Philips Achieves Energy Star’s Partner Of The Year: Sustained Excellence

Philips Energy Star Award

The U.S. Environmental Protection Agency has recognized Philips Lighting with a 2015 Energy Star (ES) Partner of the Year – Sustained Excellence Award for the company’s continued leadership in protecting the environment through superior energy efficiency achievements. For the third year in a row, Philips took top honours with over 500 Energy Star certified products in 2014, including SlimStyle, the world’s first Energy Star certified flat light bulb. Over 68 percent of the company’s product lines are Energy Star certified, including the recently announced 60-watt LED equivalent bulb with dimming that mimics the warm glow of an incandescent.

Since its inception in 1992, Energy Star and its partners have helped prevent a total of more than two billion metric tons of greenhouse gas emissions. In 2013 alone, Energy Star and its partners provided $11 billion in societal benefits by reducing damage from climate change.

Philips has continued to drive the adoption of energy-efficient LED technology by working with utility partners that encourage switching to LEDs through incentive programs, as well as working with retail, energy and commercial partners to drive education and awareness of the benefits of the technology. In 2014, the company grew its utility rebate program by 24%, translating into millions of dollars in incentives for consumers.

The 2015 Partner of the Year – Sustained Excellence Awards are given to a variety of organizations to recognize their contributions to reducing greenhouse gas emissions through superior energy efficiency achievements. These winners have reduced greenhouse gas emissions by setting and achieving aggressive goals, and employing innovative energy efficiency approaches. These awards recognize ongoing leadership across the Energy Star program, including energy-efficient products, services, new homes and buildings in the commercial, industrial and public sectors.

Find out more: www.energystar.gov.

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…

  • Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    September 16, 2026 This recall involves Goal Zero YETI 3000X power stations. The silver and black portable power stations measure about 62 centimetres (24.4 inches) high, 47 centimetres (18.5 inches) wide, 57 centimetres (22.3 inches) deep and weigh approximately 42 kilograms (92 pounds). The power stations have yellow handles and a digital display at the… Read More…


Changing Scene

  • Innovair Solutions Acquires TRM Heating Cables

    Innovair Solutions Acquires TRM Heating Cables

    September 18, 2026 Innovair Solutions has announced the acquisition of TRM Heating Cables, a Toronto-based Canadian company specializing in heating cables for commercial and industrial applications. Founded in 2001, TRM has built strong technical expertise in the sale and installation of specialized products, including self-regulating cables, mineral-insulated cables and electric floor heating systems. The company… Read More…

  • Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    September 17, 2026 From preparing the next generation of skilled workers to supporting one of the world’s largest sporting events, this year’s recipients demonstrate how electrical safety supports Ontario’s future As Ontario electrifies homes, transportation and industry, the Electrical Safety Authority (ESA) has recognized the organizations and individuals helping ensure safety keeps pace with that… Read More…

  • NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    September 17, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $100 million loan with Morguard Corporation to enable energy‑efficient retrofits across a portfolio of approximately 30 properties in Canada. Morguard is a fully integrated real estate firm with more than $24.2 billion in assets under management across North America. Morguard will collaborate… Read More…

  • Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    September 16, 2026 New Canadian-led infrastructure project will help build secure and reliable computing capacity responsibly On September 14, 2026, the Government of Canada welcomed Bell Canada’s planned investment to expand its Bell AI Fabric capacity in Saskatchewan, an important step toward building the sovereign computing capacity Canada needs to compete and succeed in the… Read More…