Post-Modern Estimating Methodologies

February 9, 2023

By Melvin Newman – President, PataBid

How do you estimate a project today? At its core, the function of estimating a construction project is much the same today as it has been throughout human history. Project costs and quantities must still be calculated just like they were when the great pyramids were built. What has changed dramatically is the time given towards creating an estimate. With that in mind, let’s explore post-modern estimating methodologies to streamline and automate the estimating process.

Project timelines are in a never-ending crunch. Schedules are being compressed on all fronts so that owners can maximize the function and return on the projects they commission. This schedule compression has led to numerous alternative contract models such as Design Build, Progressive Design Build, Public Private Partnership (P3) and a host of other unique attempts to minimize the time spent in the front-end of the construction project life cycle. All these forces have had a profound effect on the amount of time given to produce estimates, and the methods used.

Digital estimation processes and automation are the most effective answers to these business challenges today. Regardless of the size of the contractor, the challenges are largely the same.  From small single home residential builders up to trans-national multi-billion dollar companies, estimating challenges are consistently prevalent.  The only difference is the scale of the projects. 

Let’s address some key questions in estimating methodologies:

  1. How do you know if an opportunity is good? 
  2. How do you perform the takeoff and quantification in less time?
  3. How do you get supplier pricing input in time, and make sure it’s accurate?

Let’s start with the first question, how do you know if an opportunity is good? This can be one of the most difficult questions to answer, especially for the contractor just starting out. Large established contractors typically have a matrix or series of questions that they go through for each opportunity to grade it against past experience. Building a grading system for incoming opportunities is one of the first things a contractor should do.

The following are some key questions to put in a matrix:

  1. How was past work with this client on a scale of 1-5?
  2. Was the work profitable?
  3. How strong is the relationship with this client on a scale of 1-5?
  4. What is the schedule for this work? Is it achievable?
  5. Are there penalties on this project based on the schedule (ex. liquidated damages)?
  6. How much work is going on now? Is there capacity for this opportunity?

Typically having a matrix of 5 – 10 questions that can quickly be checked off for every new incoming opportunity will help identify key opportunities that can have the best chance of a positive return. It is best to make a template file in Microsoft Excel or Word and keep this file in the folder of every opportunity that comes in. A critical requirement to making this work is to track outgoing bids and keep a log of the success rate of each opportunity along with who it is successful with. Digital estimating software like PataBid Quantify make this process simple by allowing contractors to track who each bid goes out to and how they perform on each one.

Estimating Methodologies
PataBid Quantify

The next question is, how do you perform the takeoff and quantification in less time? Estimates are being demanded from owners within days of receiving the tender documentation. The time crunch to prepare accurate estimates is severe. The only way to accomplish accurate estimating now is through a properly tuned digital estimation platform that automates much of the labour intensive quantification and extension processes.

To start, a properly integrated estimating platform will include a native graphical takeoff process to manage drawings and takeoff. It is key that any takeoff or markup of the drawings be directly linked to the quantities in the estimate. This guarantees accuracy; meaning if it’s marked up on the drawing it is in the estimate! If it is not marked up, it is not in the estimate! This significantly accelerates the takeoff process by combining the drawing markup and quantity summary steps into one single action.

In a fully integrated platform like Quantify, the platform will also immediately attach the labour and material values to this takeoff as it is being done. This means that the drawing markup, quantity summary, labour extension and material extension steps are all combined into one simple step: marking up the drawing. This leads to significant time savings when estimating as well as improved accuracy in the final estimate. Note that this culmination of steps does not account for Machine Learning (ML/AI) implementation. 

Estimating platforms like Quantify also have ML/AI integration in the drawing markup stages to automate specific processes.  This integration reduces quantity takeoff further, sometimes down to mere minutes to complete.

Estimating Methodologies
PataBid Quantify

One of the next major challenging questions in completing an estimate is, how do you get supplier pricing in on time and make sure it’s accurate? Supplier pricing is critical to completing an estimate successfully. Understanding what a supplier has quoted and verifying that it is accurate is another significant risk factor to any contractor completing estimates for a client. A digital estimating process is key here as often supplier pricing is one of the last things to be received by the contractor on the day the estimate is due. Due to the time constraints, it is very difficult to input a supplier’s late pricing and verify its accuracy.

Digital estimating processes are critical to ensuring these quotations are accurately evaluated and nothing is missed. During the early stages of an estimate, it is critical to take a close look at all the packages and quotations that will be required to complete the estimate on the day of closing. This should be one of the first things looked at in a bid package. Once these items have been identified, construct a scope matrix in a spreadsheet that lays out all the expected materials and the suppliers that are expected to quote on them.

Typically it is best to place the scope items vertically down the left side and the suppliers along the top. This creates a matrix where it is easy to put a letter or number in to show what supplier is quoting which items allowing all quotes to be leveled and analyzed quickly.

Estimating Methodologies
Opportunity Matrix

Quotations that require accurate quantities such as lighting and distribution should be taken off as early as possible. These quantities should tie back to the scope matrix so that if something changes, the scope matrix will automatically update.  The advantages to using an electrical estimating software platform like PataBid Quantify is that it comes with out of the box pricing tools to ensure accurate pricing on every job, without the extra step of creating a scope matrix. 

There are a lot of things to consider when putting together a quotation for a project. One of the riskiest times in a company’s life is when they want to take a step up in the projects they are looking at. This can range from moving from home building into retail mall commercial, or from small commercial tenant fit-ups into larger base building projects. All of the step changes include significant variations in risk while the time constraints to put accurate pricing together continues to get shorter.

It is critical to have proper estimating methodologies and processes in place to handle these step changes and the new opportunities they can bring.  Implementing effective estimating processes to address the above key questions for your contracting business will help ensure long term growth and success.

To learn more about Quantify mechanical/electrical estimating software and to access more estimating resources, visit PataBid’s blog, Youtube channel or Instagram page.

This article is the thrid in a series by Melvin Neman.

You can find the first article here: Why Digital Estimating?

Second article: What to Consider When Integrating Digital Estimating into your Business

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…

  • Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    September 16, 2026 This recall involves Goal Zero YETI 3000X power stations. The silver and black portable power stations measure about 62 centimetres (24.4 inches) high, 47 centimetres (18.5 inches) wide, 57 centimetres (22.3 inches) deep and weigh approximately 42 kilograms (92 pounds). The power stations have yellow handles and a digital display at the… Read More…


Changing Scene

  • LEDVANCE Canada Marks 10 Years of Innovation and Growth and Looks Ahead to Its Next Chapter in the Canadian Market

    LEDVANCE Canada Marks 10 Years of Innovation and Growth and Looks Ahead to Its Next Chapter in the Canadian Market

    September 25, 2026 From legacy lighting leader to solutions partner, LEDVANCE is entering its next decade with a clear focus on Canadian customers, communities, and market needs LEDVANCE Canada is marking the 10th anniversary of LEDVANCE as an independent brand by celebrating a decade of growth, customer partnerships, and continued investment in solutions designed around… Read More…

  • EFC Welcomes Patrick McManus as Incoming President & CEO

    EFC Welcomes Patrick McManus as Incoming President & CEO

    September 25, 2026 Electro-Federation Canada (EFC) is pleased to announce the appointment of Patrick McManus as President & CEO, effective October 13, 2026. McManus will succeed Carol McGlogan, who is retiring following 10 years with EFC. McGlogan will remain with the organization through the end of 2026 to support a smooth leadership transition. McManus is… Read More…

  • Innovair Solutions Acquires TRM Heating Cables

    Innovair Solutions Acquires TRM Heating Cables

    September 18, 2026 Innovair Solutions has announced the acquisition of TRM Heating Cables, a Toronto-based Canadian company specializing in heating cables for commercial and industrial applications. Founded in 2001, TRM has built strong technical expertise in the sale and installation of specialized products, including self-regulating cables, mineral-insulated cables and electric floor heating systems. The company… Read More…

  • Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    September 17, 2026 From preparing the next generation of skilled workers to supporting one of the world’s largest sporting events, this year’s recipients demonstrate how electrical safety supports Ontario’s future As Ontario electrifies homes, transportation and industry, the Electrical Safety Authority (ESA) has recognized the organizations and individuals helping ensure safety keeps pace with that… Read More…