CanWEA Best Practices for Mobile Crane Safety in Wind Energy Operations

CanWEA Best Practices

Mar 24, 2020

By Phil McKay

Canada’s wind power operations and maintenance (O&M) leaders have generated another one-of-a-kind resource to set the bar for health and safety in the industry. Wind energy site staff and contracted technicians are responsible for identification and resolution of a wide range of worn or damaged equipment on a wind farm. Wind turbines are made up of many major components that endure harsh environments and constant operation. This can include blades, gearboxes, generators, motors, hydraulic equipment, transformers and other large equipment necessary to keep the machines generating clean power. The industry makes regular use of mobile cranes for component repairs and replacements at operational sites across the country. These activities can involve a crane service provider, third party technicians and project managers, full-time site staff and other specialists needed for the job.

The Best Practices for Mobile Crane Safety in Wind Energy Operations were developed by stakeholders from across disciplines to provide wind farm site staff with a set of guidelines for safe execution of mobile crane operations. The resource is aimed at equipping wind turbine technicians, site managers, health and safety specialists and directors with useful information to spur further development and collaboration in state-of-the-industry thinking.

The guide begins by setting some common definitions for the industry using existing standards and internal company policies. It also clearly defines the expectations from industry for the various roles required during a lift operation. Some of these roles include:

• Crane Operator
• Crane User
• Lift Supervisor
• Rigger
• Tag Line Operator
• Spotter

The guide then moves on to several considerations for the stages of a lift operation including; Pre-lift, Setup and During Work, and Demobilization. This part was developed through an iterative approach comparing internal policies and procedures with elements taken from each contributor to arrive at a true industry best practice.

Through the development process, it was identified that a collection of references to Canadian regulations and international resources would prove useful. In addition, a collection of pre-lift job briefings and checklists was created and merged to create an exhibit for direct application to job sites.

CanWEA is excited to offer this new resource to the industry and continue the advancement of safe site practices. The O&M Caucus is already considering what to tackle next to make Canada’s wind fleet even more productive.

Visit the O&M Health and Safety page for this and more resources and to find out how you can get involved in future projects.

Phil McKay is Operations and Maintenance Program Director at the Canadian Wind Energy Association

Source: https://canwea.ca/operations-and-maintenance/health-and-safety/

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…