Coventry University to Create Digital Building of the Future with Schneider Electric and Planon

DCS Schneider ecostrux 400

August 6, 2021

Coventry University has partnered with Schneider Electric, the leader in the digital transformation of energy management and automation, and Planon, the specialist in workplace management systems to upgrade its Engineering and Computing Building. The work will help to effectively future proof the building, improving sustainability, asset resilience and occupant experience, while reducing operational costs.

“One of our main goals is to move away from reactive work, instead resolving issues before they affect our staff and students,” commented Nasima Laming, Business Systems Support Officer, Coventry University. “Leveraging digital tools, we will monitor the condition of our campus plant and equipment proactively and get recommended actions, many of which we can automate for a smooth and seamless process. The additional aspects of course are the cost and energy savings we hope to benefit from.”

Coventry University selected Schneider Electric and Planon to help set and meet its specific requirements. The joint solution is another milestone in the partnership between Planon and Schneider Electric, which began in 2019. Leveraging the synergies between the two companies, it is the first project of its kind in the United Kingdom.

The solution involves the integration of two smart systems:

  • Planon’s Integrated Workplace Management System (IWMS), which enables Facility Managers to plan, execute and monitor all activities involved in reactive and planned preventative maintenance, space and move management, asset management, operational facility services, room reservations and other customer services.
  • Schneider Electric’s EcoStruxure Building Advisor, a suite of analytic monitoring services, that unlocks your Building Management System’s operational performance so you can remotely and proactively maintain your buildings. It provides key insights into your building operations by constantly monitoring systems and identifying faults to proactively address your building’s inefficiencies. As a result, there is an impact on operating costs, occupant comfort, and asset value.

The IWMS software automatically processes smart building diagnostics from Building Advisor to determine whether an action is needed. It can initiate a standardised workflow or highlight an issue for a manual decision by the facilities team by scheduling and dispatching the work to the field engineers’ mobile phones for execution.

Marcel Groenenboom, Planon CCO at Planon, added: “We always strive to provide the best possible solution to our customers and partners. By working with Schneider Electric and its smart building operating and analytics technology, we can bring new benefits to Coventry University. All three parties share a common vision on the role of digital technology and its contribution to creating safe, healthy, sustainable, and efficient data-driven buildings. We can’t wait to see the results at Coventry.”

“We are delighted to continue our collaboration with Planon and join forces to work on the project at CoventryUniversity,” said Kas Mohammed, UK&I Vice President of Digital Energy at Schneider Electric. “Buildings of the future must be sustainable, hyper-efficient, resilient, and people focused. The Covid-19 pandemic has added a new dimension to this shift: buildings must support resiliency and continuity . The university clearly understands the need to future-proof its buildings, as it strives to provide the best possible environment for occupants.”

Source

Related Articles


Latest Articles

  • Type 2 Chin Strap Hard Hats Required on More Job Sites

    Type 2 Chin Strap Hard Hats Required on More Job Sites

    November 17, 2025 Effective January 1, 2026, all personnel, including subcontractors and visitors to EllisDon and Bird Construction sites, the companies announced, must wear a CSA and/or ANSI Type 2 hard hat with manufacturer-approved integrated (four-point) chin strap, worn according to the specifications, properly adjusted and fastened. The hard hat Class must be appropriate for… Read More…

  • New Research on Smart Home Trends & Technology Adoption

    New Research on Smart Home Trends & Technology Adoption

    September 17, 2025 Sustainability and occupant well-being have become top priorities for smart home consumers, while AI-driven technologies continue to reshape expectations around comfort and convenience. These are among the findings from the latest research by the Association for Smarter Homes & Buildings (ASHB), conducted in collaboration with Harbor Research. The 2025 Smart Home Trends… Read More…

  • Empowering Ontario’s Electric Vehicle Infrastructure with Band-N-Go Solutions

    Empowering Ontario’s Electric Vehicle Infrastructure with Band-N-Go Solutions

    November 17, 2025 By Band-n-Go At Band-N-Go, we are at the forefront of supporting Ontario’s transition to electric vehicles (EVs) by supplying essential products to those enhancing the infrastructure needed for public charging stations. As the number of electric vehicles increases, so does the demand for accessible public charging options. We actively participate as a… Read More…

  • Winnipeg Information Bulletin on Solar Photovoltaic Installations

    Winnipeg Information Bulletin on Solar Photovoltaic Installations

    November 16, 2025 The City of Winnipeg has released a guide to solar photovoltaic (PV) installations and permit requirements for wall mounted, roof mounted and ground mounted installations for both housing and commercial applications. This bulletin attempts to address all scenarios however, solar PV system designs and equipment can vary greatly for each installation, so… Read More…


Changing Scene