C.’s Economy Shows Resilience Despite Global Trade Volatility

    December 8, 2025 B.C.’s economy is expected to grow at a measured pace despite instability and uncertainty in the global economy. “Unjust and unpredictable trade policies have upended global relationships and shaken investor confidence across the world,” said Brenda Bailey, Minister of Finance. “We’re leaning into our strengths, like our natural resources and our skilled… Read More…

  • BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    December 8, 2025 As the BC Legislature wraps up the final week of the Fall session, BCCA is very pleased to see Bill 20 receive Royal Assent and officially become the Construction Prompt Payment Act, SBC 2025, c 24. This marks a significant milestone for BC’s construction sector. This achievement reflects decades of consistent, principled… Read More…

  • Federal Government Announces New Measures to Support Steel and Lumber

    Federal Government Announces New Measures to Support Steel and Lumber

    December 8, 2025 The world is changing rapidly. The United States, the world’s largest economy, is fundamentally reshaping all its trade relationships, causing major disruption and upheaval for Canadians. It is time to transform our economy from one that is reliant on a single trade partner to one that is stronger, more self-sufficient, and resilient… Read More…