Valard Construction Selected by Statnett for Construction of the Fjotland-Ertsmyra-Lyse-Duge Transmission Line

Valard Construction

May 18, 2016

Valard Construction announced that it has been selected by Statnett to construct the Fjotland-Ertsmyra-Lyse-Duge Transmission Line. The project is part of Statnett’s larger Vestre korridor or West Corridor Project.

Valard’s scope of work includes the construction of over 100 kilometers (km) of new 420 kilovolt (kV) alternating current (AC) transmission line and the decommissioning of approximately 90 km of existing 300 kilovolt (kV) transmission line. Construction is expected to begin later this year and is expected to be complete at the end of 2021.

“This project is a good fit given Valard’s extensive transmission construction experience as well as with our growth strategy,” said Adam Budzinski, President of Valard Construction. “We appreciate the confidence Statnett has placed in us for this project and look forward to continuing our positive relationship with them and the people of Norway.”

The project consists of over 100 km new 420 kV AC overhead transmission lines:
• Duge – Lyse 17 km
• Lyse – Tjørhom 25 km
• Tjørhom – Ertsmyra 27 km
• Ertsmyra – Fjotland 20 km
• Re-routing Lysebotn and Fjotland 12 km
• New line construction 2016‐2019

Other project details include:
• Decommissioning of approximately 90 km of existing 300 kilovolt (kV) transmission line
• High altitude construction areas
• Significant use of helicopters for construction and decommissioning
• Decommissioning 2019‐2021.

This contract has been awarded after being approved by Statnett’s Board of Directors.

 

 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…