What Are PIR Sensors and Why Do I Need Them?

PIR Sensors

 

May 7, 2018

Passive Infrared (PIR) sensors are widely used in smart lighting systems and save money by dramatically reducing lighting usage and energy consumption. They are employed in offices and classrooms as well as in spaces with intermittent and unpredictable lighting usage, such as corridors, stairwells, storage areas, and parking garages. Lights can be programmed to either “dim” or “switch” in response to an occupancy status signal from a sensor. The strategy also improves comfort for occupants as they never have to enter a dark area or manually turn lights on or off.

How does a PIR sensor detect motion?

All objects, including those that are inanimate, emit heat energy in the form of infrared radiation. Humans, animals and plants generate stronger infrared signals than inanimate objects because they burn energy that generates heat to maintain (self-regulate) a particular temperature.

PIR sensors measure infrared light radiating from objects in its view. Anything that moves in front of a PIR sensor with a temperature different than the background of the view area will trigger a pair of pyroelectric elements on the sensor to react to the change in temperature with instantaneous differences in output. These differences in output generate energy, which triggers the sensor to transmit a detection signal to the light(s) to turn on. Simply put, the sensor detects a motion that indicates an occupant is in the space and light(s) turn on.

Equally important parts

There are two distinct parts of a PIR sensor: the sensor element and the cover or lens. The round metal sensor element is the sensor itself and it detects the level of infrared radiation. The cover or lens focuses the infrared signals on to the sensor. It determines the breadth of the sensing coverage area, the sensing range, and the sensing pattern. The lens is just as important, some would even say more important in some cases, than the sensor element.

The lens can have multiple facets that each look for a heat signature, so the more facets the lens has, the denser the sensor’s coverage area, meaning that there is a higher probability that an object in motion will cross a sensor’s beam and trigger the sensor (and the light). Using the same sensor element with two different lenses will provide different detection patterns and coverage areas.

Shape of the coverage area

Sensors can have a long range or a short range. With the extended range, the facets view angle is wider (approximately 120-140 degrees), and with the short range or standard range, the facets view angle covers a narrow angle (approximately 90-110 degrees).

Many people think the coverage area of a PIR sensor is in the form of a complete circle but this is not true. If you have a top view of the area, you will see slivers of coverage separated by gaps of non-coverage. If you have a side view of the same area, you will see coverage as a conical shape. In either case, coverage is not in the form of a complete circle.

3 classes of motion

There are three classes of motions that PIR sensors detect:

• major motion is when a person is moving at a walking speed of 1 metre per second
• minor motion is the motion of a limb moving such as waving or raising a hand
• micro motion is a person typing, flipping a page, or a movement on the mousepad

Once the coverage area and class of motion is identified, proper placement and setting the required sensitivity level of the sensor must be determined.

In Part 2 of this series on PIR Sensors, we highlight best practices for configuring sensors for maximum efficiency and savings. We look at proper sensor placement and setting accurate sensitivity levels as well as how to reduce false triggers and sensor time-outs.

This article was first published by Osram as an online blog: http://info.osram.us/blog/pir-sensors-why-do-i-need-them

Related Articles


Latest Articles

  • Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    March 16, 2026 By Electro-Federation Canada Following EFC’s recent update on our 2026 Ottawa Day, we are pleased to share photo highlights from two days of engagement on Parliament Hill, where members met with federal decision-makers to discuss the future of Canada’s electricity system. More than 40 EFC member leaders and Government Relations representatives travelled Read More…

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…


Changing Scene

  • Blackstone Announces Agreement to Acquire Arlington Industries

    Blackstone Announces Agreement to Acquire Arlington Industries

    March 20, 2026 Blackstone and Arlington Industries announced that funds managed by Blackstone Energy Transition Partners have entered into a definitive agreement to acquire Arlington. Founded in 1949, Arlington designs and manufactures a range of electrical products such as fittings, enclosures and other components. The company’s innovative solutions are used across commercial, industrial and data Read More…

  • A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    March 16, 2026 Guillevin.com was built as a digital working tool, designed to support the way their customers plan, search for, and purchase products today. The goal is simple: to offer a fast, reliable, and intuitive online platform capable of supporting real-world operations; both on the job site and in the office. A platform built around Read More…

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…