TSBC Bulletin: Requirements for Electric Vehicle Supply Equipment (EVSE) and Electric Vehicle Energy Management Systems (EVEMS)

March 21, 2025

The purpose of this bulletin is to provide clarity on:

  1. Select BC Electrical Code (BCEC) installation requirements.
  2. Load calculation requirements.
  3. Technical Safety BC Requirements for approval and acceptance of EVEMS equipment.

Definitions from the BC Electrical Code and Product Standards

Electric Vehicle Supply Equipment (EVSE) โ€“ A complete assembly consisting of cables, connectors, devices, apparatus, and fittings installed for the purpose of power transfer and information exchange between the branch circuit and the electric vehicle.

Electric Vehicle Energy Management System (EVEMS) – A means used to control electric vehicle supply equipment loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads and consisting of any of the following: a monitor(s), communications equipment, a controller(s), a timer(s), and other applicable device(s)

Fail-safe (Safe State) โ€” a state where any or all of the following conditions apply:

  • the actual load does not exceed the ampere rating of the circuit; and/or
  • at the EVSE level, or another level, a pre-configured (default) state that prevents the actual load exceeding the ampere rating of the circuit(s).

*Industry terminology varies amongst manufacturers. This is a โ€œstateโ€ or, โ€œmode-of-operationโ€ where the system changes the level of current applied to the circuit depending on pre-set parameters.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Skills Ontario Celebrates Team Ontario Winning 38 Medals atย Skills Canada National Competition 2026

    Skills Ontario Celebrates Team Ontario Winning 38 Medals atย Skills Canada National Competition 2026

    June 8, 2026 After two days of showcasing their skills, youth on Team Ontario are returning home from Skills Canada National Competition 2026 with 308 medals.  At a Closing Ceremony on May 30th following the Skills Canada National Competition in Toronto, which took place from May 28th to May 29th, Team Ontario took home 38 Read More…

  • Spartan Controls Opens New facility in Kitimat to Support Growing Industrial and Energy Sector Demand

    Spartan Controls Opens New facility in Kitimat to Support Growing Industrial and Energy Sector Demand

    June 8, 2026 Spartan Controls, a leading provider of industrial automation solutions, is proud to announce the opening of a new facility in Kitimat. The service centre expands Spartan’s presence in Northwestern British Columbia to support the region’s rapidly growing industrial and energy sector. The new facility strengthens Spartan’s ability to deliver local support to Read More…

  • Laurentide Controls Acquires C. Latendresse Inc., Reinforcing its Integrated Industrial Electrical Offering in Eastern Canada

    Laurentide Controls Acquires C. Latendresse Inc., Reinforcing its Integrated Industrial Electrical Offering in Eastern Canada

    June 8, 2026 Laurentide Controls is proud to announce the acquisition of C. Latendresse Inc., an industrial and commercial electrical contractor founded in 1976, based in Charlemagne, QC. The transaction closed on May 25, 2026. A Targeted Strategic Reinforcement This acquisition is the result of a strategic convergence: Laurentide brings to C. Latendresse Inc. the Read More…

  • ESA Highlights Proactive Maintenance as Part of Building Safety Month

    ESA Highlights Proactive Maintenance as Part of Building Safety Month

    June 8, 2026 Much of Ontarioโ€™s housing stock is aging, and the risks are becoming harder to ignore. More than ๐Ÿด๐Ÿฌ% ๐—ผ๐—ณ ๐—ฝ๐˜‚๐—ฟ๐—ฝ๐—ผ๐˜€๐—ฒ-๐—ฏ๐˜‚๐—ถ๐—น๐˜ ๐—ฟ๐—ฒ๐—ป๐˜๐—ฎ๐—น ๐—ต๐—ผ๐˜‚๐˜€๐—ถ๐—ป๐—ด ๐—ถ๐—ป ๐˜๐—ต๐—ฒ ๐—ฝ๐—ฟ๐—ผ๐˜ƒ๐—ถ๐—ป๐—ฐ๐—ฒ ๐—ถ๐˜€ ๐—ผ๐˜ƒ๐—ฒ๐—ฟ ๐Ÿฐ๐Ÿฑ ๐˜†๐—ฒ๐—ฎ๐—ฟ๐˜€ ๐—ผ๐—น๐—ฑ. Between 2019 and 2023, there was an ๐—ฎ๐˜ƒ๐—ฒ๐—ฟ๐—ฎ๐—ด๐—ฒ ๐—ผ๐—ณ ๐Ÿฏ๐Ÿฎ ๐—ฒ๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น ๐—ณ๐—ถ๐—ฟ๐—ฒ๐˜€ ๐—ฒ๐—ฎ๐—ฐ๐—ต ๐˜†๐—ฒ๐—ฎ๐—ฟ in aging multi-unit residential buildings, with the potential Read More…