Think You May Be Exposed to Asbestos? Here’s What You Need to Know

Asbestos

 

From 1992 to 2008, electrician Denis Lapointe worked at the Canada Revenue Agency’s Ottawa taxation facility drilling and pulling wires through walls, floors and ceilings. In the process, he may have been exposing himself and others to asbestos. According to CBC news reports, Lapointe learned that asbestos was present only while reading a 1995 building condition report —despite laws requiring employers to inform workers of hazards they may be exposed to. To find out more, he had to file access to information requests.

“It’s everywhere,” he told CBC. “It lines all kinds of piping, it lines ventilation piping, it’s in plaster, it’s in grout that finishes the walls, it’s in the cement where you’re chipping, and the tiles.”

To be clear, asbestos in building materials is a hazard only when disturbed, but that’s exactly what Lapointe was doing on behalf of his employer. Although Lapointe has not been diagnosed with an asbestos-related disease —it can take years to show itself —the non-smoker suffers from poor health and breathing problems.

Your rights

Under occupational health and safety legislation, workers have three rights:

• the right to know about any hazards to which they may be exposed

• the right to participate to be part of the process of identifying and resolving health and safety concerns, typically through a joint health and safety committee or a worker health and safety representative

• the right to refuse work that they believe is dangerous

You also have duties

Workers have a general duty to take responsibility for their personal health and safety, which means 

• reporting any known workplace hazard or violation to the employer or supervisor

• telling the employer or supervisor about any known missing or defective equipment or protective device that may be dangerous

• working in compliance with health and safety legislation

• using any equipment, protective devices or clothing required by the employer

• not removing or make ineffective any protective device required by the employer or by regulations

• not behaving or operating equipment in a way that would endanger themselves or others

What to do about potential exposure

If you believe you’re not properly protected against exposure to asbestos, stop work immediately and discuss your concern with your supervisor or client. Don’t resume work until you’re sure that the hazard is under control. 

If asbestos is suspected, your employer must have a qualified professional complete a hazardous material survey. If the survey determines that people may be exposed to airborne asbestos fibres above a limit set in the legislation, then an exposure control plan must be implemented.The plan must include steps to eliminate risks or to control and reduce risks by 

• substituting less hazardous materials or 

• by using engineering controls, administrative controls, or 

• personal protective equipment. 

The plan must include detailed safe work procedures developed and approved by a qualified professional. 

If you’re a supervisor or employer, evacuate the area immediately. Isolate the hazard area and keep unnecessary and unprotected personnel away. When containing and cleaning up the suspected hazard, avoid generating dust. Use a shovel/scoop or approved HEPA vacuum and place in a suitable container for disposal. Avoid dry sweeping. If necessary, use a dust suppressant such as water. Do NOT use compressed air for cleanup.

Inform yourself

Find out more about health and safety laws regarding asbestos. Every provincial, territorial and federal health and safety authority will have information on asbestos available online.

Additional reading from EIN

• Electrician’s Asbestos Exposure Leads to Lung Cancer

https://electricalindustry.ca/latest-news/833-electrician-s-asbestos-exposure-leads-to-lung-cancer?utm_source=newsletter&utm_medium=email&utm_content=1000&utm_campaign=2014-10-21

• Supervisor’s Dismissal Upheld for Exposing Workers to Asbestos https://electricalindustry.ca/latest-news/804-supervisor-s-dismissal-upheld-for-exposing-workers-to-asbestos?utm_source=newsletter&utm_medium=email&utm_content=1000&utm_campaign=2014-10-07

 

Related Articles


Latest Articles

  • Take the Lesson

    Take the Lesson

    September 2, 2024 By Keith Sones, seasoned utility industry executive “I really don’t want to do this.” “You have to Keith. You have no choice. You can’t leave him hanging” replied my wife. I stared at the phone like a child looks at liver on their plate. They know you have to eat it but also… Read More…

  • Quebec Drives the Growth in Residential Building Construction in June, 2024

    Quebec Drives the Growth in Residential Building Construction in June, 2024

    Investment in building construction grew 2.8% to $21.4 billion in June, after a slight increase of 0.8% in May. These increases partly reflect April’s record high of $13.4 billion in total building permits value, since investment levels for a given period are driven by permits issued in prior months. The June increase in investment in building construction was primarily… Read More…

  • Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    August 16, 2024 The new Western Memorial Regional Hospital in Corner Brook is home to Canada’s largest geothermal system, which has set a precedent for modern infrastructure for both Newfoundland and Labrador and North America. The geothermal field is approximately 600 feet below the hospital’s parking lot, and provides 100 per cent of the ground… Read More…

  • Brightening Communities: LED Technology in Action

    Brightening Communities: LED Technology in Action

    August 15, 2024 By Alex Price, Brand & Planning Manager, Current LightingTechnical Contributor: Gary Steinberg, Senior System Manager (Outdoor LED Fixtures), Current Lighting As the landscape of Canadian cities continues to evolve, the importance of outdoor lighting cannot be overstated. From enhancing public safety to promoting economic activity and fostering a sense of community, well-planned… Read More…


Changing Scene

  • Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric is transforming its Digital Buildings business in Canada with the launch of the SMART Buildings Division. This evolution marks a strategic move to deliver comprehensive solutions and services that support building owners and operators in achieving their decarbonization and sustainability goals. The demand for smart buildings is surging, driven by a global shift… Read More…

  • Introducing Alan Bearden as Interim President of Southwire Canada

    Introducing Alan Bearden as Interim President of Southwire Canada

    September 4, 2024 Southwire Canada is pleased to announce that Alan Bearden has been appointed Interim President. In this role, Alan will provide leadership and guidance for Southwire’s Canada-based organization, ensuring continuity and driving growth during this transitional period. Alan Bearden brings a wealth of experience to the position, having joined Southwire in 2008. Over… Read More…

  • A Partnership Between Electromag Graybar Canada and Phoenix Contact

    A Partnership Between Electromag Graybar Canada and Phoenix Contact

    September 3, 2024 Electromag Graybar Canada, a pioneer in industrial automation solutions and pneumatic products, is excited to announce a partnership with Phoenix Contact, a global leader in electrification, networking, and industrial automation. This collaboration, which initially began in the Langley and Ontario branches, is now expanding to Quebec. The alliance aims to provide cutting-edge… Read More…

  • Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    September 2, 2024 William (Bill) C. Smith, Director, Transitional Business of Electrozad Supply Company Limited announced his retirement as of August 30th, 2024 after 49 years of leadership. Bill began his electrical career working part-time at Electrozad Supply while completing a Sales & Marketing Program at St. Clair College.  After his first full-time position in… Read More…