The CE Code is a comprehensive document. Sometimes it can seem quite daunting to find quickly the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook , but will hopefully provide some help in navigating the code.

Section 2 – General Rules

Administrative

In Section 2 we encounter the first numbered rules in the code.The rules from 2-000 to 2-032 are categorized as administrative rules. These rules establish the authority of the inspection department with respect to the code and outline the code’soperative functions, such as permits, applications, paying fees, posting permits, notification for inspection, submitting plans and specifications, current-permits, reinspection, renovation, use of approved equipment, powers of rejection, availability of work for inspection, deviation or postponement, and damage and interference.These are the rules most likely to be amended by provincial or territorial authorities having jurisdictionbecause inspection departments may require different administrative procedures than those set out in the code.

Because these administrative rules are not technical in nature, amendments to them do not affect the consensus safety principles of the code’s technical rules.Also note that, as mentioned in the preface, Rule 2-002 establishes that where there are code sections covering particular installations, those rules do not cover all the rules that apply for that installation, but supplement or amend the rules in the general sections covering all installations.

Technical General

Next we move to the Technical part of the General Rules.These rules cover general safety aspects required of all electrical equipment and installations.The main topics include
• General
• Protection of Persons and Property
• Maintenance
• Enclosures
The General topic rules 2-100 to 2-104 deal primarily with required attributes of electrical equipment. Such topics as equipment markings, warning and caution markings, and ratings of equipment are included here.Although these requirements are also contained in the Part II Product Standards, the CEC Part I being the senior code document, the requirements are established here.

Rules 2-106 to 2-124 contain general requirements governing some specific conditions applying to equipment, such as using rebuilt equipment, substitution, and circuit voltage to ground in dwelling units. Other rules apply to conditions of installations like quality of work, material to be used for anchoring in masonry and concrete, corrosion protection for material used in wiring, soldering fluxes, use of AWG sizes for wire, accessibility of electrical equipment and nameplates, and the installation of other equipment near electrical equipment.

Rules 2-126 to 2-132 discuss requirements for the use of thermal insulation near or adjacent to electrical equipment, control of fire spread, and control of flame spread of wiring, cables and non-metallic raceway in accordance with the National Building Code of Canada requirements, which are referenced in Appendices B and G.

Rules 2-134 and 2-136 give sunlight resistance requirements for wire cable and non-metallic raceways and the insulation integrity of the finished installation. The final rule in the 2-100 series, rule 2-138, prohibits the use of Class A GFCIs being used as a substitute for insulation or grounding except as permitted by Rules 10-408(4) and 26-700(8).

Protection of Persons and Property: rules 2-200 and 2-202 require electrical equipment to be installed and guarded for the safety of persons and protection of equipment and the guarding of bare live parts.

The next 2-300 to 2-324 series of rules deals with Maintenance and Operation. These rules cover the need to keep electrical equipment well maintained, in good working order and tested for proper operation.As well, these rules specify safe working practices for maintaining equipment in hazardous locations, disconnection of live equipment, provisions for shock and arc flash protection and working space around electrical equipment, as well as adequate entrance and exit provisions for spaces containing electrical equipment.

Rules 2-312 to 2-324 cover placement of electrical equipment, accessibility for maintenance and proper illumination, ventilation, drainage and clearances from flammable materials and combustible gas equipment. In addition, rule 2-314 requires a receptacle to be provided for maintenance of HVAC equipment located on a rooftop.
Enclosures: rules 2-400 to 2-404 cover the types, uses and marking of enclosures and motors for various environmental conditions.

These are the administrative and general technical rules that apply to all electrical equipment and installations.You will often need to refer to these in combination with the specific rules of the Code to ensure compliance and an essentially safe installation.

In the next article we will explore Section 4 – Conductors. The previous article explored the code’s introductory pages and preface.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • CAGE CLAMP®: The Connection Technology that Changed Industrial Wiring

    CAGE CLAMP®: The Connection Technology that Changed Industrial Wiring

    November 13, 2026 Nearly 50 years after its introduction, WAGO’s universal spring-pressure technology continues to influence electrical connection reliability, installation efficiency, and equipment design. A single loose electrical connection can stop a production machine, disable a control system, or send a technician searching through hundreds of terminations for the source of a fault. In equipment… Read More…

  • Revit Files – What Are They & Why Do They Matter?

    Revit Files – What Are They & Why Do They Matter?

    November 13, 2026 By Liteline What Is a Revit File? A Revit file is a Building Information Modeling (BIM) object. It’s a digital version of a product that carries shape and data. Unlike standard, static 3D models, a Revit file is parametric. This means it’s packed with information like the product’s performance and specification data.… Read More…

  • Daylight Harvesting & Occupancy Control – The Savings the Lamp Swap Left Behind

    Daylight Harvesting & Occupancy Control – The Savings the Lamp Swap Left Behind

    October 6, 2026 By Nedco Daylight Harvesting & Occupancy Control: Where the Meaningful Energy Story Now Sits Part one of a three-part series on where energy savings live now that the LED conversion is essentially over. For the better part of a decade, energy-efficient lighting and switch to LED meant the same thing. Rip out… Read More…

  • LEDVANCE: Toyota Lighting Case Study – Brossard, Quebec, Canada

    LEDVANCE: Toyota Lighting Case Study – Brossard, Quebec, Canada

    November 10, 2026 Located 15 minutes from Montreal, Toyota’s Quebec Regional Office in Brossard, Canada houses a first-floor training and service area, and second-floor offices where financial services and dealer network operations are conducted. LEDVANCE Toyota Case Study Overview Goal: To upgrade the outdated mix of metal halide, T8 and T5 fluorescent, compact fluorescent, and… Read More…


Changing Scene

  • Paula Irwin of Black & McDonald Receives 2026 CAWIC DEI Award

    Paula Irwin of Black & McDonald Receives 2026 CAWIC DEI Award

    November 13, 2026 Black & McDonald is proud to celebrate Paula Irwin, recipient of the 2026 Diversity, Equity and Inclusion (DEI) Award presented by the Canadian Association of Women in Construction (CAWIC). The award recognizes individuals who are making a meaningful contribution to advancing diversity, equity and inclusion within the construction industry. In announcing the… Read More…

  • Electrical Safety Authority and London Hydro Partner to Tackle Copper Theft and Protect Ontario Communities

    Electrical Safety Authority and London Hydro Partner to Tackle Copper Theft and Protect Ontario Communities

    November 13, 2026 The Electrical Safety Authority (ESA) and London Hydro have partnered to launch Copper Theft Toolkit: Understanding Safety Risks and Community Impacts, a free communications toolkit developed collaboratively to help communities recognize the dangers, raise awareness and safely report suspicious activity. Copper theft is an ongoing safety concern that puts Ontarians at risk,… Read More…

  • Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    November 9, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $30 million loan towards enabling infrastructure for critical housing development on ECN reserve lands, near Edmonton, Alberta. The project will address exponential housing pressures within the community, allowing ECN members to return to community while supporting long-term growth on reserve.  The… Read More…

  • BCCSA Invests $100,000 to Strengthen BC’s Future Construction Workforce

    BCCSA Invests $100,000 to Strengthen BC’s Future Construction Workforce

    November 5, 2026 The British Columbia Construction Association (BCCA) is pleased to recognize a generous $100,000 contribution from the BC Construction Safety Alliance (BCCSA) Research, Development, and Opportunity Fund (RDO Fund) in support of Honour the Work, a national initiative dedicated to introducing young people to the skilled trades and building awareness of career opportunities… Read More…