5 Mistakes Electrical Contractors Repeatedly Make on Social Media

January 15, 2017 

Social media has become an integral part of our daily lives. It has also become a place for businesses to make connections, network and spread the word about anything they would like to share. Despite the unlimited potential social media marketing offers electrical contractors, only some of them use it. Even fewer use it properly.

Here are five mistakes electrical contractors repeatedly make on social media.

1. Not creating accounts on social media platforms

It’s incredibly difficult to create a presence on social media platforms when you don’t have an account. This should be a basic requirement of owning a business these days. Have Facebook, Twitter and LinkedIn accounts for your business.

Don’t expect the leads to come flowing in from just creating profiles, but be content with the fact that now people will be able to find you on social media should they search. They will no longer think you are out of business, incompetent or hiding from customer reviews.

2. Posting on social networks through other social networks

Please do NOT do this. Make sure your social platforms are NOT connected. You should not be posting Facebook posts on Twitter. Nor should you post Instagram photos on Facebook or Twitter.

Each social media platform has its own language, purpose and nuances. Each time you post on one of the platforms, cater your message to that specific audience that specific time.

3. Inconsistent posting

Would you expect results if you went to the gym, did one rep, then only went back to repeat that rep once or twice a year? How does posting once or twice a year seem like a sufficient effort?

This is not to discredit posting. Any and all posting is good and can help bring in a customer or job. However, being consistent (posting on each platform at least once a week) is critical to building a reputation as an expert in the industry. It will also once again show potential customers that you are still in business and actively doing quality work.

4. Not asking for reviews and testimonials

If you are a quality contractor, you have done some good work in your career. If you run a business, hopefully you have done good work recently and plan to do it again in the near future. Asking your customers for recommendations, reviews, testimonials, and referrals is free and will help give the social proof that will get more customers giving you a call.

After you get these positive thoughts, and getting permission from the authors themselves, make sure to share them with the world. Put them on your website, your social media platforms, on review websites, and wherever else you can. People trust people.

5. Not following enough other accounts

Part of getting your brand out there is by following the accounts of others. Follow customers, vendors, partners, local businesses, trade associations, industry media, trade schools, competitors, and whoever else you can. Someone on their end will see that you followed them, and may follow back to complete the connection.

It is also recommended that you write something to the business or organization you are following. Simply say “hello” or give them a compliment to get the relationship started on that social platform. Repeat this for every platform you connect on.

The five most common mistakes electrical contractors make on social media are all easily avoidable. Not following other accounts, ignoring the power or customer testimonials, inconsistent posting, social etiquette mistakes, and not existing on social platforms at all are all cardinal sins of social media.

This article was first published as a blog by CapitalTristate, an electrical distributor in the U.S. Mid Atlantic. Watch for the next article in this series: 5 Genius Ways Contractors Are Beating the Competition.

 

Related Articles


Latest Articles

  • Lighting Case Study: Metro Toronto Convention Centre

    Lighting Case Study: Metro Toronto Convention Centre

    September 27, 2024 Goal: Upgrade the outdated 350-450-Watt metal halide lighting technology at the Metro Toronto Convention Centre (MTCC) with high-performing, energy-efficient, long-lasting, and low-maintenance LED fixtures from LEDVANCE Products Installed: 1,431 200-Watt UFO High Bay Fixtures from LEDVANCE, which are ideal replacements for metal halide lighting Benefits: LEDVANCE LEDs slashed the MTCC’s previous lighting… Read More…

  • The Consulting Engineer’s Guide to Advanced Electric Boiler Technology

    The Consulting Engineer’s Guide to Advanced Electric Boiler Technology

    September 27, 2024 An international boiler expert helps industry professionals take advantage of high voltage electrode boilers’ virtually 100% efficient, zero-emission capabilities, providing guidance on selection and installation For consulting engineers tasked with planning, designing, and supervising construction projects for a wide range of industries, advanced electric boilers – particularly high voltage electrode boilers –… Read More…

  • Just Getting Started – Discussing Milwaukee’s 100 Year Anniversary with President of Milwaukee Tool Canada, John Myers

    Just Getting Started – Discussing Milwaukee’s 100 Year Anniversary with President of Milwaukee Tool Canada, John Myers

    September 23, 2024 By Blake Marchand It goes without saying that the Milwaukee brand is historic. Their longevity is a testament to company culture and innovation. As this year marks Milwaukee’s 100th anniversary, the company held a tree planting ceremony earlier in the year to mark the milestone, planting 100 trees in partnership with Tree… Read More…

  • ECABC Provides Platform Recommendations to BC Political Parties

    ECABC Provides Platform Recommendations to BC Political Parties

    September 23, 2024 The Electrical Contractors Association of British Columbia has provided three platform policy recommendations to each of BC’s major political parties in advance of the October 19, 2024 provincial election: implementing prompt payment legislation, increasing capital and operating funding to support electrical apprentices, and naming a Minister responsible for construction in their Cabinet…. Read More…


Changing Scene

  • NOARK Partners With Innovelec, to Power the Electrical Industry in Western Canada

    NOARK Partners With Innovelec, to Power the Electrical Industry in Western Canada

    September 26, 2024 INNOVELEC, a supplier of products and services for the electrical industry in Western Canada for over 25 years,  and NOARK Electric, global manufacturer of low-voltage electrical components for industrial applications, have partnered to electrify Western Canada. Specializing in motor controls and protection for Original Equipment Manufacturers, System Integrators and Panel Builders, Noark Electric… Read More…

  • Mitsubishi Electric Sales Canada Inc. and Efficiency Capital Partner to Cross Promote Low-Carbon Building Solutions in Canada

    Mitsubishi Electric Sales Canada Inc. and Efficiency Capital Partner to Cross Promote Low-Carbon Building Solutions in Canada

    September 23, 2024 Efficiency Capital (EC), Canada’s first Energy-as-a-Service (EaaS) company, and Mitsubishi Electric Sales Canada Inc. (MESCA) announced a strategic cross promotional partnership to make low-carbon building solutions more accessible to building owners and operators across Canada. Energy efficiency in buildings, despite being one of the critical pathways to meet Canada’s climate goals, faces… Read More…

  • Siemens to Carve out Electric Vehicle Charging Business to Enable next Level of Growth

    Siemens to Carve out Electric Vehicle Charging Business to Enable next Level of Growth

    September 23, 2024 Siemens has announced the intention to carve out its eMobility business. The company bundled its eMobility charging activities in 2018 and subsequently organized it into a separate business unit in 2022.  The carve out of Siemens eMobility, which has a strong technological core and portfolio, will give the business entrepreneurial freedom to… Read More…

  • FLO Confirms FLO Station Eligibility for ZEVIP Funding

    FLO Confirms FLO Station Eligibility for ZEVIP Funding

    September 24, 2024 Canada recently announced trade measures impacting vehicles from China and limiting eligibility under the Natural Resources Canada (NRCan) Zero Emission Vehicle Infrastructure Program (ZEVIP) to electric vehicle (EV) charging products manufactured in countries that have negotiated free trade agreements with Canada. Effective October 1, 2024, this directive is expected to have an impact on… Read More…