EH2 Solar — A Small Business with Global Reach

March 22 2016

Laurence Rocher-Brassard

Located in Blainville, PQ, EH2 Solar offers turnkey solutions for different energy applications. The company offers competitive technologies in the domains of green energy and sustainable resource usage, such as biomass, solar, cooling and production of potable water. EH2 Solar also helps customers meet regulatory, environmental project and cost targets with platforms that increase energy efficiency.

For Stéphane Labelle, President of EH2 Solar, the goal is to make energy-efficient, environmentally friendly solutions at the best prices possible so that green technologies become more accessible for everyone and help reduce our dependence on fossil fuels.

Founded in 2006, this small company has developed technologies in collaboration with partners around the world. Among its achievements, the EH2 Solar team has developed a solar energy technology that provides power 24 hours a day, 7 days a week. EH2 Solar uses thermal storage and requires no batteries to provide power during the night. The technology involves solar concentration; the concentrators are light, solid and cost effective. According to Labelle, this technology is more effective and less expensive than other solar technologies on the market.

EH2 Solar team recently signed a contract to heat a community centre in Havre-aux-Maisons, in Quebec’s Magdalen Islands with its solar technology. According to media coverage, the community centre consumes 15,000 litres of fuel oil annually. This project could reduce the centre’s fuel oil consumption by half when it becomes operational in fall 2016. The Magdelen Islands are 100% dependent on fossil fuels for heating and electricity.

EH2 Solar has also developed an innovative cooling technology that involves desalinization. Developed with collaborators, a prototype can produce 2,500 litres of a desalinated ice and water mixture from seawater. This slush, or ice slurry, is transported into pipes and used to cool buildings, solar or thermal power plants, or any other process that requires cooling. Once the ice melts, it contains a salinity of less than 400 ppm, corresponding to standards for drinking water, and a maximum distribution of 500 ppm of salinity. Seawater contains an approximate salinity of 35,000 ppm. This cooling technology saves up to 82% of a building’s energy consumption, and produces drinking water as a byproduct.

Find out more about EH2 Solar: www.eh2solar.com/.


Laurence Rocher-BrossardLaurence Rocher-Brassard is the Editor of EIN’s sister publication: Le monde de l’électricité en ligne

More in EIN by Laurence Rocher-Brassard:

EFC Officially Launches the Young Professionals Network

Swati Patel: the Art of Success Outside Your Comfort Zone

Stephanie Santini: Never Underestimate Her Capabilities

Cynthia Renaud — the journey of a determined lighting specialist

 

Related Articles


Latest Articles

  • New STANDATA Interpretation & Variance: Use of Neutral Conductors in Consumer’s Service Reporting of Electrical Incidents

    New STANDATA Interpretation & Variance: Use of Neutral Conductors in Consumer’s Service Reporting of Electrical Incidents

    October 6, 2025 There are two new STANDATA releases for the province of Alberta: The purpose of these two releases is to clarify requirements for reporting electrical incidents in Alberta and to permit the use of underground service entrance cable (USEB) with a bare neutral conductor in underground installations at service entrance equipment. STANDATA variance… Read More…

  • BizEnergySaver Program Available in Toronto & Ottawa

    BizEnergySaver Program Available in Toronto & Ottawa

    October 6, 2025 Commercial buildings in Ottawa and Toronto’s Richview South area can receive direct installation and instant discounts on energy-saving equipment upgrades for lasting benefits. The Save on Energy BizEnergySaver program is designed to help industrial, commercial and institutional (ICI), and multi-residential building owners and operators make equipment improvements to reduce their energy consumption…. Read More…

  • Electrical Industry Day of Recognition – October 6, 2025: John’s Story

    Electrical Industry Day of Recognition – October 6, 2025: John’s Story

    October 6, 2025 The Electrical Injury Day of Recognition is sponsored by the Electrical Contractors Association of Alberta, the Canadian Electrical Contractors Association, the Electrical Contractors Association of British Columbia, and the National Electrical Trade Council. The Canadian electrical industry is calling on all tradespeople and those who benefit from them, to set aside October 6 as a day… Read More…

  • Research Report: Visible and Invisible Consequences of Electrical Injury

    Research Report: Visible and Invisible Consequences of Electrical Injury

    October 6, 2025 This report was produced by the Infrastructure Health & Safety Association (ISHA). You can find the report, as well as sources on their website. This report has been written by Dr. Manuel Gomez, director of the St. John’s Rehab Research Program at Sunnybrook Health Sciences Centre in Toronto. Electricity is an important… Read More…


Changing Scene

  • Ontario Takes Next Step in Bowmanville Hospital Expansion

    Ontario Takes Next Step in Bowmanville Hospital Expansion

    October 6, 2025 The Ontario government is marking a key milestone in delivering high-quality hospital care for families in Durham Region by issuing a Request for Proposals (RFP) to select the team that will lead the expansion and revitalization of Lakeridge Health’s Bowmanville Hospital. This project will mark one of the largest redevelopments at Lakeridge… Read More…

  • Nova Scotia Takes Further Steps to Unlock Development in Halifax

    Nova Scotia Takes Further Steps to Unlock Development in Halifax

    October 6, 2025 Nova Scotia is taking more action to support housing growth in Halifax Regional Municipality (HRM), issuing new orders and moving policies forward. The measures include Municipal Affairs Minister John Lohr designating HRM as an interim planning area. Under this order, new minimum planning requirements for HRM take effect immediately. The designation also enables… Read More…

  • E.B. Horsman & Son Announces Stephen Murray as New Calgary Branch Manager

    E.B. Horsman & Son Announces Stephen Murray as New Calgary Branch Manager

    October 6, 2025 EB Horsman & Son is pleased to announce the appointment of Stephen Murray as Branch Manager of its Calgary location, effective Tuesday, September 3, 2025. Stephen Murray brings over two decades of experience in the industrial automation sector, where he has built a strong reputation for driving growth, expanding market presence, and… Read More…

  • E.B. Horsman & Son Announces Maxim Laberge as New Process Instrumentation Manager

    E.B. Horsman & Son Announces Maxim Laberge as New Process Instrumentation Manager

    October 6, 2025 EB Horsman is excited to welcome Maxim Laberge as its new Process Instrumentation Manager. Maxim Laberge brings over 25 years of experience in electrical, instrumentation, and control systems, with a proven record in business development, client engagement, and strategic project leadership. He is known for his consultative approach, combining technical insight with… Read More…