BC SunMine Solar Facility Exceeds Expectations

SunMine

The 1.05 MW (megawatt) solar project is BC’s first grid-connected solar facility, as well as Canada’s largest project to use solar trackers. Production data since June 22 confirm that the energy being generated by the SunMine is exceeding the modelled design potential. SunMine is supplying enough electricity to the BC Hydro grid to power approximately 200 homes.

SunMine has 4,032 solar-cell modules, mounted on 96 solar trackers that follow the sun’s movement, maximizing solar exposure. It is BC’s largest solar project, Canada’s largest solar tracking facility, and the first solar project in BC to sell power to the BC Hydro grid.

The project is supported by Teck, which has provides land and site infrastructure, as well as a $2 million contribution. SunMine is located on Teck’s former Sullivan Mine Concentrator site, which has been fully reclaimed. BC’s Innovative Clean Energy (ICE) Fund program has provided $1 million for SunMine through the EcoSmart Foundation, a Vancouver-based non-profit foundation promoting economically and ecologically smart projects between public and private sectors.

“Innovative, private clean energy projects have helped power BC since the 1980s and are a cornerstone of BC’s energy policy,” says BC Energy and Mines Minister Bill Bennett. “The Sun Mine project has the potential to spur interest in development of other solar projects, bringing more jobs and economic benefits to communities across BC.”

Find out more: www.sunmine.ca.

 

 

Related Articles


Latest Articles

  • Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    By Luc Rodier, Chair of the Board of Electro-Federation Canada (EFC) The 2025 EFC Conference in Niagara was a landmark occasion—marking 30 years of innovation, collaboration, and collective progress in the Canadian electrical industry. Set against the symbolic backdrop of the Canadian-U.S. border, this year’s theme, Electrifying Connections, couldn’t have been more fitting. As President and… Read More…

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…


Changing Scene