Schneider Electric and the University of Birmingham Dubai Collaborate on Energy Efficient Data Centre at New Campus

Birmingham University

Sept 20, 2021

Students and academics at the University of Birmingham Dubai’s new campus are set to benefit from one of the UAE’s most advanced on-site data centres – a high-performance, highly energy efficient facility reflecting the University’s sustainability aspirations.

The data centre, which will create energy savings of up to fifteen percent while operating at peak performance, is built around Schneider Electric’s technology, and implemented by system integrator CDW. It is designed to be as energy efficient as possible and includes features such as remote management and performance benchmarking against thousands of other data centres worldwide. Connected to the University of Birmingham’s UK campus, the centre will allow rapid data exchange between the two sites.

The University of Birmingham Dubai’s new facilities have been designed as a ‘Smart Campus’, with technologies that enable innovative, multidisciplinary teaching and learning. Students and academics will benefit from WiFi6, the next generation of wireless connectivity, to support learning and research across the campus and between the UAE and the U.K.

The technology provided by Schneider Electric covers both hardware and software and includes Easy Metered Rack Power Distribution Units (Rack PDU) for real-time remote monitoring of power usage, as well as power management for connected loads. Uninterruptible Power Supply devices provide battery backup power in case of a sudden loss of electricity, and Easy Rack mounts simplify the data centre’s design and maintenance.

In addition, Schneider Electric’s EcoStruxure IT software provides a host of features to enhance the data centre’s operations – its team will be able to monitor, manage and optimize energy use across servers, cooling and electrical equipment either on-site or remotely. In-built cybersecurity will reduce the risk of a security breach by running vulnerability assessments on all devices within the data centre.

Thanks to EcoStruxure IT’s cloud-based analytics, data from the data centre’s infrastructure can be anonymously compared to thousands of other data centre sites, which will help operations better understand what they can do to improve the performance, efficiency and health of the equipment.

Professor David Sadler, Provost at the University of Birmingham Dubai commented: “Our new building has been designed as an ‘Smart Campus’ – embedded with flexible, cutting-edge technology allowing innovative, multidisciplinary teaching and learning. We aim to deliver a flexible and powerful teaching environment in Dubai that students and staff will enjoy.”

“In delivering an educational experience like no other in Dubai, we wanted to create a data centre that would be future-proof – supporting our goal of a tech-smart, energy-efficient campus. This data centre’s performance, efficiency and sustainability will create the platform upon which we will build out our IT systems. By working with CDW and Schneider Electric, our staff, students and academics can enjoy an excellent technology platform that will enhance their campus experience.”

Go HERE for more information.

Related Articles


Latest Articles


Changing Scene

  • Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    May 26, 2025 Siemens will invest CAD $150 million over five years to establish a Global AI Manufacturing Technologies Research and Development (R&D) Center for Battery Production in Canada. The new R&D center, located initially at Siemens Canada’s head office in Oakville, as well as in Toronto and Kitchener-Waterloo, Ontario, will focus on developing cutting-edge AI manufacturing technologies with an initial emphasis… Read More…

  • Honda Postponing Ontario EV Supply Chain Investment by Two Years

    Honda Postponing Ontario EV Supply Chain Investment by Two Years

    May 26, 2025 Honda is postponing its plan to invest in a comprehensive EV supply chain in Ontario. The CBC reported that the investment is being push back by two years. “Due to the recent slowdown of the EV market, Honda Motor has announced an approximate two-year postponement of the comprehensive value chain investment project in Canada…. Read More…

  • Serge Leblanc Named Sonepar Canada Interim President

    Serge Leblanc Named Sonepar Canada Interim President

    May 26, 2025 George McClean, former President of Sonepar Canada, has decided to leave Sonepar for an opportunity outside of the electrical industry. Serge Leblanc, current President of Lumen Canada, has been appointed interim President of Sonepar Canada. Leblanc will manage both responsibilities until a successor is named.  Leblanc joined Lumen in 1997 and has… Read More…

  • Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    May 26, 2025 On Monday, May 26, the Ontario Building and Construction Tradeswomen (OBCT), will host its first-ever Advocacy Day at Queen’s Park. Tradeswomen from across the province will gather to meet with Members of Provincial Parliament, including Minister of Labour David Piccini, to advocate for progress in the skilled trades for tradeswomen. OBCT’s top priorities include:… Read More…