Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles

  • Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    June 23, 2025 Virtual Training for Electricians (VET) is now available at many IBEW Canada Training Centres nationwide — and more are coming online soon! Whether your centre is already equipped or in the process of setting up, this is a game-changing opportunity you won’t want to miss. Need assistance? Contact the NETCO team. What… Read More…

  • Designing for Demand: The Role of Transformers in a Resilient EV Future

    Designing for Demand: The Role of Transformers in a Resilient EV Future

    June 23, 2025 Transformers in the EV Charging Boom: Are We Ready for the Load? As electric vehicles (EVs) continue their rapid rise, one question looms over the energy sector, municipalities, and developers alike: Is our infrastructure truly ready for the surge in demand? From city streets to highway rest stops, new EV chargers are… Read More…

  • The Time is Now: An Industrial Energy Efficiency Action Plan

    The Time is Now: An Industrial Energy Efficiency Action Plan

    June 23, 2025 In a whitepaper released on June third, ABB has set out the scale of the challenge facing the global industrial sector and emphasizes the critical role of industrial energy efficiency in meeting rising energy demand while strengthening energy security & affordability and driving industrial competitiveness. With 45% of the world’s electricity converted… Read More…

  • Multi-Family Construction Intentions Weigh Down Residential Sector

    Multi-Family Construction Intentions Weigh Down Residential Sector

    June 23, 2025 In April, the total value of building permits issued in Canada decreased by $829.6 million (-6.6%) to $11.7 billion. British Columbia (-$1.2 billion) led this decrease in construction intentions, which was mitigated by Ontario (+$299.3 million). On a constant dollar basis (2023=100), the total value of building permits issued in April fell by 6.6% from the previous… Read More…


Changing Scene

  • Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    June 23, 2025 In an effort to provide essential resources to individuals and families in need in the GTA, EFC members once again stepped up to support Haven on the Queensway, a community resource centre in Etobicoke, ON. Earlier this year, Haven secured a new, larger location nearby its existing facility to meet growing demand… Read More…

  • Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    June 23, 2025 Metalumen Manufacturing, Inc. is pleased to welcome NRG INTENSI-T as its new sales agency for the Quebec region. This partnership strengthens regional support and reflects a shared commitment to innovation and excellence. Since 1977, Metalumen has been designing, engineering, and manufacturing lighting products that blend functionality with design, offering luminaires tailored to… Read More…

  • IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    June 23, 2025 Conduit bending – one of the hardest skills for professional electricians to master – is now easier than ever to learn, thanks to a first-of-its kind partnership between BILT, an app that has revolutionized step-by-step interactive instructions for DIYers and IDEAL Electrical, a 108-year old manufacturer of electrical tools and supplies for professional electricians…. Read More…

  • Introducing the New WAGO App: Your Jobsite Sidekick

    Introducing the New WAGO App: Your Jobsite Sidekick

    WAGO at your fingertips — scan the QR to get the app now. Stay connected with WAGO wherever you go. Download the WAGO App to access product details, documentation, configuration tools, as well as local distributors — all from your mobile device. Scan the QR code to get started on the App Store or Google… Read More…