The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook** but will hopefully provide some help in navigating, while reading the code.

The 24th Edition of the CE-C, Part I, (C22.1-18)* is now available from CSA Group. This discussion of Section 78 — Marine Wharves, Docking Facilities, Fixed and Floating Piers, and Boathouses is based on the new edition.

Rule 80-000 notes that this is a supplementary or amendatory section of the code and applies only to the installation of impressed current cathodic protection systems. Appendix B and the CEC Handbook have additional information and descriptions of cathodic protection.

Rule 80-002 provides wiring methods for DC wiring and includes:

  • conformance to Section 12, except for below ground burial of not less than 450mm or 200mm in raceway or with mechanical protection
  • conformance to Section 18 and Section 20 in hazardous areas

Where DC wiring is installed underground below a Section 20 (Annex J20) Class I hazardous area, it may be buried to a depth not less than 450 mm or 200mm in raceway, providing the wiring is in threaded rigid conduit and sealed in accordance with rules 18-104 or 18-154, where it emerges from the ground.

Rule 80-004 requires that DC cathodic protection wiring be a minimum No. 12 AWG, except for instrumentation and reference electrode leads, and be selected in accordance with rule 12-102 (3) with regard to location and conditions of use.

Rule 80-006 specifies that splices, taps and connections made in conductors underground or exposed to the weather must be

  • made by welding, by a positive compression tool, by crimping and soldering, or by means of a copper, bronze, or brass cable connector
  • sealed against moisture by taping or other method as effective as the original insulation
  • connected to piping by thermit welding, or by a clamp of the same material as the piping or anodic to it
  • connected to a tank or other structure with a welded stud, thermit welding or other permanent means
  • sealed against moisture by the application of a material resistant to any corrosive environment

Rule 80-008 requires that the cathodic protection system rectifier be provided with a dedicated circuit in accordance with the requirements of Section 12.

Rule 80-010 outlines that each rectifier unit of a cathodic protection system have a separate disconnecting means installed

  • readily accessible
  • within sight of, and
  • within 15 m of the unit, or
  • integral to the rectifier and equipped with barriers or other suitable means to protect service personnel from live parts on the line side
  • rendered inaccessible to unauthorized persons by a lockable cover
  • labelled in a conspicuous, legible, and permanent manner identifying it as the disconnecting means for a cathodic protection system

Rule 80-012 requires that where the available operating voltage is more than 50V

  • the voltage difference between exposed points of the protected system, or
  • any point in the vicinity of the anodes, and any point 1m away on the earth’s surface, not exceed 10V.

Rule 80-014 requires that the following warning signs and drawings be provided:

  • a marking warning on tanks, pipes and structures that the cathodic protection system not be disconnected unless the power source is turned off
  • a sign, in a conspicuous location adjacent to the disconnecting means of electrical apparatus connected to the cathodically protected structures, advising that the cathodic protection be turned off and a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, be installed before equipment or piping is replaced or modified
  • in a non-hazardous location, a sign advising that the use of a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, may be used as an alternative to turning off the cathodic protection when replacing or modifying the protected equipment
  • a drawing, placed inside or near the rectifier cabinet, showing the location, polarity and anodes of underground cathodic protection wiring
  • a notice, placed in a conspicuous location adjacent to the entranceway of a storage or process container, advising that the cathodic protection system must be turned off before entering the container

In the next instalment, we will be discussing Section 84 – Interconnection of Electric Power Production Sources.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting; billburr@gmail.com

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA.

**Note the CEC Handbook is also published by CSA.

 

Related Articles


Latest Articles

  • Why Does My AFCI Breaker Keep Tripping? Causes, Fixes & Troubleshooting

    Why Does My AFCI Breaker Keep Tripping? Causes, Fixes & Troubleshooting

    October 19, 2026 By EB Horsman & Son Arc Fault Circuit Interrupter (AFCI) breakers play an important role in protecting homes from electrical fires, but repeated tripping can be frustrating for homeowners and contractors alike. While many people assume a tripping AFCI breaker is defective, the cause is often related to wiring conditions, connected devices,… Read More…

  • How Product Availability Impacts Project Timelines

    How Product Availability Impacts Project Timelines

    October 19, 2026 By CSC LED When planning an LED lighting project, the focus is usually on performance, specifications, budget, and application requirements. But there is another factor that can have just as much impact on the project: product availability. A fixture may be the right choice on paper, but if it is not available… Read More…

  • Housing Starts and Construction Data for September 2026

    Housing Starts and Construction Data for September 2026

    October 19, 2026 The six-month trend in housing starts was flat in September, with a slight increase of 0.6 to 250,411 units, according to Canada Mortgage and Housing Corporation (CMHC). The trend measure is a six-month moving average of the seasonally adjusted annual rate (SAAR) of total housing starts for all areas in Canada. Actual… Read More…

  • The Craft Behind the Glow: Unsworth Vineyards’ Barrel Wall

    The Craft Behind the Glow: Unsworth Vineyards’ Barrel Wall

    October 8, 2026 By Mac’s II Agencies Lighting the Barrel Wall at Unsworth Vineyards: A Feature Built Through Collaboration There are projects where lighting is the finishing touch, and projects where lighting becomes part of the architecture’s story. July 2025 marked a new chapter at Unsworth Vineyards: a new tasting room designed not just for… Read More…


Changing Scene

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…

  • Government of Canada Announces Major Investment in Apprenticeship Training

    Government of Canada Announces Major Investment in Apprenticeship Training

    September 19, 2026 The Government of Canada is responding to a rapidly changing global economy and evolving trade relationships by focusing on what it can control. Through the Team Canada Strong initiative, it is building a stronger, more resilient country by investing in the people, skills and industries that will drive Canada’s future prosperity. Key… Read More…