Electricity Usage Down 6.8% in November 2015

November Electricity Usage

Feb 6, 2016

Canada used 44.4 million megawatt hours (MWh) of electricity in November, down 6.8% from the same month a year earlier as temperatures across most of the country rose above seasonal norms. With lower demand, electric power generation also decreased, falling 5.2% on a year-over-year basis to 49.0 million MWh.

Exports of electricity to the United States rose 5.4% to 5.2 million MWh, marking the 13th consecutive year-over-year increase in exports. In contrast, imports declined for the 11th time in 13 months, falling by nearly one-third to 0.6 million MWh.

Lower demand for electricity was widespread, with eight provinces and two territories posting declines, led by Quebec and Alberta.

In Quebec, where electricity is the primary heating source, demand fell 8.9% to 16.1 million MWh as average temperatures rose above historical norms.

In Alberta, demand fell 13.4% to 5.0 million MWh, the 15th consecutive year-over-year decline. Much of the drop in demand was seen in lower generation levels, which totalled 5.1 million MWh, led by a decline in steam conventional.

In Ontario, demand fell 4.8% to 10.3 million MWh, the ninth year-over-year decline of 2015. The result was a 6.1% drop in generation levels to 12.0 million MWh, led by nuclear and hydro generating stations. Despite the decline in generation, the province increased exports to the United States by 15.0% to 1.8 million MWh.

Source: Statistics Canada.

 

Related Articles


Latest Articles


Changing Scene

  • Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    May 26, 2025 Siemens will invest CAD $150 million over five years to establish a Global AI Manufacturing Technologies Research and Development (R&D) Center for Battery Production in Canada. The new R&D center, located initially at Siemens Canada’s head office in Oakville, as well as in Toronto and Kitchener-Waterloo, Ontario, will focus on developing cutting-edge AI manufacturing technologies with an initial emphasis… Read More…

  • Honda Postponing Ontario EV Supply Chain Investment by Two Years

    Honda Postponing Ontario EV Supply Chain Investment by Two Years

    May 26, 2025 Honda is postponing its plan to invest in a comprehensive EV supply chain in Ontario. The CBC reported that the investment is being push back by two years. “Due to the recent slowdown of the EV market, Honda Motor has announced an approximate two-year postponement of the comprehensive value chain investment project in Canada…. Read More…

  • Serge Leblanc Named Sonepar Canada Interim President

    Serge Leblanc Named Sonepar Canada Interim President

    May 26, 2025 George McClean, former President of Sonepar Canada, has decided to leave Sonepar for an opportunity outside of the electrical industry. Serge Leblanc, current President of Lumen Canada, has been appointed interim President of Sonepar Canada. Leblanc will manage both responsibilities until a successor is named.  Leblanc joined Lumen in 1997 and has… Read More…

  • Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    May 26, 2025 On Monday, May 26, the Ontario Building and Construction Tradeswomen (OBCT), will host its first-ever Advocacy Day at Queen’s Park. Tradeswomen from across the province will gather to meet with Members of Provincial Parliament, including Minister of Labour David Piccini, to advocate for progress in the skilled trades for tradeswomen. OBCT’s top priorities include:… Read More…