BC Hydro Completes Construction of Interior to Lower Mainland Transmission Line

BC Hydro Line

BC Hydro’s new, high-voltage, Interior to Lower Mainland transmission line will deliver reliable power to BC’s major population centres. The 247 kilometre, 500 kilovolt power line stretches from Merritt to Coquitlam and will help bring power from where it is generated, on the Peace and Columbia rivers, to 3.2 million people on the Lower Mainland and Vancouver Island.

BC Hydro awarded the construction contract for the line in 2011 to Flatiron Graham Joint Venture, and construction began in the spring of 2012. The project includes 642 new transmission structures, as well as 500-kilovolt series capacitor station at Ruby Creek near Agassiz, and line termination work at Nicola and Meridian substations. In the process, it created more than 850 direct jobs over three and a half years of construction.

The new line was built through tough and diverse terrain in B.C.’s southern interior, crossing mountains, grasslands, major rivers, and highways.

“There haven’t been any major upgrades to our bulk transmission system in more than 30 years, and this new line is a vital link for the future,” says Bill Bennett, Minister of Energy and Mines. “Demand for power continues to grow and BC Hydro needs to be able to meet that demand and transport electricity safely and efficiently from the places like Mica generating station and the WAC Bennett dam, to major load centres.”

Jessica McDonald, President and CEO of BC Hydro, notes that BC Hydro has completed more than 550 infrastructure projects between fiscal 2011 and fiscal 2015. “Collectively, these projects were delivered more than $71 million under budget.” The final cost of the line is expected to be $743 million.

BC Hydro Line 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

In addition to the Interior to Lower Mainland transmission line, BC Hydro is reporting milestones for two other significant capital projects this year:

• The GM Shrum turbine replacement project at the WAC Bennett Dam was completed more than $100 million under budget. It involved refurbishing five generating units at the province’s largest facility, which will allow them to generate more power.

• The Mica 5 & 6 project will be completed later this year, within budget. BC Hydro is adding two new generating units at Mica. When the facility was built in the 1970s, it was built with four generating units and space for two more to be added in the future.

 

Related Articles


Latest Articles

  • Maximizing Excel: Practical Use Cases for Preconstruction

    Maximizing Excel: Practical Use Cases for Preconstruction

    November 8, 2024 By Melvin Newman Excel is a powerful and flexible tool that can enhance efficiency in electrical construction estimating.  Spreadsheets, like those in Excel, consist of a grid of “cells” where each cell can hold various types of data. Originating from mainframe computers in the 1960s and later developed for Apple computers in… Read More…

  • The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    November 4, 2024 The total value of building permits in Canada decreased by $858.1 million (-7.0%) to $11.5 billion in August, following a strong July during which construction intentions rose sharply (+20.8%). The residential and non-residential sectors contributed to the decrease in August. On a constant dollar basis (2017=100), the total value of building permits decreased 7.6% in… Read More…

  • A Slight Decrease in Residential Building Construction for August

    A Slight Decrease in Residential Building Construction for August

    November 4, 2024 Investment in building construction edged up 0.2% to $21.0 billion in August, after a 1.6% decrease in July. The residential sector edged down (-0.1%) to $14.6 billion, while the non-residential sector was up 1.0% to $6.4 billion. Year over year, investment in building construction grew 7.2% in August. On a constant dollar basis (2017=100), investment in building construction was… Read More…

  • When a Familiar Door Closes

    When a Familiar Door Closes

    November 4, 2024 By Keith Sones, seasoned utility industry executive Most of the articles I’ve written have been based on personal experiences, many of them occurring decades ago, which eventually translate into helpful life lessons. The years allow the events to marinate in a savoury stew of time and reflection, clarity never coming immediately, or even… Read More…


Changing Scene