Leading The Charge; Nova Scotia Power Developing Coast to Coast Electric Vehicle Charging Network

Nova Scotia Power

 

 

August 11, 2017

Nova Scotians will soon be able to drive electric vehicles from Sydney to Yarmouth without having to worry about where they can charge their batteries.

Nova Scotia Power announced today it will install 12 electric vehicle fast charging stations across the province, as part of a pilot project to study the impact and usage of the network on the electrical system. The network will be ready for use in spring of 2018.

This new network will make it easier and more convenient for electric vehicle owners to drive with ease between Yarmouth and Sydney without worrying about running out of a battery charge. The average charge time for these types of chargers is 15 to 30 minutes, whereas most public chargers in Nova Scotia take 3-8 hours, and a regular outlet at your home can take 12 hours or more. 

“I’m thrilled to see this investment and endorsement by Nova Scotia Power that electric vehicles are the way of the future,” said David Swan, electric vehicle owner, Tatamagouche resident and past Board Member of Electric Mobility Canada. “Up until now, higher vehicle purchase costs and lack of infrastructure were significant barriers to consider buying an electric vehicle. A fast charging network combined with more electric vehicles in the market creates a win-win situation for more sustainable transportation in Nova Scotia.”  

In a 2016 survey undertaken by Nova Scotia Power, one third of respondents said they would consider an electric vehicle as their next car, while 65 per cent said they would consider an electric vehicle if more charging stations were available.

http://www.nspower.ca/en/home/newsroom/news-releases/leading-the-charge.aspx

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…