BC Invests $210,000 in Trades Training for Power Line Technicians

BC Invests $210,000 in Trades Training for Power Line Technicians

September 25, 2016

The BC government has announced plans to invest $210,000 for skills training in high-priority trades seats at BC Hydro.

The investment, made through the Industry Training Authority (ITA), will create 224 more seats in the power line technician program available through to March 31, 2017. The funding is part of the ITA’s allocation to BC post-secondary institutions and training providers to run various training programs throughout the province.

BC Hydro’s Trades Training Centre in Surrey opened in April 2013. The centre is a certified education institution that provides technical and trades training for both BC Hydro and non-BC Hydro trainees. It includes classrooms, lab spaces, workshops, a mock substation and training yards with overhead and underground lines.

BC Hydro uses a 3-D applications tool to allow power line technician apprentices to build, test, troubleshoot and simulate work on equipment, including voltage regulators and transformers. Apprentices can build transformer banks on a “virtual” distribution line, communicate to an instructor for feedback, and practice complex work procedures using the 3-D simulation in the classroom prior to applying their skills in the training yards.

The British Columbia government has been working in partnership with the ITA to begin building a demand-driven trades training system with funding aligned to specific in-demand trades. The ITA leads and coordinates British Columbia’s skilled trades system by working with employers, employees, industry, labour, training providers and government to issue credentials, manage apprenticeships, set program standards and increase opportunities in the trades.

“There is growing interest in trade careers across the province and the investment announced today will ensure British Columbians have the opportunity to access training in high-priority trades so that they are equipped with the right skills to respond to the job opportunities to come,” says Gary Herman, CEO, Industry Training Authority.

B.C. is expecting up to one million job openings by 2025 due to retirements and economic growth. Eight of every 10 of these job openings will require post-secondary education or trades training.

Photo courtesy of BC Hydro.

 

 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…