Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles


Changing Scene

  • ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    January 15, 2025 ABB Electrification’s Smart Buildings Division and Wieland Electric have announced a strategic partnership to revolutionize modular and serial construction with advanced prefabricated electrical installation systems. The collaboration combines Wieland’s innovative connector technology with ABB’s extensive portfolio – including switches, sockets, installation boxes, energy distribution, and smart home solutions – to deliver plug-and-play… Read More…

  • ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    January 15, 2025 ABB has announced the acquisition of Lumin, a U.S.-based pioneer and leading provider of responsive energy management systems, to expand its home energy management capabilities in the North American residential sector. The acquisition follows a strategic minority investment by ABB into the company in 2023. Financial terms of the transaction were not… Read More…

  • Mattr Completes Acquisition of AmerCable, Establishing US Wire and Cable Manufacturing Footprint

    Mattr Completes Acquisition of AmerCable, Establishing US Wire and Cable Manufacturing Footprint

    January 10, 2025 Mattr Corp. has announced that it has closed its previously announced acquisition of AmerCable Incorporated [see press release], which now forms part of Mattr’s Connection Technologies reporting segment. Under the terms of the transaction, Mattr has acquired all of the outstanding shares of AmerCable from Nexans USA Inc. for a purchase price… Read More…

  • Ontario Launches New Energy Efficiency Programs

    Ontario Launches New Energy Efficiency Programs

    January 10, 2025 The Ontario government is launching new energy efficiency programs, including the new Home Renovation Savings Program. The programs are part of a new $10.9 billion, 12-year investment in energy efficiency. The new Home Renovation Savings Program will launch on January 28, 2025, and offer rebates of up to 30 per cent for home energy… Read More…