ESA Increases Ontario Wiring Fees

Ontario Wiring Fees

Jan  15 2016

 

As of January 8, all Ontario wiring fee items have increased by an average 1%.

A number of individual fee prices have also been adjusted:
• all Service Reconnect fees will equalize at 2015 rate of $296 followed by the 2016 1% fee increase
• all Miscellaneous fees will equalize at 2015 rate of $150 followed by the 2016 1% fee increase
• Labour fee and Plan Review items increase by 1.75%
• an adjustment to the way fees are set for large new residential single family dwellings. “Very large houses” are defined as 7,000 sq. ft. or more of indoor liveable space. Fees for “very large houses” with existing service size breaks of up to 200A and between 201 to 400A will increase from $217 to $452. Fees for “very large houses” with service size break 401A and over will follow commercial pricing methods instead of residential.
• An adjustment to the way fees are set for new apartment buildings. The existing fee of $96 for each of the first 4 units remains. The fee for additional units will remain $47 per unit when the device count per unit 80 or less, but increase to $96 per unit for 81 + devices.

Last year, ESA consulted on these changes with stakeholders via its advisory councils and through an open call for comment.

Find out more: https://www.esasafe.com/contractors/esa-fees/.

 

Related Articles


Latest Articles


Changing Scene

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…

  • Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    July 22, 2025 Building-Integrated Photovoltaics (BIPV) manufacturer, Mitrex proudly announces that its transformative SunRise Residential project in Edmonton, Alberta, has earned the Guinness World Record for the largest solar panel mural globally. This landmark project showcases Mitrex’s innovative BIPV solar panels, blending cutting-edge solar technology with vibrant cultural artistry to redefine sustainable architecture. Sustainable Architecture with BIPV Spanning over 30,000 square feet, the Mitrex eFacade PRO plus… Read More…

  • Nexans Unveils a Cable Made with 100% Recycled Materials

    Nexans Unveils a Cable Made with 100% Recycled Materials

    July 24, 2025 Nexans has reached a major milestone in its sustainability journey by developing a prototype cable made entirely from recycled materials — a first in the company’s history. This innovation combines technical performance, industrial feasibility, and a drastically reduced environmental footprint, marking a decisive step forward in circular economy. A cross-continental success story… Read More…

  • EFC Welcomes New Manufacturer Member: MGM Transformers

    EFC Welcomes New Manufacturer Member: MGM Transformers

    July 24, 2025 Since 1974, MGM Transformers has produced tough and trusted transformers designed to get the job done right. As a leading manufacturer, the company employs a highly experienced and dedicated engineering team that excels in custom designs. MGM Transformers is committed to excellent quality and service, offering industry-leading lead times and exceptional customer service. MGM Transformers specializes… Read More…