Two Research Centres Team Up to Study the Impact of Climate Change on Wind Energy Potential

Nergica

 

May 4, 2018

Ouranos, a research consortium dedicated to regional climatology and climate change adaptation, and Nergica, an applied research centre specializing in renewable energy, have begun a research project that aims to assess the impact that climate change will have on wind energy potential in the decades to come. The project will be carried out in a partnership with Hydro-Québec, Manitoba Hydro, Ontario Power Generation, and the Quebec Wind Energy Cluster.

With power purchase agreements of wind farms set to expire between now and the end of the next decade, the wind industry is poised to potentially undergo large-scale repowering of its wind farms. The effect of climate change on wind regimes and icing events must be taken into account in order to ensure the best planning possible for repowering wind turbines operating in cold climates.

“The repowering process aims to modernize wind turbines in order to improve wind farm efficiency and performance,” explains Simon-Philippe Breton, Project Manager, Research and Innovation at Nergica. “To date, very few studies have been conducted that take climate change into account when assessing future wind potential in Canada. This research project will help to anticipate changes in energy yields and to analyze the impacts on wind farm production costs and profitability. Ultimately, different stakeholders in the industry will be able to make choices that are best suited to a changing climate.”

Nergica will coordinate the analysis of the impact of climate change on wind production, while Ouranos will notably produce new climate simulations for North America for the period from 1950 to 2100. “In the past, Ouranos carried out a number of projects on hydroelectricity-related issues,” explains Jacinthe Clavet-Gaumont, co-coordinator of Ouranos’ Energy program. “This new partnership with Nergica reflects Ouranos’ desire to expand its research horizons and support climate change adaptation efforts for other renewable energy sources. This pan-Canadian project will allow our climate and economic analyses to be shared in the public domain, particularly those related to wind, which is a variable that hasn’t been studied as much in climate simulations.”

Canadian grid operators Hydro-Québec, Manitoba Hydro and Ontario Power Generation will contribute to the project by providing meteorological observations and energy production data, in addition to their analytical expertise. The study will allow them to fine-tune their long-term wind planning and increase reliability. The Quebec Wind Energy Cluster will participate in the economic analysis and in sharing the results with the industry.

The three-year project, evaluated at over $800,000, is being financed by the Natural Sciences and Engineering Research Council of Canada (NSERC), InnovÉÉ, Hydro-Québec and the Green Climate Fund.

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric has announced the company has rebranded as Bernie’s Electric Supplies Ltd, a nod to their founder. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values that have guided the company for nearly 50 years. As we grow and evolve, this name Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…