Fluke 302+ CAT III Digital Clamp Meter

    July 19, 2024

    The Fluke 302+ is a compact, easy-to-use digital clamp meter made to fit the way you work. It is the perfect first-pass troubleshooting tool: small enough to fit in a work bag, tough enough to withstand daily use, and extremely simple to use. All without compromising safety. For everyday applications, where True-RMS accuracy isn’t needed, the Fluke 302+ delivers reliable measurements time after time.

    Fluke 302+ Additional Features

    • The Fluke 302+ CAT III Digital Clamp Meter is more compact, making the use of clamp-type ammeter more flexible and simpler
    • Measure AC current up to 400A
    • 30 mm large jaw
    • High accuracy of 1.8%
    • Backlit display
    • Two-year warranty

    Go HERE for more information

    Related Articles


    Latest Articles

    • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

      Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

      For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

    • What 2025 Revealed About Canada’s Electrical Industry

      What 2025 Revealed About Canada’s Electrical Industry

      December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

    • Considerations for EV Charging Installation and Site Preparation

      Considerations for EV Charging Installation and Site Preparation

      December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

    • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

      Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

      December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


    Changing Scene