Ontario’s Local Hydro Utilities Smash Provincial Conservation Goals

Hydro

 

Sept 10, 2018

Mid-way through Ontario’s 2015-2020 Conservation First Framework, 69% of the target has already been met. The framework maps out the province’s energy conservation goals for the period. (Shown in photo: Festival Hydro’s battery storage project in Stratford, Ontario, expected to have a total capacity of the facility will be 4.4 megawatts.)

The framework emphasizes coordinated efforts through all stages of energy planning, with the aim of reducing 8.7 terawatt hours (TWh) of electricity consumption in Ontario by the end of 2020. Local hydro utilities are charged with the lion’s share of reductions, carrying responsibility for 7 TWh of the total.

According to the province’s Independent Electricity System Operator (IESO), the body that manages Ontario’s  power grid, local hydro utilities achieved 1.8 TWh of energy savings in 2017, conservation’s best performing year. When combined with 2015-2016 results, these utilities have achieved 4.9 TWh of energy savings.

“The mid-term results show positive progress in promoting a culture of conservation across the province,” says Brian Wilkie, Chair of the Electricity Distributors Association Board of Directors. “To put it in perspective, the savings could power 500,000 homes in the province — a massive accomplishment.”

Besides their responsibility for meeting lofty conservation goals, Ontario’s local hydro utilities were required to hit the stretch targets on a tighter budget than ever before. Results were achieved at the lowest cost on record, just 2.5–3 cents a kilowatt hour.

Photo source: Power of Local Hydro, https://poweroflocalhydro.ca/largest-battery-storage-facility-in-canada-calls-stratford-home/, published by the Electricity Distributors Association

Related Articles


Latest Articles


Changing Scene

  • SurgePure Corporation Expands into the Mid-West with New Representation Partner, Advance Electrical Agency

    SurgePure Corporation Expands into the Mid-West with New Representation Partner, Advance Electrical Agency

    August 1, 2025 SurgePure Corporation is proud to announce its new partnership with Advance Electrical Agency, who will represent the company across Saskatchewan, Manitoba, and Western Ontario. Led by principals Darren Churchwell and Bob Fiesel , the Advance team is part of a well-established agency known for representing some of the most respected manufacturers in… Read More…

  • Munden Partners with Valid Manufacturing in Atlantic Canada

    Munden Partners with Valid Manufacturing in Atlantic Canada

    August 1, 2025 Munden Enterprises has announced that they are back in the custom enclosure business through a new partnership with Valid Manufacturing Ltd. Expect Canadian-made, engineered solutions for industrial, utility, transportation, wastewater, renewables, and beyond. Whether you need a bare enclosure or a fully assembled panel, Munden is here to help. Reach out to… Read More…

  • JEHS Joins Forces with NOARK to Deliver Smarter Electrical Solutions in Ontario

    JEHS Joins Forces with NOARK to Deliver Smarter Electrical Solutions in Ontario

    August 1, 2025 NOARK Electric is pleased to announce a new partnership with Cambridge, Ontario based manufacturing representitive, JEHS. This strategic collaboration will expand NOARK’s reach and customer support across Ontario and beyond, bringing reliable and innovative electrical solutions to a wider audience. With over 50 years of combined sales experience, JEHS brings a strong… Read More…

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…