FLO Brings its Fastest Level 2 EV Charger to North America

EIN Flo Core MAX 400

March 24, 2022

As part of its participation in the National Automobile Dealership Association (NADA) annual trade show in Las Vegas, FLO is officially introducing the CoRe+ MAX charger, its fastest, most versatile level 2 EV charger destined for North American businesses.

Building on FLO’s best-selling commercial CoRe+ model, the CoRe+ MAX version offers the same clever versatility and customization up to 80 AMPs. It delivers a maximum power output of 19.2 kW, making it the most powerful level 2 charger available in the North American market.

“We strive to build the most robust and reliable chargers on the market because we know that our commercial and fleet customers depend on those features every day,” said Nathan Yang, Chief Product Officer at FLO. “Our original CoRe+ product has met the highest standards of dependability for years, thanks to its rugged design and capacity to withstand extreme weather conditions, making it a highly successful product in its own right. Now, we have created the Core+ MAX, which builds upon the very best features of its predecessor to offer even more impressive power and versatility.”

“We believe there is a growing need for adaptable commercial chargers given the broad array of EVs coming to market in the near future. Owners can limit the maximum available amperage to charge light duty electric vehicles and pick-up trucks during the day while later increasing capacity to charge larger vehicles, such as electric school buses, overnight. At a quarter of the cost of a typical DCFC charger, the CoRe+ MAX offers great value, while giving fleet operators a solution that will remain relevant for many years to come,” said Yang.

The CoRe+ MAX charger has been installed on a pilot basis in multiple locations in Canada and in the United States in the last 12 months and has already been adopted by established fleet managers. The product is also entirely compatible with other FLO chargers as part of networked installations. The CoRe+ MAX is currently in production for the Canadian market and items can already be ordered by site hosts wanting to build or expand their EV charging installations.

Go HERE for more information

Related Articles


Latest Articles

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…

  • Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    December 15, 2025 Work to build more than 1,400 new homes across Nova Scotia – about two-thirds at Shannon Park in Dartmouth – will soon begin with funding from the Province and the federal government. Housing Minister John White and federal Minister of Housing and Infrastructure Gregor Robertson announced $300 million to build 1,430 new… Read More…


Changing Scene

  • CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    December 15, 2025 For the tenth consecutive year, CSA Group has been awarded as one of Greater Toronto’s Top Employers for 2026 by Mediacorp Canada Inc. This milestone reflects CSA Group’s continued commitment to fostering a workplace culture that supports employee wellbeing, professional growth, and community engagement. CSA Group’s global headquarters, located in Toronto, offers… Read More…

  • Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    December 15, 2025 With $6 million in federal funding, Hydro Ottawa is introducing the Ottawa Distributed Energy Resource Accelerator (ODERA) program. Through this program, Hydro Ottawa will use AI-enhanced predictive analytics to accurately forecast peak demand, which will then inform the real-time balancing of supply and demand. This will be achieved by using a technology… Read More…

  • Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    December 15, 2025 Stanpro is proud to announce the results of its annual Katy’s Donation Day, held on December 3, 2025. This year, the initiative resulted in a record donation of over $100,000, making this the highest contribution in the history of this program. The funds raised will be distributed to over 80 charitable organizations… Read More…

  • EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    December 15, 2025 EB Horsman is pleased to announce the appointment of Cory Carter as Branch Manager of our Victoria location, effective November 10, 2025. With over two decades of experience in the electrical, lighting, and retail industries, Cory brings a proven track record of leadership, sales growth, and customer relationship management. Throughout his career,… Read More…