BC Hydro Programs to help Businesses with Operational Savings

EIN bcHydro logo 400

July 16, 2020

As businesses in B.C. reopen, there are opportunities through BC Hydro programs to help them get back on firmer footing faster.

There’s now a 20% bonus for all BESI (business energy saving incentives) projects for small and medium business customers and greater opportunities for virtual assessments of businesses as COVID-19 limits access to facilities.

“As the BC government starts to relax restrictions on the likes of dentists and restaurants, our message is: ‘we want to help you on your operational savings,‘” says Paul Seo, senior program manager with BC Hydro.

Here are some of the highlights of BC Hydro programs you should be aware of, starting with help for those businesses hardest hit by the pandemic.

COVID-19 Relief Fund and Payment Options

Customers with small businesses forced to close due to COVID-19 may be eligible to have their business electricity use charges waived for up to the three months.

Medium and large businesses aren’t eligible for the Relief Fund but may be eligible for interest-free bill deferrals and payment plans. They can get more information from their key account manager or by calling 1 800 224 9376.

20% Bonus for BESI Projects

For small and medium businesses, help with capital costs comes in the form of a 20% bonus on incentives of energy-saving products. That’s on top of operational savings that last year averaged about $2,800 per year, per project.

Just announced this month, the bonus applies to project applications made after June 15, 2020, and there’s a requirement that they’ll be submitted by December 31, 2020. Any projects submitted after that date will lose the 20% bonus.

The incentive is only applicable to small and medium business customers and BESI applications.

$1,500 Fixed Audit is Alive and Kicking

The $1,500 fixed audit that they offer for large key account commercial businesses was a huge hit when first introduced in 2018, but customers have been slower to take advantage in the past year. Seo believes that some customers might have thought it was a one-time offer that’s no longer available, which isn’t the case.

“This offer targets key account customers with smaller buildings that may not qualify for full energy studies,” he says. “We’ve introduced this flat fee of $1,500, which is more of an audit or assessment than a full-blown study. A consultant can come in, do a quick walk-through and then they can send it to us as either a BESI application or a custom incentive.“

Click here to learn more

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…