STANDATA Interpretation: 2024 Canadian Electrical Code, Part 1 Section 6 – Number of Supply Services Permitted

March 21, 2025

Purpose

To clarify requirements for installations regarding the number of supply services permitted to be located on one unit of a building consisting of row housing for residential occupancies.

Discussion

There has been inconsistent application of the 2024 Canadian Electrical Code (CE Code) Part 1, Rule 6-102 regarding type and location where metering equipment is permitted on a building consisting of row housing.

Subdivisions of land may be developed with multiple service supplies or single service supplies intended to
service a residential building as permitted in CE Code Part 1, Rule 6-102.

Utilities design electrical facilities that comply with requirements set out by the Alberta Electrical Utility Code (AEUC). The AEUC is adopted under the Safety Codes Act and is used in combination with the CE Code Part 3, C22.3 No. 1 Overhead Systems and C22.3 No.7 Underground Systems which provides the minimum safety standards for the installations and maintenance of electrical utility systems in Alberta.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Delta Transformers Appoints New Representative in Ontario

    Delta Transformers Appoints New Representative in Ontario

    October 8, 2026 Delta Transformers, a Canadian manufacturer of dry-type transformers, is pleased to announce the appointment of Spectrum Power Systems as their new representative in Ontario, Canada, effective October 1st, 2026. For over 27 years Spectrum Power Systems has been representing leading electrical manufacturers throughout Ontario. The company has a strong presence in the… Read More…

  • Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    October 8, 2026 Arrest follows ESA licence revocation, $70,000 in previous fines and new electrical safety charges   Peel Regional Police recently arrested Rahyl Hassan, principal of former Licensed Electrical Contractor, Strak Holdings Inc., following an investigation in which the Electrical Safety Authority (ESA) cooperated with police.  ESA referred concerns about potential criminal activity to Peel… Read More…

  • Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    October 8, 2026 The federal government has announced a $2 billion investment to deliver one million home retrofits across Canada. These energy-efficient retrofits will lower heating costs for Canadians and reduce emissions. First, they are launching a new National Heat Pump Rebate to help up to 820,000 households make the switch to more efficient electric heat pumps: Heat pumps… Read More…

  • FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    September 8, 2026 Funding supports homeowners and affordable housing providers in reducing energy costs and improving quality of life, while adding jobs to communities coast-to-coast  The Government of Canada and the Federation of Canadian Municipalities (FCM) today announced that $66.3 million in funding has been approved for 162 energy efficiency projects across the country. The… Read More…