Eaton While-in-Use Weather Protective Covers

January 17, 2023

From spring-loaded metallic covers to Eaton’s While-In-Use Enclosures, Eaton’s family of weatherproof covers are designed for longevity in virtually any outdoor, indoor, wet or damp location. Whether you’re looking for impact and corrosion-resistant products for an industrial job or flexible installation options for a residential home, you can rely on Eaton’s superior performance to help get the job done quickly without sacrificing quality.

Eaton While-in-Use Weather Protective Covers:

  • Meets 2017 & 2020 406.9 (B)(1) Extra Duty requirement forany application
  • Rugged UV-resistant polycarbonate cover and back protectsdevices without cracking or breaking and is non-corrosive
  • No disassembly required for vertical or horizontal mountingorientation
  • 1-Gang box includes 3 inserts for 16 different configurations
  • 2-Gang box includes 5 inserts for over 55 different configurations
  • Box inserts accommodate decorator and GCFI devices,duplex receptacles, toggle switches and round receptacles
  • Cover cord opening fits #12 AWG or lighter cord
  • Exceeds UL outdoor low voltage landscape lighting requirements
  • Box cover includes pre-mounted gasket

Go HERE for more information

Source

Related Articles


Latest Articles


Changing Scene

  • Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    May 26, 2025 Siemens will invest CAD $150 million over five years to establish a Global AI Manufacturing Technologies Research and Development (R&D) Center for Battery Production in Canada. The new R&D center, located initially at Siemens Canada’s head office in Oakville, as well as in Toronto and Kitchener-Waterloo, Ontario, will focus on developing cutting-edge AI manufacturing technologies with an initial emphasis… Read More…

  • Honda Postponing Ontario EV Supply Chain Investment by Two Years

    Honda Postponing Ontario EV Supply Chain Investment by Two Years

    May 26, 2025 Honda is postponing its plan to invest in a comprehensive EV supply chain in Ontario. The CBC reported that the investment is being push back by two years. “Due to the recent slowdown of the EV market, Honda Motor has announced an approximate two-year postponement of the comprehensive value chain investment project in Canada…. Read More…

  • Serge Leblanc Named Sonepar Canada Interim President

    Serge Leblanc Named Sonepar Canada Interim President

    May 26, 2025 George McClean, former President of Sonepar Canada, has decided to leave Sonepar for an opportunity outside of the electrical industry. Serge Leblanc, current President of Lumen Canada, has been appointed interim President of Sonepar Canada. Leblanc will manage both responsibilities until a successor is named.  Leblanc joined Lumen in 1997 and has… Read More…

  • Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    May 26, 2025 On Monday, May 26, the Ontario Building and Construction Tradeswomen (OBCT), will host its first-ever Advocacy Day at Queen’s Park. Tradeswomen from across the province will gather to meet with Members of Provincial Parliament, including Minister of Labour David Piccini, to advocate for progress in the skilled trades for tradeswomen. OBCT’s top priorities include:… Read More…