Blended Learning Courses for the 2018 Canadian Electrical Code

EIN TSBC 2018 400

Oct 2, 2020

This course will provide Class A, B or C FSRs the 8 hours of continuing education required for certificate renewal.

Upcoming sessions:

  • October 20 (Part 1) & October 21 (Part 2) – Registration opening October 1st
  • November 17 (Part 1) & November 18 (Part 2) – Registration opening October 22nd
  • December 8 (Part 1) & December 9 (Part 2) – Registration opening November 19th

Course Overview:

On January 1, 2020, BC adopted the 2018 version of the Canadian Electrical Code (Part I, Twenty-fourth Edition, Safety Standard for Electrical Installations, CSA Standard C22.1-18). The new version includes several changes to support electrical workers in the safe installation and maintenance of electrical equipment and systems. 

This course provides an in-depth overview of the 2018 Canadian Electrical Code and the changes to BC’s Acts and Regulations. The course includes interpretations and applications of the code, as well as new definitions and tables.

 

Continuing Education Requirement:

The Electrical Safety Regulation (section 10.1) now requires Class A, B or C Field Safety Representatives (FSRs) to complete 8 hours of continuing education before they can renew their certificate of qualification. FSRs should renew their certification on or before the expiry date listed on their wallet cards. This course will provide Class A, B or C FSRs the 8 hours of continuing education required for certificate renewal.

Go HERE to register

Related Articles


Latest Articles


Changing Scene

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…

  • Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    July 22, 2025 Building-Integrated Photovoltaics (BIPV) manufacturer, Mitrex proudly announces that its transformative SunRise Residential project in Edmonton, Alberta, has earned the Guinness World Record for the largest solar panel mural globally. This landmark project showcases Mitrex’s innovative BIPV solar panels, blending cutting-edge solar technology with vibrant cultural artistry to redefine sustainable architecture. Sustainable Architecture with BIPV Spanning over 30,000 square feet, the Mitrex eFacade PRO plus… Read More…

  • Nexans Unveils a Cable Made with 100% Recycled Materials

    Nexans Unveils a Cable Made with 100% Recycled Materials

    July 24, 2025 Nexans has reached a major milestone in its sustainability journey by developing a prototype cable made entirely from recycled materials — a first in the company’s history. This innovation combines technical performance, industrial feasibility, and a drastically reduced environmental footprint, marking a decisive step forward in circular economy. A cross-continental success story… Read More…

  • EFC Welcomes New Manufacturer Member: MGM Transformers

    EFC Welcomes New Manufacturer Member: MGM Transformers

    July 24, 2025 Since 1974, MGM Transformers has produced tough and trusted transformers designed to get the job done right. As a leading manufacturer, the company employs a highly experienced and dedicated engineering team that excels in custom designs. MGM Transformers is committed to excellent quality and service, offering industry-leading lead times and exceptional customer service. MGM Transformers specializes… Read More…