Related Articles
Average Contractor Salaries by Job
Project managers lead among six categories. For all categories, salaries vary from year to year, and not always rising.
Guide to the Canadian Electrical Code, Part I — Instalment 32
In this article: Section 64 — Renewable Energy Systems. Rule 64-000 notes that this is a supplementary or amendatory section of the code and applies to the installation of stand-alone and interactive renewable energy systems, except where they operate as Class 2 circuits with the voltage and current limited as per Rule 16-200(1)(a) and (b).
Guide to the Canadian Electrical Code, Part I: Section 30
Section 30 – Installation of Lighting Equipment as outlined in Rule 30-000 Scope is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, protection, and control of all lighting equipment.
Solar and Wind with Battery Storage are Set to Produce Cheaper Electricity than Natural Gas in Alberta and Ontario: Report
February 14, 2023 In Alberta and Ontario, wind can now produce electricity at lower costs than natural-gas-fired power—with even more reductions on the horizon, according to a new report from Clean Energy Canada, which was informed by research commissioned from Dunsky Energy + Climate Advisors. The Future of Solar and Wind Even without carbon pricing, wind power…
Latest Articles
-
Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector
December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…
-
Lighting Control Basics for Home Automation
By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology? Or are you a true believer? As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…
-
Grounded in Ontario: The Future of Energy Storage Systems
December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…
-
4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds
December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…
Changing Scene
-
Resilient Sales to Represent Liteline in Northern Ontario
December 16, 2024 Resilient Sales is very excited to announce that they will be representing Liteline in Northern Ontario staring January 1st, 2025. Territory coverage will include Sudbury, North Bay, Sault Ste Marie, Timmins, Kirkland Lake, and Temiskaming Shores. Read More…
-
CIB and RBC Commit $20 million Towards the Environmentally Sustainable Revitalization of the Matawa Training and Wellness Centre
December 16, 2024 The Canada Infrastructure Bank (CIB), Royal Bank of Canada (RBC), and Matawa First Nations Management (Matawa) have reached financial close on the Matawa Training and Wellness Centre energy retrofit project. The CIB is lending $15 million through its Indigenous Community Infrastructure Initiative (ICII), in addition to RBC’s $5 million financing to support… Read More…
-
New FLO Chargers in Northwest Territories, Niagra Falls, and the Legendary Fairmont Empress
December 16, 2024 FLO has announced new EV charger installations in Hay River, Northwest Territories, Niagara Falls, Ontario, and the Fairmont Empress in Victoria, British Columbia. New FLO Chargers in Hay River, Northwest Territories The Town of Hay River in Canada’s Northwest Territories has its first DC Fast Charger with the installation and activation of… Read More…
-
Chuck Cartmill Announces Retirement as CEO of LED Roadway Lighting
December 13, 2024 LED Roadway Lighting (LRL) has announced that Chuck Cartmill will be stepping down as Chief Executive Officer effective January 1st, 2025. Since founding the company in 2002 as C-Vision, Chuck has played an instrumental role in growing LED Roadway Lighting from its modest beginnings in an empty building with one employee into a… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.