New Lighting at National War Memorial in Saint John’s Reflects 1924 Design

provincial and federal government oil to electric rebate

June 30, 2025

New lighting has been installed at the National War Memorial in St. John’s, designed and created based on the original light globes that would have been in place when the Memorial was first constructed in 1924. The creation and installation of the globes has been a team effort between the Government of Newfoundland and Labrador, Memorial University and the Royal Canadian Legion – NL Command.

The idea to create and install the new lights arose when the Royal Canadian Legion – NL Command discovered the last original National War Memorial globe in their archives. The replacement of the modern globes to ensure appropriate historical interpretation at the site became a reality as a commemorative project to celebrate Memorial University’s 100th anniversary in 2025.

Now replicated on site at the National War Memorial, the globes are in the shape of flames which tie directly to Lieutenant-Colonel Thomas Nangle’s vision for the site, which was based on Lieutenant-Colonel John McCrae’s poem In Flanders Fields (which references the torch).

In 2022, the Government of Newfoundland and Labrador, in partnership with the Royal Canadian Legion – NL Command, the Government of Canada and the Commonwealth War Graves Commission announced the refurbishment of the province’s National War Memorial, including the incorporation of a tomb, to commemorate the 100th anniversary of its official unveiling in 1924.

On July 1, 2024, Newfoundlanders and Labradorians gathered at the National War Memorial in St. John’s to mark the memorial’s centennial anniversary. This historic event included the laying to rest of an unknown Newfoundland First World War soldier whose remains were repatriated from Northern France.

The site is the only National War Memorial and the only other tomb of the unknown solider outside our nation’s capital in Ottawa. It is also a National Historic Site and a Provincial Historic Site.

Source

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…