Greenlee Circuit Tracer Kit

Greenlee

November 13, 2017

Greenlee’s Circuit Tracer kit provides fast, simple energized circuit tracing. Finds shorts to ground and supports transmitter to receiver up to 6.5km’s away.

Features:

  • Accessory : 38583 High Voltage Adapter
  • Battery : 9 V
  • Dimensions : Case Size: 12.000 IN (305.000MM) Length x 8-3/4 IN (222.000 MM) Width x 2.000 IN (51.000MM) Depth
  • Distance : 3000.000 – 4000.000 FT (915.000 – 1220.000 M)
  • Includes : 36925 Receiver, 36926 Transmitter, 36928 Transmitter Plug, 36929 Receptacle Blades (2), AC, 36930 Test Lead, 36927 Plastic Case
  • Receiver To Transmitter Distance : Up To 4 Miles (6.5 KM)
  • Replacement Part : 36925 Receiver, 36926 Transmitter, 36928 Transmitter Plug, 36929 Receptacle Blades (2), AC, 36930 Test Lead, 36927 Plastic Case
  • Sub Brand : Power Finder
  • Type : Closed
  • Voltage Rating : 9 – 300V AC/DC
  • Weight : 2.400 LB (1089.000 G)

For more information:

http://www.greenlee.com/products/CIRCUIT-TRACER-KIT.html

 

 

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene