NS Power to Work with World-Class Industry Leaders on Clean Energy Project

NS Power to Work with World-Class Industry Leaders on Clean Energy Project

 

October 21, 2016

Nova Scotia Power will work with industry leaders like Tesla and Opus One Solutions as part of a multi-year pilot project to provide cleaner, more reliable electricity to a Nova Scotia community.

The goal is to successfully integrate new technologies onto the province’s grid as it continues a transition to renewable energy sources. The project, known as the Intelligent Feeder Project, will involve installing a grid-size battery (Tesla Powerpack) and up to 10 residential batteries (Tesla Powerwalls) on a feeder line powered by a wind turbine or other distributed energy generator.

Sensors will be placed on the feeder line to monitor and gather information about local system activity and, using Opus One’s GridOS real-time intelligent energy networking platform, will be analysed and fed back to NS Power’s control centre. This project will help balance the variability of renewable energy generation, minimize power outages for customers, and use generation resources to their maximum efficiency.

Over the last decade, NS Power has been making the most aggressive transition to renewable energy in Canada. The utility reached 27% renewable generation in 2015 from just 7% in 2007, and has a requirement of 40% by 2020.

“Our momentum in this area remains strong,” says Karen Hutt, President and CEO of Nova Scotia Power. “Projects like this will build on the work we’ve done and push us closer to a sustainable energy future… We see major promise in energy storage integration and are looking forward to what real-time feeder data will allow us to achieve in terms of performance optimization.”

Opus One is leading the project, funded in part by Sustainable Development Technology Canada and formally named the Transactive Energy Network for Clean Generation, Energy Storage, Electric Vehicle Charging and Microgrid Integration. Construction is scheduled for 2017 and the project will be active in 2018.

Find out more: www.electricenergyonline.com/detail_news.php?ID=600526&titre=NS+Power+to+work+with+world-class+industry+leaders+on+innovative+clean+energy+project .

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…