Providing back up power is essential to providing maximum value for commercial and industrial behind-the-meter energy storage installations.

With ever increasing costs of loss of productivity from power outages alongside the cost of installing energy storage installations, commercial and industrial customers are expecting, and often requiring, back-up power from their demand reduction energy storage installations. But not all energy storage inverters are capable of providing back-up power. This is an important distinction because with favourable economics accelerating the growth of behind-the-meter storage, the requirement for systems capable of backup power will continue to rise. It will be critical for developers and integrators to select systems that are capable of back up power built in meet the short term and long term expectations of their customers and to maximize the benefit for end users.

Here we provide considerations in selecting an inverter to provide backup power with a behind-the-meter energy storage system.

1. Seamless vs. through stop transition

Energy storage inverters have two primary operation modes — grid tied and grid forming. Grid tied mode (also referred to as current source, or ‘PQ Mode’) requires an AC voltage to be present at the point of interconnection with the inverter. In the case of a behind-the-meter (BTM) energy storage installation, AC voltage is established by the power source — typically the utility. During grid tied mode the energy storage inverter will synchronize to the utility’s AC voltage, frequency, and phase. This mode is sometimes referred to as PQ Mode of operation because the inverter can accept two simultaneous set points one for real power (P) and the other for reactive power (Q).

During grid forming mode (also referred to as voltage source, backup mode, or VF mode), the energy storage inverter establishes the AC voltage and frequency via the system’s batteries. The output power — both real and reactive — is supplied by the inverter based upon the impedance of the loads connected to the inverter AC output. The regulation of the AC output current from the inverter to the loads happens in a closed loop. This is analogous to putting a potentiometer across a 5V constant voltage power supply; the constant voltage power supply will modify the output current as needed to maintain the 5V set point. This mode is sometimes referred to as VF mode of operation because the inverter can accept two simultaneous set points one for RMS voltage (V) and the other for output frequency (F).

Many energy storage inverters offer both grid tied and grid forming mode of operation in the same product. However, not all energy storage inverters offer a seamless transition from grid tied mode to grid forming backup power mode. Facilities utilizing inverters with only through stop transition will loose power during the stop state phase: lights will go out, computer and manufacturing systems halted eliminating a portion of losses. Inverters utilizing seamless transition to back up power provide uninterrupted power to the customer’s load and continuous power to all critical needs, eliminating financial losses associated with the majority of power outages. This is why Dynapower employs proprietary seamless transition technology in its inverters — no loss of power or productivity, making the inverter more valuable to the end user.

Backup

 

 

 

 

 

 

 

 

 

Figure 1 shows a typical implementation of a behind-the-meter energy storage system with backup power. In grid tied mode the contactor is closed, this provides a grid connection to the critical loads as well as a grid tied to the inverter. When backup power is need from the behind-the-meter energy storage system the contactor will open, thus isolating the customer’s loads from the grid.

During operation, Dynapower’s inverter continuously monitors the grid’s voltage and frequency. If either the grid voltage or grid frequency go out of the (user’s defined) range, the inverter will implement dynamic transfer by opening the grid disconnect device (in Figure 1 we are showing a contactor) and transitioning to grid forming mode. By opening the contactor the inverter isolates itself and the critical loads from the grid and continues the delivery of power uninterrupted. This type of operation is considered “intentional islanding” and should not be confused with anti-islanding, where power is shut off when a disturbance in the grid is detected.

Additionally Dynapower’s Dynamic Transfer technology establishes a shunt connected uninterruptable power supply (UPS) unlike a traditional “online” UPS. The above notional diagram of a traditional UPS system includes a front end charging rectifier, battery, and an inverter directly servicing the critical load. The disadvantage of this traditional online UPS is that there is efficiency loss since all power to the critical load must go through two stages of power electronics — the rectifier and inverter. In contrast, Dynapower inverters with Dynamic Transfer only have a single stage of power electronics between the battery and critical load, making the energy storage system more efficient. A traditional shunt connected system will flicker if the grid suffers a low impedance (phase to phase short or phase to ground short). However, for high impedance grid faults, the transition for systems using Dynamic Transfer there will be little to no flicker.

Dynapower’s Dynamic Transfer has been used successfully in systems with certifications to UL 1741, IEEE 1547, IEC 62019, and IEC 62040. Dynapower has successful implementations of Dynamic Transfer with motorized breakers, contactors, and static switches used as the grid disconnect device.

2. Ability to scale

As businesses grow, hire more people, employ more equipment and expand facilities they will need to enlarge their energy storage systems. Deployers of behind-the-meter energy storage with backup power should consider the ability of the system’s inverter(s) to easily scale to meet growing needs. Not all inverters can parallel in grid forming mode to easily scale.

3. Cost and time to market for integrating renewables

The integration of additional generating resources, such as solar-PV when the system is islanded, requires integration and controls engineering to ensure that all generating sources (i.e., the battery, solar-PV, and generators) are operating in a safe and balanced method.

Here are four cost and feature considerations:

1. Can the inverter seamlessly transition from grid tied to grid forming mode?
2. Can the inverter parallel with other inverters to meet the system’s growing needs?
3. How easily can the inverter integrate renewable power sources such as PV?
4. How can single phase systems be optimized to lower costs?

Chip Palombini is Energy Storage Group Sales & Marketing Manager, Dynapower Company, LLC. This is a lightly edited version of a Dynapower white paper.

 

Related Articles


Latest Articles

  • Stephanie Medeiros on EV Infrastructure in Canada, Innovative Technologies, Well-Planned Charging Networks, & Commercial Fleets

    Stephanie Medeiros on EV Infrastructure in Canada, Innovative Technologies, Well-Planned Charging Networks, & Commercial Fleets

    September 3, 2026 By Blake Marchand In this Q&A with Stephanie Medeiros, the Head of Mobility at Schneider Electric Canada provides insight into her perspective on EV charging infrastructure in Canada, factors that will contribute to growing EV adoption, grid modernization for commercial fleets, the role of Vehicle-to-Grid and other innovative approaches to electrification. The focus of… Read More…

  • LEDVANCE: Understanding Light Beam Angles

    LEDVANCE: Understanding Light Beam Angles

    September 3, 2026 Light Beam Angles: How It Affects Different Types of Lighting, Where It Is Applied & What to Consider When Choosing the Right One Beam angle is important in lighting design. It determines how light spreads within a space and influences both functionality and atmosphere. By understanding beam angles, you can achieve both… Read More…

  • ITC 101 Series: Why Certifications (UL, CSA) Matter in Industrial Components

    ITC 101 Series: Why Certifications (UL, CSA) Matter in Industrial Components

    September 2, 2026 By ITC Electrical Components When selecting industrial electrical components, certification is more than a logo on a datasheet. A certification mark indicates that a product or component has been independently evaluated against specified requirements for its intended market. In North America, selecting products with the appropriate certification can affect regulatory acceptance, equipment… Read More…

  • Project Spotlight: Leigh Square Fountain

    Project Spotlight: Leigh Square Fountain

    September 2, 2026 In spring 2025, the City of Port Coquitlam unveiled a transformed Leigh Square, reimagined as a vibrant, accessible, and welcoming gathering place in the heart of downtown. At the heart of the renewed plaza, a Bellagio-style programmable dancing fountain is integrated directly into the paving—three interlocking rings where jets rise, fall, and… Read More…


Changing Scene

  • 2026 Ontario Apprenticeship Awards Call for Nominations

    2026 Ontario Apprenticeship Awards Call for Nominations

    September 3, 2026 Skilled Trades Ontario is proud to open nominations for the 2026 Ontario Apprenticeship Awards, recognizing outstanding apprentices, journeypersons, organizations and skilled trades leaders who are helping strengthen Ontario’s apprenticeship system. Award recipients will be announced at the Ontario Apprenticeship Summit on November 4, 2026, at the Toronto Congress Centre. Nominations must be submitted… Read More…

  • Bartle & Gibson Announces New Partnership with Hubbell Canada

    Bartle & Gibson Announces New Partnership with Hubbell Canada

    September 3, 2026 Bartle & Gibson Co. Ltd., an Alberta-based premier plumbing, heating and electrical distributor and Hubbell Canada have announced a new regional partnership enabling increased access to Hubbell Canada’s end-to-end electrical product portfolio across Western Canada. “With our strong presence in the west through 31 branches and counting located in Alberta, Saskatchewan, British… Read More…

  • Bartle & Gibson Opens Salmon Arm Location

    Bartle & Gibson Opens Salmon Arm Location

    September 3, 2026 Bartle & Gibson opened their new Salmon Arm location on July 20th. The Salmon Arm location features: This site is strategically positioned in the city of Salmon Arm, located near to the busy Picadilly Mall.  Salmon Arm branch is located at: 621- 10 Street SW Salmon ARM, BC V1E 1T1 Photo Source Read More…

  • MacKinnon Magnetics Announces Partnership with Resilient Sales Corporation in Northeastern Ontario

    MacKinnon Magnetics Announces Partnership with Resilient Sales Corporation in Northeastern Ontario

    September 3, 2026 MacKinnon Magnetics is pleased to welcome Resilient Sales Corporation as their newest sales agency partner. Resilient Sales will represent MacKinnon Magnetics across Northeastern Ontario, including the Districts of Muskoka and Parry Sound. Key markets include Sudbury, North Bay, Timmins, Kirkland Lake, Sault Ste. Marie, Huntsville, Bracebridge and Parry Sound. “This partnership expands… Read More…