Establishing When the CE Code Becomes Mandatory

Electricians With Tools

 

Pierre McDonald

Safety requirements are constantly changing. We often see this with the new car ads that come out every model year with manufacturers claiming their vehicle is the safest in its class. Does the same hold true for electricalcodes and standards?Committees work under increasing pressure as a publication deadline approaches, only to finalize safety requirements in a revised document to be “put out there for use by the industry.” Some codes and standards have a history and are expected, while others are new and have yet to be accepted. In both cases these documents are put forward with the anticipation they will contribute to a safer environment.

In June 2015, the Canadian Advisory Council on Electrical Safety(CACES) met at its annual meeting. This council is an influential body regarding electrical safety, and comprises regulatory members representing every province and territory, as well as representatives of certification bodies, Inspection bodies and standard development organizations. They meet to discuss codes, standards, safety issues, and how they can all work together for a safer electrical industry. One of the summary discussions on the agenda was when the regulatory authorities anticipate the newly published Canadian Electrical Code (CE Code) might become a mandatory requirement within each of their jurisdictions.

The CE Code adoption process varies in each jurisdiction as the provinces and territories have the right to mandate electrical safety as they see fit. Some jurisdictions will adopt the CE Code as published while others amend certain requirements to fit their needs. Not only what is adopted differs from jurisdiction to jurisdiction,but the adoption process itself varies throughout Canada. Some jurisdictions have the CE Code automatically come into force after a fixed time has passed from the code publication date, while other jurisdictions consult with stakeholders and users prior to CE Code adoption. This process could vary from a few months to well over a year and perhaps longer, depending on government priorities at the time. Pressure is front and centre for national harmonization of standards and automatic adoption of codes.

With regard to equipment standards, these requirements are basically set through the Canadian Electrical Code Part II standards and those standards published by ULC Standards (see Appendix A of the 2015 CE Code). These standards ensure that equipment installed in conjunction with the CECode will be compatible and safe to use under the installation rules. The following table illustrates the adoption dates as to when the 2015 CE Code has become or will become adopted in the provincial and territorial jurisdictions in Canada. Jurisdictions that have already adopted the 2015 edition CE Code include the Yukon Territory, the Northwest Territory, Manitoba, Nova Scotia, and Newfoundland and Labrador. Others will follow over the next several months
Codes Table

(Note that certain Municipalities also adopt the CE Code outside of provincial legislation, e.g., St John’s, Winnipeg)

While it is anticipated that the CE Code will be adopted within the above time periods, provincial and territorial legislators always have the final decision. Legislative priorities change very quickly, which could result in substantial delays. Legislation is not an exact science;check with the authority having jurisdiction.

Additional information on the CE Code and other codes or standard requirements within each jurisdiction can be obtained by contacting the appropriate provincial or territorial authority.
For contact information on code authorities (building, fire, gas, plumbing, electrical and environmental) responsible for codes in Canada, please use the following link from the ULC website: http://canada.ul.com/codeauthorities/codeauthoritiesincanada/.

So, does the revision and subsequent adoption of electrical codes and standards always make for a safer electrical installation? While this is one piece of the puzzle, a safe installation requires that all puzzle pieces fit together as intended. From the work done by codes and standards committees through the manufacturers, testing and certification bodies, and Installers right down to the end users, electrical safety needs every part to fit together for a safe electrical environment.


Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Meeting National Building Code of Canada Requirements 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

 

Related Articles


Latest Articles

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Technical Safety BC Top 5 Safety Risks in 2025

    Technical Safety BC Top 5 Safety Risks in 2025

    July 31, 2026 Each year, Technical Safety BC measures the data they receive through incident and hazard reports to analyze and rank the top safety risks encountered across the province. These risks were identified by collecting, assessing, and analyzing incident investigation data. The key metrics they look at when ranking the top five safety risks… Read More…

  • World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    July 31, 2026 By Electro Federation Canada This World Youth Day, we are proud to recognize the positive impact EFC members continue to make through their support of Habitat Canada’s Youth Skills Building Program. Investing in the Next Generation of Talent Canada is experiencing a significant labour shortage that is delaying homebuilding, driving up costs,… Read More…

  • Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    July 31, 2026 Current carrying capacity means the maximum current that a cable can transmit over sustained periods without overheating. Exceeding the permitted current capacity can damage the cable’s insulation and, in the worst case, result in fire. What determines the current carrying capacity? Different parameters influence how much electricity a cable can safely transmit.… Read More…


Changing Scene

  • Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    August 5, 2026 Mac’s II Agencies is expanding its electrical portfolio across British Columbia and Yukon with five leading brands from Hubbell, enhancing our ability to support hazardous location and industrial project business with reliable, field proven solutions for demanding environments. From explosion proof distribution equipment and industrial lighting to the connectors, glands, and hardware that tie… Read More…

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…