Value of Building Permits Rose 5.6% in January

Economy

 

Apr 9, 2018

Canadian municipalities issued $8.4 billion in building permits in January, up 5.6% following a 2.5% rise in December. The value of permits for three components rose, while industrial buildings (-18.6%) and single-family dwellings (-1.3%) declined. The January increase was largely due to higher construction intentions for multi-family dwellings in Ontario.

Value of permits rebounds for multi-family dwellings in Ontario

The value of permits for multi-family dwellings in Ontario rose 71.0% (+$404.3 million) to $974.0 million in January, more than offsetting the 39.7% decline (-$374.7 million) reported the previous month. Nationally, apartments accounted for approximately three-quarters of the value of permits for multi-family dwellings in January, while row houses made up just under 18%. The rest of the multi-family dwelling component is comprised of permits for doubles such as semi-detached homes, and minor residential additions and renovations (permits under $50,000).

Toronto leads the gains among census metropolitan areas

In January, 16 of the 36 census metropolitan areas (CMAs) reported gains, led by Toronto. The total value of permits reported by municipalities in Toronto increased 25.5% to $1.8 billion in January, following a 14.0% decline in December. The increase mainly stemmed from multi-family dwellings, which hit $590.3 million in January, bouncing back from $311.0 million in December, the lowest point in 2017. The second largest gain was reported in the CMA of London, up 89.3% (+$77.5 million) from December, also due to multi-family dwellings.

Source: Statistics Canada, www.statcan.gc.ca/daily-quotidien/180308/dq180308a-eng.htm

Related Articles


Latest Articles

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…


Changing Scene